Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000445/202300429 January 2024Integrated Inspection Report 05000445/2023004 and 05000446/2023004
ML24018A10718 January 2024Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for InformationCommercial Grade Dedication
IR 05000445/202340230 November 2023NRC Security Inspection Report 05000445/2023402 and 05000446/2023402Affidavit
IR 05000445/202300523 August 2023Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023
IR 05000445/202330121 August 2023NRC Examination Report 05000445/2023301 and 05000446/2023301
IR 05000445/202301120 July 2023Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011Safe Shutdown
Fire Barrier
Fire impairment
Operability Determination
Fire Protection Program
IR 05000445/202300214 July 2023Integrated Inspection Report 05000445/2023002 and 05000446/2023002High Radiation Area
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Through Wall Leak
Fire Protection Program
IR 05000445/202300113 April 2023Integrated Inspection Report 05000445/2023001 and 05000446/2023001Internal Flooding
Enforcement Discretion
VT-2
Functionality Assessment
Operability Determination
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Power change
IR 05000445/202340129 March 2023NRC Security Inspection Report 050004452023401 and 050004462023401 (Cover Letter Only)Affidavit
IR 05000445/202301024 March 2023Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010Safe Shutdown
Boric Acid
Probabilistic Risk Assessment
Emergency Lighting
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
IR 05000445/20220061 March 2023Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006)Fitness for Duty
Commercial Grade Dedication
License Renewal
Exemption Request
COVID-19
IR 05000445/202200426 January 2023Integrated Inspection Report 05000445/2022004 and 05000446/2022004Offsite Dose Calculation Manual
Fire Barrier
Commercial Grade Dedication
Temporary Modification
Functionality Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Operability Determination
Through Wall Leak
Fire Protection Program
Grace period
Substantial potential for an overexposure
Operability Assessment
Siren
Overexposure
IR 05000445/202201023 January 2023TI-194 Report 05000445/2022010 and 05000446/2022010Operator Manual Action
Open Phase Condition
IR 05000445/202240119 December 2022Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only)Cyber Security
Affidavit
IR 05000445/20224207 December 2022Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420Affidavit
ML22319A07315 November 2022Review of the Fall 2021 Steam Generator Tube Inspection Report
IR 05000445/20220031 November 2022Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of ViolationSafe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Operating Basis Earthquake
Functionality Assessment
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
Siren
ML22299A0561 November 2022Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of ViolationSafe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Severe Accident Management Guideline
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Fire Protection Program
IR 05000445/202200522 August 2022Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000445/20224039 August 2022NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report)
IR 05000445/20220025 August 20222nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002Safe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Nonconservative Technical Specifications
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
ML22174A27922 June 2022Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000445/2022003 and 05000446/2022003) and Request for InformationTemporary Modification
IR 05000445/202200126 April 2022Integrated Inspection Report 05000445/2022001 and 05000446/2022001Ultimate heat sink
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
IR 05000445/202240225 April 2022Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402
IR 05000445/20210062 March 2022Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
IR 05000445/20200117 February 2022Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of ViolationSafe Shutdown
Probabilistic Risk Assessment
Fire impairment
Temporary Modification
Arc flash
COVID19
Fire Protection Program
IR 05000445/202100425 January 2022Integrated Inspection Report 05000445/2021004 and 05000446/2021004Safe Shutdown
Boric Acid
High Radiation Area
Commercial Grade Dedication
Weld Overlay
Post Accident Monitoring
Internal Flooding
Nondestructive Examination
Temporary Modification
Cyber Security
Functionality Assessment
Locked High Radiation Area
FLEX
Operability Determination
Time Critical Operator Action
Liquid penetrant
Fire Protection Program
Substantial potential for an overexposure
Overexposure
IR 05000445/202101213 January 2022TI-194 Report 05000445/2021012 and 05000446/2021012Probabilistic Risk Assessment
Operator Manual Action
Open Phase Condition
IR 05000445/202140515 December 2021Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405
IR 05000445/20214039 December 2021Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403Coronavirus
COVID-19
IR 05000445/20210033 November 2021Integrated Inspection Report 05000445/2021003 and 05000446/2021003Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000445/202130119 October 2021NRC Examination Report 05000445/2021301 and 05000446/2021301Pandemic
COVID-19
IR 05000445/20210107 October 2021Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010Condition Adverse to Quality
Pandemic
Coronavirus
IR 05000445/20214019 September 2021Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401Fitness for Duty
Coronavirus
COVID-19
IR 05000445/20210051 September 2021Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005)Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
IR 05000445/202140219 August 2021Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402Fitness for Duty
Coronavirus
COVID-19
IR 05000445/202100210 August 2021Integrated Inspection Report 05000445/2021002 and 05000446/2021002Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000445/202100123 June 2021Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001High winds
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000445/202140417 June 2021Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404Affidavit
ML21131A09511 May 2021CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001High winds
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Coronavirus
Fire Protection Program
Power change
IR 05000445/20210116 May 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation
IR 07200074/202140117 March 2021(CPNPP) Independent Spent Fuel Storage Installation (ISFSI) IR 07200074/2021401 3-3
IR 05000445/20200063 March 2021Annual Assessment Letter for Comanche Peak, Units 1 and 2, (Inspection Report 05000445/2020006 and 05000446/2020006)Fitness for Duty
Operator Manual Action
Open Phase Condition
Exemption Request
Coronavirus
IR 05000445/20200049 February 2021Integrated Inspection Report 05000445/2020004 and 05000446/2020004Boric Acid
Internal Flooding
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Coronavirus
COVID-19
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Coast down
IR 05000445/202000122 December 2020Revised Report - Comanche Peak Nuclear Power Plant, Units 1 and 2 -Integrated Inspection Report 05000445/2020001 and 05000446/2020001Offsite Dose Calculation Manual
Enforcement Discretion
Functionality Assessment
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Large early release frequency
Operability Determination
Annual Radiological Effluent Release Report
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000445/202000310 November 2020Integrated Inspection Report 05000445/2020003 and 05000446/2020003Safe Shutdown
Ultimate heat sink
Internal Flooding
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Coast down
IR 05000445/20200106 October 2020Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2020010 and 05000446/2020010Hot Short
Loop seal
Significance Determination Process
Power-Operated Valves
Power Operated Valves
ML20265A04221 September 2020Commanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of ViolationSafe Shutdown
Fire impairment
Temporary Modification
Arc flash
Coronavirus
Fire Protection Program
IR 05000445/202041010 September 2020Security Baseline Inspection Report 05000445/2020410 and 05000446/2020410Contraband
IR 05000445/20200051 September 2020Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005)Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19