NRC Security Inspection Report 05000445-07-401 and 05000446-07-401. Cover Letter Only
ML073541286
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/20/2007
From: Shannon M
Plant Support Branch Region IV
To: Blevins M
Luminant Generation Co
References
IR-07-401
Download: ML073541286 (2)


Text

UNITED STATES NU CLE AR RE GU LATOR Y C O M M I S S I O N ber 20, 2007

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000445/2007401 AND 05000446/2007401

Dear Mr. Blevins:

On December 13, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Steam Electric Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on December 13, 2007, with Mr. Fred Madden, Director, Regulatory Affairs, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a human performance cross-cutting aspect associated with work controls because the licensee failed to plan for contingencies (H3.a). However, because of the very low security significance and because it was entered into your corrective action program the NRC is treating this violation as a noncited violation consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Comanche Peak Steam Electric Station. The finding was NRC identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response, Security-Related Information-Withhold Under 10 CFR 2.390, and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-445, 50-446 Licenses: NPF-87, NPF-89 Nonpublic Enclosure:

Inspection Report 05000445/2007401 and 05000446/2007401; w/Attachment: Supplemental Information cc w/o enclosure; Fred W. Madden, Director Regulatory Affairs Luminant Generating Company, LLC P.O. Box 1002 Glen Rose, TX 76043