IR 05000445/2023401

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 050004452023401 and 050004462023401 (Cover Letter Only)
ML23089A166
Person / Time
Site: Comanche Peak  
Issue date: 03/29/2023
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Peters K
Vistra Operations Company
References
IR 2022401
Download: ML23089A166 (1)


Text

March 29, 2023

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000445/2023401 AND 05000446/2023401

Dear Ken Peters:

On February 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an onsite inspection at Comanche Peak Nuclear Power Plant, Units 1 and 2. Additional offsite inspection related activities continued through March 15, 2023, when the results were discussed with Al Marzloff, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

Four findings of very low security significance (Green) are documented in this report. Four of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

A licensee-identified violation which was determined to be of very low security significance is also documented in this report. We are treating this violation as an NCV consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Comanche Peak Nuclear Power Plant.

The following cross-cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross-Cutting Areas: two [H.1] - Resources, one [H.4] - Teamwork, and one [H.8] - Procedure Adherence. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Comanche Peak Nuclear Power Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000445, 05000446 License Nos. NPF-87, NPF-89 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV Signed by Kellar, Ray on 03/29/23

ML23082A264 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML23089A166 (Cover letter)

Entire Report:

X SUNSI Review JMR Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available Cover Letter Only:

X SUNSI Review JMR X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE PSI:PSB SPSI:PSB C:PSB NAME CJewett JRollins RKellar SIGNATURE

/RA/

/RA/

/RA/

DATE 03/23/23 03/23/23 03/29/23