IR 05000445/2023004 | 29 January 2024 | Integrated Inspection Report 05000445/2023004 and 05000446/2023004 | |
ML24018A107 | 18 January 2024 | Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information | Commercial Grade Dedication |
IR 05000445/2023402 | 30 November 2023 | NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 | Affidavit |
IR 05000445/2023005 | 23 August 2023 | Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 | |
IR 05000445/2023301 | 21 August 2023 | NRC Examination Report 05000445/2023301 and 05000446/2023301 | |
IR 05000445/2023011 | 20 July 2023 | Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011 | Safe Shutdown Fire Barrier Fire impairment Operability Determination Fire Protection Program |
IR 05000445/2023002 | 14 July 2023 | Integrated Inspection Report 05000445/2023002 and 05000446/2023002 | High Radiation Area Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Through Wall Leak Fire Protection Program |
IR 05000445/2023001 | 13 April 2023 | Integrated Inspection Report 05000445/2023001 and 05000446/2023001 | Internal Flooding Enforcement Discretion VT-2 Functionality Assessment Operability Determination Maintenance Rule Program Through Wall Leak Fire Protection Program Power change |
IR 05000445/2023401 | 29 March 2023 | NRC Security Inspection Report 050004452023401 and 050004462023401 (Cover Letter Only) | Affidavit |
IR 05000445/2023010 | 24 March 2023 | Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010 | Safe Shutdown Boric Acid Probabilistic Risk Assessment Emergency Lighting Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Maintenance Rule Program |
IR 05000445/2022006 | 1 March 2023 | Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) | Fitness for Duty Commercial Grade Dedication License Renewal Exemption Request COVID-19 |
IR 05000445/2022004 | 26 January 2023 | Integrated Inspection Report 05000445/2022004 and 05000446/2022004 | Offsite Dose Calculation Manual Fire Barrier Commercial Grade Dedication Temporary Modification Functionality Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Large early release frequency Operability Determination Through Wall Leak Fire Protection Program Grace period Substantial potential for an overexposure Operability Assessment Siren Overexposure |
IR 05000445/2022010 | 23 January 2023 | TI-194 Report 05000445/2022010 and 05000446/2022010 | Operator Manual Action Open Phase Condition |
IR 05000445/2022401 | 19 December 2022 | Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000445/2022420 | 7 December 2022 | Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420 | Affidavit |
ML22319A073 | 15 November 2022 | Review of the Fall 2021 Steam Generator Tube Inspection Report | |
IR 05000445/2022003 | 1 November 2022 | Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation | Safe Shutdown Time of Discovery High winds Ultimate heat sink Internal Flooding Enforcement Discretion Operating Basis Earthquake Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline Maintenance Rule Program Control of Heavy Loads Fire Protection Program Siren |
ML22299A056 | 1 November 2022 | Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation | Safe Shutdown Time of Discovery High winds Ultimate heat sink Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Severe Accident Management Guideline Earthquake Maintenance Rule Program Control of Heavy Loads Fire Protection Program |
IR 05000445/2022005 | 22 August 2022 | Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
IR 05000445/2022403 | 9 August 2022 | NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report) | |
IR 05000445/2022002 | 5 August 2022 | 2nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002 | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Stroke time Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Nonconservative Technical Specifications Liquid penetrant Fire Protection Program Dissimilar Metal Weld |
ML22174A279 | 22 June 2022 | Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000445/2022003 and 05000446/2022003) and Request for Information | Temporary Modification |
IR 05000445/2022001 | 26 April 2022 | Integrated Inspection Report 05000445/2022001 and 05000446/2022001 | Ultimate heat sink Past operability Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000445/2022402 | 25 April 2022 | Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402 | |
IR 05000445/2021006 | 2 March 2022 | Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000445/2020011 | 7 February 2022 | Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation | Safe Shutdown Probabilistic Risk Assessment Fire impairment Temporary Modification Arc flash COVID19 Fire Protection Program |
IR 05000445/2021004 | 25 January 2022 | Integrated Inspection Report 05000445/2021004 and 05000446/2021004 | Safe Shutdown Boric Acid High Radiation Area Commercial Grade Dedication Weld Overlay Post Accident Monitoring Internal Flooding Nondestructive Examination Temporary Modification Cyber Security Functionality Assessment Locked High Radiation Area FLEX Operability Determination Time Critical Operator Action Liquid penetrant Fire Protection Program Substantial potential for an overexposure Overexposure |
IR 05000445/2021012 | 13 January 2022 | TI-194 Report 05000445/2021012 and 05000446/2021012 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition |
IR 05000445/2021405 | 15 December 2021 | Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405 | |
IR 05000445/2021403 | 9 December 2021 | Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403 | Coronavirus COVID-19 |
IR 05000445/2021003 | 3 November 2021 | Integrated Inspection Report 05000445/2021003 and 05000446/2021003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000445/2021301 | 19 October 2021 | NRC Examination Report 05000445/2021301 and 05000446/2021301 | Pandemic COVID-19 |
IR 05000445/2021010 | 7 October 2021 | Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010 | Condition Adverse to Quality Pandemic Coronavirus |
IR 05000445/2021401 | 9 September 2021 | Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401 | Fitness for Duty Coronavirus COVID-19 |
IR 05000445/2021005 | 1 September 2021 | Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000445/2021402 | 19 August 2021 | Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402 | Fitness for Duty Coronavirus COVID-19 |
IR 05000445/2021002 | 10 August 2021 | Integrated Inspection Report 05000445/2021002 and 05000446/2021002 | Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000445/2021001 | 23 June 2021 | Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001 | High winds Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000445/2021404 | 17 June 2021 | Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404 | Affidavit |
ML21131A095 | 11 May 2021 | CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001 | High winds Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Coronavirus Fire Protection Program Power change |
IR 05000445/2021011 | 6 May 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation | |
IR 07200074/2021401 | 17 March 2021 | (CPNPP) Independent Spent Fuel Storage Installation (ISFSI) IR 07200074/2021401 3-3 | |
IR 05000445/2020006 | 3 March 2021 | Annual Assessment Letter for Comanche Peak, Units 1 and 2, (Inspection Report 05000445/2020006 and 05000446/2020006) | Fitness for Duty Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
IR 05000445/2020004 | 9 February 2021 | Integrated Inspection Report 05000445/2020004 and 05000446/2020004 | Boric Acid Internal Flooding Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Coronavirus COVID-19 Liquid penetrant Fire Protection Program Dissimilar Metal Weld Coast down |
IR 05000445/2020001 | 22 December 2020 | Revised Report - Comanche Peak Nuclear Power Plant, Units 1 and 2 -Integrated Inspection Report 05000445/2020001 and 05000446/2020001 | Offsite Dose Calculation Manual Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Large early release frequency Operability Determination Annual Radiological Effluent Release Report Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000445/2020003 | 10 November 2020 | Integrated Inspection Report 05000445/2020003 and 05000446/2020003 | Safe Shutdown Ultimate heat sink Internal Flooding Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Coast down |
IR 05000445/2020010 | 6 October 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2020010 and 05000446/2020010 | Hot Short Loop seal Significance Determination Process Power-Operated Valves Power Operated Valves |
ML20265A042 | 21 September 2020 | Commanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation | Safe Shutdown Fire impairment Temporary Modification Arc flash Coronavirus Fire Protection Program |
IR 05000445/2020410 | 10 September 2020 | Security Baseline Inspection Report 05000445/2020410 and 05000446/2020410 | Contraband |
IR 05000445/2020005 | 1 September 2020 | Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |