{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
[[Issue date::May 15, 2015]]
-4352 May 15, 2015 Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc.


Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043
-9530


SUBJECT: PALISADES NUCLEAR PLANT, TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000255/2015008
SUBJECT: PALISADES NUCLEAR PLANT, TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000255/2015008


==Dear Mr. Vitale:==
==Dear Mr. Vitale:==
On April 16, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a triennial fire protection inspection at your Palisades Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on April 16, 2015, with Mr. P. Russell and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The NRC inspectors documented one finding of very-low safety significance (Green) in this report. This finding was determined to involve a violation of NRC requirements. However, because of its very-low safety significance, and because the issue was entered into your Corrective Action Program, the NRC is treating the issue as a Non-Cited Violation (NCV) in accordance with Section 2.3.2 of the NRC Enforcement Policy. If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Palisades Nuclear Plant. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Palisades Nuclear Plant. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On April 16, 2015, the U.S. Nuclear Regulato ry Commission (NRC) completed a triennial fire protection inspection at your Palisades Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on April 16, 2015, with Mr. P. Russell and other members of your staff
. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations
, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The NRC inspectors documented one finding of very-low safety significance (Green) in this report. This finding was determined to involve a violation of NRC requirements.
 
However, because of its very-low safety significance
, and because the issue was entered into your Corrective Action Program, the NRC is treating the issue as a Non-Cited Violation (NCV) in accordance with Section 2.3.2 of the NRC Enforcement Policy.
 
If you contest the subject or severity of the N CV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555
-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001; and the NRC Resident Inspector at the Palisades Nuclear Plant
. In addition, if you disagree with the cross
-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Palisades Nuclear Plant
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA Jasmine Gilliam Acting for/
Sincerely,/RA Jasmine Gilliam Acting for/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-255 License No. DPR-20  
 
Robert C. Daley, Chie f Engineering Branch 3 Division of Reactor Safety Docket No. 50
-255 License No. DPR
-20  


===Enclosure:===
===Enclosure:===
Inspection Report 05000255/2015008  
Inspection Report 05000 255/2015008  


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl: Distribution via LISTSERV Enclosure U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-255 License No: DPR-20 Report No: 05000255/2015008 Licensee: Entergy Nuclear Operations, Inc. Location: Covert, MI Dates: March 18 - April 16, 2015 Inspectors: A. Dahbur, Senior Reactor Inspector D. Szwarc, Senior Reactor Inspector (Lead) R. Winter, Reactor Inspector Accompanying D. Passehl, Senior Reactor Analyst Personnel: Approved by: Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety 2  
Supplemental Information cc w/encl: Distribution via LISTSERV
 
Enclosure U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket No
: 50-255 License No
: DPR-20 Report No:
05000255/2015008 Licensee:
Entergy Nuclear Operations, Inc.
 
Location:
Covert, MI Dates: March 18  
- April 16, 2015 Inspectors:
A. Dahbur, Senior Reactor Inspector D. Szwarc, Senior Reactor Inspector (Lead)
R. Winter, Reactor Inspector Accompanying D. Passehl, Senior Reactor Analyst Personnel
: Approved by:
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety 2  


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
Inspection Report 05000255/2015008; 03/18/2015-04/16/2015; Palisades Nuclear Plant; Routine Triennial Fire Protection Baseline Inspection. This report covers an announced triennial fire protection baseline inspection. The inspection was conducted by Region III inspectors. One finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of U.S Nuclear Regulatory Commission (NRC) regulations. The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process (SDP)."  Cross-cutting aspects were determined using IMC 0310, "Aspects Within the Cross-Cutting Areas."  Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated July 9, 2013. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5, dated February 2014.
Inspection  
 
Report 05000255/2015008; 03/18/2015
-04/16/2015
; Palisades Nuclear Plant
; Routine Triennial Fire Protection Baseline Inspection.
 
This report covers an announced triennial fire protection baseline inspection. The inspection was conducted by Region III inspectors. One finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of U.S Nuclear Regulatory Commission (NRC) regulations. The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process (SDP).
 
"  Cross-cutting aspects were determined using IMC 0310, "Aspects Within the Cross-Cutting Areas."  Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review.
 
All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated July 9, 2013. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG
-1649, "Reactor Oversight Process," Revision 5
, dated February 2014
.  


===NRC-Identified===
===NRC-Identified===
and Self-Revealed Findings  
and Self-Revealed Findings


===Cornerstone: Mitigating Systems===
===Cornerstone: Mitigating Systems===
: '''Green.'''
: '''Green.'''
The inspectors identified a finding of very-low safety significance, and an associated NCV of Title 10, Code of Federal Regulations (CFR) 50.48(c), and National Fire Protection Association Standard 805, Section 2.4.3.3 for the licensee's failure to correctly model the as-built plant in the Fire Probabilistic Risk Assessment (PRA). Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels. The licensee entered this issue into their Corrective Action Program, and already had compensatory measures in place in the cable spreading room, including hourly fire tours and a standing order for an immediate call out for the fire brigade for a fire alarm in the room. The inspectors determined that the performance deficiency was more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern. Specifically, the licensee's failure to correctly model/analyze the as-built condition of the suppression system located in the cable spreading room in the PRA could potentially affect the risk associated with a fire in the room, and could result in inappropriately screening out the effects of other changes associated with the fire area. Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees' PRAs. The Senior Reactor Analyst concluded that the finding was of very-low safety significance (Green) because while there may be a change to the plant's baseline risk as a result of this issue, there is no delta plant risk due to a deficiency in the licensee's PRA model/analysis. This finding has a cross-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups.  (Section 1R05.3b) [H.4]
The inspectors identified a finding of very-low safety significance
, and an associated NCV of Title 10, Code of Federal Regulations (CFR) 50.48(c), and National Fire Protection Association Standard 805, Section 2.4.3.3 for the licensee's failure to correctly model the as-built plant in the Fire Probabilistic Risk Assessment (PRA).
 
Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels. The licensee entered this issue into their Corrective Action Program
, and already had compensatory measures in place in the cable spreading room, including hourly fire tours and a standing order for an immediate call out for the fire brigade for a fire alarm in the room.
 
The inspectors determined that the performance deficiency was more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern. Specifically, the licensee's failure to correctly model/analyze the as-built condition of the suppression system located in the cable spreading room in the PRA could potentially affect the risk associated with a fire in the room
, and could result in inappropriately screening out the effects of other changes associated with the fire area.
 
Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees
' PRAs. The Senior Reactor Analyst concluded that the finding was of very-low safety significance (Green) because while there may be a change to the plant's baseline risk as a result of this issue, there is no delta plant risk due to a deficiency in the licensee's PRA model/analysis. This finding has a cross-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups.
 
  (Section 1R05.3b) [H.4]
3
3


Line 51: Line 111:


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones:  Initiating Events and Mitigating Systems
Cornerstone s:  Initiating Events and Mitigating Systems
 
{{a|1R05}}
{{a|1R05}}
==1R05 Fire Protection==
==1R05 Fire Protection==
{{IP sample|IP=IP 71111.05XT}}
The inspectors conducted the inspection in accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP) 71111.05XT, "Fire Protection - National Fire Protection Association (NFPA) 805 (Triennial)," issued January 31, 2013. The inspectors reviewed the licensee's Fire Protection Program against the requirements of NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition," as incorporated by Title 10, Code of Federal Regulation (CFR) Part 50.48(c). The NFPA 805 standard establishes a comprehensive set of requirements for Fire Protection Programs at nuclear power plants. The standard incorporates both deterministic and risk-informed performance-based concepts. The deterministic aspects of the standard are comparable to traditional requirements.


The inspectors conducted a design-based, plant-specific, risk-informed, onsite inspection of the licensee's Fire Protection Program's defense-in-depth elements used to mitigate the consequences of a fire. The inspectors reviewed the licensee's Fire Protection Program to ensure that it met the fire protection concept of defense-in-depth for plant areas important to safety by: preventing fires from starting; rapidly detecting, controlling and extinguishing fires that do occur; providing protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by fire suppression activities will not prevent the safe-shutdown of the reactor plant; and taking reasonable actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. The inspectors evaluated the licensee's Fire Protection Program by focusing on the design, installation, operational status, testing, and material condition of the Fire Protection Program, post-fire safe shutdown (SSD) systems, and B.5.b mitigating strategies. The inspectors verified that the licensee's program is sufficiently implemented and maintained to satisfy that nuclear safety and radioactive release goals, objectives, and performance criteria for all operational modes and plant configurations. In addition, the inspectors' review and assessment focused on the licensee's post-fire SSD systems for selected risk-significant fire areas. Inspector emphasis was placed on determining that the post-fire SSD capability and the fire protection features were maintained free of fire damage to ensure that at least one post-fire SSD success path was available. The inspectors' review and assessment also focused on the licensee's B.5.b related license conditions, and the requirements of 10 CFR 50.54 (hh)(2). The inspectors' emphasis was to ensure that the licensee could maintain or restore core cooling, containment, and spent fuel pool cooling capabilities utilizing the B.5.b 4 mitigating strategies following a loss of large areas of power reactor facilities due to explosions or fires. Documents reviewed are listed in the Attachment to this report. The fire areas and B.5.b mitigating strategies selected for review during this inspection are listed below and in Section 1R05.15. The fire areas selected constituted three inspection samples and the B.5.b mitigating strategies selected constituted two inspection samples, respectively, as defined in IP 71111.05XT. Fire Area Description 2 Cable Spreading Room 9 Intake Structure 13A Auxiliary Building 590' Corridor
(71111.05 XT) The inspectors conducted the inspection in accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP)71111.05XT, "Fire Protection
- National Fire Protection Association (NFPA) 805 (Triennial)," issued January 31, 2013. The inspectors reviewed the licensee's Fire Protection Program against the requirements of NFPA 805, "Performance
-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition," as incorporated by Title 10, Code of Federal Regulation (CFR) Part 50.48(c). The NFPA 805 standard establishes a comprehensive set of requirements for Fire Protection Programs at nuclear power plants. The standard incorporates both deterministic and risk
-informed performance
-based concepts. The deterministic aspects of the standard are comparable to traditional requirements.
 
The inspectors conducted a design
-based, plant
-specific, risk
-informed, onsite inspection of the licensee's Fire Protection Program's defense
-in-depth elements used to mitigate the consequences of a fire. The inspectors reviewed the licensee's Fire Protection Program to ensure that it met the fire protection concept of defense
-in-depth for plant areas important to safety by:
preventing fires from starting; rapidly detecting, controlling and extinguishing fires that do occur; providing protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by fire suppression activities will not prevent the safe
-shutdown of the reactor plant; and taking reasonable actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires.
 
The inspectors evaluated the licensee's Fire Protection Program by focusing on the design, installation, operational status, testing, and material condition of the Fire Protection Program, post
-fire safe shutdown (
SSD) systems, and B.5.b mitigating strategies. The inspectors verified that the licensee's program is sufficiently implemented and maintained to satisfy that nuclear safety and radioactive release goals, objectives, and performance criteria for all operational modes and plant configurations.
 
In addition, the inspectors' review and assessment focused on the licensee's post
-fire SSD systems for selected risk
-significant fire areas. Inspector emphasis was placed on determining that the post
-fire SSD capability and the fire protection features were maintained free of fire damage to ensure that at least one post
-fire SSD success path was available.
 
The inspectors' review and assessment also focused on the licensee's B.5.b related license conditions, and the requirements of 10 CFR 50.54 (hh)(2). The inspectors' emphasis was to ensure that the licensee could maintain or restore core cooling, containment, and spent fuel pool cooling capabilities utilizing the B.5.b 4 mitigating strategies following a loss of large areas of power reactor facilities due to explosions or fires. Documents reviewed are listed in the Attachment to this report.
 
The fire areas and B.5.b mitigating strategies selected for review during this inspection are listed below and in Section 1R05.15. The fire areas selected constituted three inspection samples and the B.5.b mitigating strategies selected constituted two inspection samples, respectively, as defined in IP 71111.05XT. Fire Area Description 2 Cable Spreading Room 9 Intake Structure 13A Auxiliary Building 590' Corridor


===.1 Protection of Safe Shutdown Capabilities===
===.1 Protection of Safe Shutdown Capabilities===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensee's fire response abnormal operating procedures (AOPs) to verify that the shutdown methodology properly identified the components and systems necessary to achieve and maintain safe and stable plant conditions. The inspectors performed a walk-through of portions of the shutdown from outside of the control room AOP-41, "Alternate SSD Procedure," Revision 1, to ensure that operators could reasonably perform the actions specified in the procedure.
The inspectors reviewed the licensee's fire response abnormal operating procedures (AOPs) to verify that the shutdown methodology properly identified the components and systems necessary to achieve and maintain safe and stable plant conditions. The inspectors performed a walk
-through of portions of the shutdown from outside of the control room AOP
-41, "Alternate SSD Procedure," Revision 1, to ensure that operators could reasonably perform the actions specified in the procedure.


====b. Findings====
====b. Findings====
Line 80: Line 168:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors walked down and evaluated the adequacy of fire suppression and detection systems to determine that they were installed, tested, and maintained to adequately control and/or extinguish fires associated with the hazards of the selected fire areas. The inspectors observed the material condition, operational lineup, and design of the installed fire detection and suppression systems, including the electric motor driven, diesel motor driven, jockey fire pumps, carbon dioxide system, manual fire hose and standpipe systems, and fire extinguishers in the selected fire areas. The inspectors reviewed fire pre-plans and procedures for the selected fire areas to determine if appropriate information was provided to fire brigade members. In addition, the inspectors observed the placement of the fire hoses, fire extinguishers, fire hose nozzle types, and fire hose lengths to verify they were not blocked, and that adequate reach and coverage was provided consistent with the fire protection features and potential fire conditions described in the NFPA 805 fire safety analysis calculations.
The inspectors walked down and evaluated the adequacy of fire suppression and detection systems to determine that they were installed, tested, and maintained to adequately control and/or extinguish fires associated with the hazards of the selected fire areas. The inspectors observed the material condition, operational lineup, and design of the installed fire detection and suppression systems, including the electric motor driven, diesel motor driven, jockey fire pumps, carbon dioxide system, manual fire hose and standpipe systems, and fire extinguishers in the selected fire areas. The inspectors reviewed fire pre
-plans and procedures for the selected fire areas to determine if appropriate information was provided to fire brigade members. In addition, the inspectors observed the placement of the fire hoses, fire extinguishers, fire hose nozzle types, and fire hose lengths to verify they were not blocked, and that adequate reach and coverage was provided consistent with the fire protection features and potential fire conditions described in the NFPA 805 fire safety analysis calculations.


====b. Findings====
====b. Findings====
Line 86: Line 175:


=====Introduction:=====
=====Introduction:=====
The inspectors identified a finding of very-low safety significance (Green), an associated Non-Cited Violation (NCV) of 10 CFR 50.48(c), and NFPA 805, Section 2.4.3.3, for the licensee's failure to correctly model the as-built plant condition in the Fire Probabilistic Risk Assessment (PRA); also referred to as a probabilistic safety assessment (PSA) in NFPA 805. Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels.
The inspectors identified a finding of very
-low safety significance (Green), an associated Non
-Cited Violation (NCV) of 10 CFR 50.48(c), and NFPA 805, Section 2.4.3.3, for the licensee's failure to correctly model the as
-built plant condition in the Fire Probabilistic Risk Assessment (PRA); also referred to as a probabilistic safety assessment (PSA) in NFPA 805. Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels.


=====Description:=====
=====Description:=====
The cable spreading room (Fire Area 2) contained electrical cabinets and cables from both safety-related divisions. The electrical cabinets located in the room consisted of transformers, inverters, battery chargers, breakers, 480 volt load centers, motor control centers, and 125 volts direct current buses. The cabling was located primarily in cable trays suspended above the electrical cabinets that were generally stacked three to four trays high. The majority of cable trays were of the ladder type construction without a solid top or bottom and were filled to capacity with electrical cables. The cable trays were typically separated by six inches to a foot of vertical clearance between stacked trays. This overall tray arrangement was generally present throughout the room. The cable spreading room contained an automatic detection system and a wet pipe sprinkler system for automatic suppression. During the walk down in the area the inspectors noted that, due to density of cable trays, it was not possible to see the ceiling from standing on the floor in all but a few areas of the room. The inspectors also noted that all sprinkler heads were mounted near the ceiling with no sprinkler heads in the vertical clearances between cable trays and no sprinkler heads below 6 the cable trays. The inspectors were concerned that the sprinkler system would only be effective for extinguishing a fire in the upper cable trays. The licensee installed the wet pipe sprinkler system in the cable spreading room in compliance with NFPA 13-1968, "Standard for Installation of Sprinkler Systems."  Section 4316, "Obstructions" of NFPA 13-1968 stated, in part, that, "timbers, uprights, hangers, piping, light fixtures, ducts, etc., are likely to interfere with proper distribution of water from sprinklers. Therefore, sprinklers should be so located or spaced that any interference is held to a minimum."  The licensee's Engineering Report PLP-RPT-12-00053, "NFPA Code Compliance Review," Revision 0 indicated that there were no requirements to comply with Section 4316. The licensee indicated in their response to the inspectors that the "should" statement in the NFPA standard section was only a recommendation and did not impose any requirements. In 1995 during the Appendix R Enhancement Program, the licensee identified significant obstructions of the sprinklers in the cable spreading room by the stacked cable trays and completed an 86-10 type of evaluation EA-APR-95-033, and concluded that although there were no sprinklers located below the cable trays and the trays represented a significant obstructions to water discharge from the sprinklers located at the ceiling. The evaluation considered the configuration was acceptable since there were no significant in-situ combustibles located at the floor. The licensee's justification was based on that the hazard of concern in the room was the cables in cable trays. The in-situ combustible materials in the room consisted primarily of the large amount of cable installed in the cable trays near the ceiling. The combustibles associated with panels and load centers were completely enclosed in metal cabinets and therefore would not be expected to burn completely during a fire. The NRC approved the licensee's transition to NFPA 805 by the SER dated February 27, 2015. The licensees' current analysis for the Fire Protection Program for NFPA 805, calculation 0247-07-0005-06, "Palisades Nuclear Plant Fire PRA Fire," Revision 1, documented the scenario development process and the individual scenario details used in the Palisades fire PRA using elements from NUREG/CR-6850, "Fire PRA Methodology for Nuclear Power Facilities."  Section 9.6, "Cable Spreading Room," of calculation 0247-07-0005-06, indicated that due to the highly congested nature of the Palisades cable spreading room a modified approach to scenario development was required in order to model each scenario. The cable spreading room had a wet-pipe sprinkler system installed in a grid-like pattern. This system was credited to prevent fire propagation beyond an initial zone-of-influence for the ignition sources in the cable spreading room. Grid coordinates were assigned to all risk-relevant targets. These coordinates were used to determine the potential impacts of fire scenarios in the area. Utilizing the distance to nearby targets and the grid coordinates; scenarios in the cable spreading room were developed with three type treatments as described below: Type 1 - These scenarios represented a fire that was suppressed prior to damaging the first target beyond the ignition source. Manual suppression was credited for cabinets that were not well-sealed. For sealed cabinets, credit for suppression was not required as this was the only postulated fire scenario. Type 2 - These scenarios represented a fire that was not suppressed prior to damaging the first target. All targets within the grid coordinate(s) associated with 7 the ignition source are modeled as failed. These scenarios postulated successful suppression of the fire by the wet-pipe suppression system that prevents the fire damage from extending past a sprinkler head. Type 3 - These scenarios represented a fire that was not suppressed prior to damaging the first target and was further not suppressed by the wet-pipe sprinkler system. Propagation to the remaining grid coordinates in the room was postulated with the associated failures. Figure 10-1, "Scenario Suppression Event Tree," in calculation 0247-07-0005-06, also showed that the automatic suppression was credited to prevent the formation of a hot gas layer or fire propagation beyond the zone of influence. The inspectors were concerned that the licensee's Fire PRA analysis incorrectly postulated successful suppression of the type 2 fire scenarios by the wet-pipe sprinkler system to prevent fire propagation beyond the zone of influence below the cable trays. The Fire PRA analysis did not consider the significant obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing an adequate water density pattern to suppress a fire in areas below the cable trays which contain electrical panels. The licensee entered this issue into their Corrective Action Program (CAP) as CR-PLP-2015-01593. Since the licensee was currently in the transition period to full implementation of the NFPA 805 licensing and design basis, compensatory measure were already established for the cable spreading room for other non-compliances. Compensatory measures were in place as hourly fire tours and a standing order to immediately activate the fire brigade for fire alarms coming from the cable spreading room.
The cable spreading room (Fire Area 2) contained electrical cabinets and cables from both safety
-related divisions. The electrical cabinets located in the room consisted of transformers, inverters, battery chargers, breakers, 480 volt load centers, motor control centers, and 125 volts direct current buses.
 
The cabling was located primarily in cable trays suspended above the electrical cabinets that were generally stacked three to four trays high. The majority of cable trays were of the ladder type construction without a solid top or bottom and were filled to capacity with electrical cables. The cable trays were typically separated by six inches to a foot of vertical clearance between stacked trays. This overall tray arrangement was generally present throughout the room.
 
The cable spreading room contained an automatic detection system and a wet pipe sprinkler system for automatic suppression. During the walk down in the area the inspectors noted that, due to density of cable trays, it was not possible to see the ceiling from standing on the floor in all but a few areas of the room. The inspectors also noted that all sprinkler heads were mounted near the ceiling with no sprinkler heads in the vertical clearances between cable trays and no sprinkler heads below 6 the cable trays. The inspectors were concerned that the sprinkler system would only be effective for extinguishing a fire in the upper cable trays.
 
The licensee installed the wet pipe sprinkler system in the cable spreading room in compliance with NFPA 13
-1968, "Standard for Installation of Sprinkler Systems."  Section 4316
, "Obstructions" of NFPA 13
-1968 stated, in part, that, "timbers, uprights, hangers, piping, light fixtures, ducts, etc., are likely to interfere with proper distribution of water from sprinklers. Therefore, sprinklers should be so located or spaced that any interference is held to a minimum."  The licensee's Engineering Report PLP
-RPT-12-00053, "NFPA Code Compliance Review," Revision 0 indicated that there were no requirements to comply with Section 4316. The licensee indicated in their response to the inspectors that the "should" statement in the NFPA standard section was only a recommendation and did not impose any requirements.
 
In 1995 during the Appendix R Enhancement Program, the licensee identified significant obstructions of the sprinklers in the cable spreading room by the stacked cable trays and completed an 86
-10 type of evaluation EA
-APR-95-033, and concluded that although there were no sprinklers located below the cable trays and the trays represented a significant obstructions to water discharge from the sprinklers located at the ceiling. The evaluation considered the configuration was acceptable since there were no significant in-situ combustibles located at the floor. The licensee's justification was based on that the hazard of concern in the room was the cables in cable trays. The in
-situ combustible materials in the room consisted primarily of the large amount of cable installed in the cable trays near the ceiling. The combustibles associated with panels and load centers were completely enclosed in metal cabinets and therefore would not be expected to burn completely during a fire.
 
The NRC approved the licensee's transition to NFPA 805 by the SER dated February 27, 2015. The licensees' current analysis for the Fire Protection Program for NFPA 805, calculation 0247 0005-06, "Palisades Nuclear Plant Fire P RA Fire," Revision 1
, documented the scenario development process and the individual scenario details used in the Palisades fire PRA using elements from NUREG/CR
-6850, "Fire PRA Methodology for Nuclear Power Facilities."  Section 9.6
, "Cable Spreading Room," of calculation 0247 0005-06, indicated that due to the highly congested nature of the Palisades cable spreading room a modified approach to scenario development was required in order to model each scenario. The cable spreading room had a wet
-pipe sprinkler system installed in a grid
-like pattern. This system was credited to prevent fire propagation beyond an initial zone
-of-influence for the ignition sources in the cable spreading room. Grid coordinates were assigned to all risk
-relevant targets. These coordinates were used to determine the potential impacts of fire scenarios in the area.
 
Utilizing the distance to nearby targets and the grid coordinates; scenarios in the cable spreading room were developed with three type treatments as described below:
Type 1 - These scenarios represented a fire that was suppressed prior to damaging the first target beyond the ignition source. Manual suppression was credited for cabinets that were not well
-sealed. For sealed cabinets, credit for suppression was not required as this was the only postulated fire scenario.
 
Type 2 - These scenarios represented a fire that was not suppressed prior to damaging the first target. All targets within the grid coordinate(s) associated with 7 the ignition source are modeled as failed. These scenarios postulated successful suppression of the fire by the wet
-pipe suppression system that prevents the fire damage from extending past a sprinkler head.
 
Type 3 - These scenarios represented a fire that was not suppressed prior to damaging the first target and was further not suppressed by the wet
-pipe sprinkler system. Propagation to the remaining grid coordinates in the room was postulated with the associated failures.
 
Figure 10
-1, "Scenario Suppression Event Tree," in calculation 0247 0005-06, also showed that the automatic suppression was credited to prevent the formation of a hot gas layer or fire propagation beyond the zone of influence. The inspectors were concerned that the licensee's Fire PRA analysis incorrectly postulated successful suppression of the type 2 fire scenarios by the wet
-pipe sprinkler system to prevent fire propagation beyond the zone of influence below the cable trays. The Fire PRA analysis did not consider the significant obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing an adequate water density pattern to suppress a fire in areas below the cable trays which contain electrical panels.
 
The licensee entered this issue into their Corrective Action Program (CAP) as CR-PLP-2015-01593. Since the licensee was currently in the transition period to full implementation of the NFPA 805 licensing and design basis, compensatory measure were already established for the cable spreading room for other non
-compliances. Compensatory measures were in place as hourly fire tours and a standing order to immediately activate the fire brigade for fire alarms coming from the cable spreading room.


=====Analysis:=====
=====Analysis:=====
The inspectors determined that the licensee's failure to correctly consider the plant as-built condition in the PRA model/analysis was contrary to NFPA 805, Section 2.4.3.3 and was a performance deficiency. Specifically, the licensee failed to consider the obstructions to the suppression system in the cable spreading room when crediting the suppression system in the PRA model/analysis. The performance deficiency was determined to be more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern. Specifically, the licensee's failure to correctly model/analyze the as-built condition of the suppression system located in the cable spreading room, in the fire PRA could potentially affect the risk associated with a fire in the room and could result in inappropriately screening out the effects of other changes associated with the fire area. The inspectors concluded this finding was associated with the Mitigating Systems cornerstone attribute of Protection Against External Factors (Fire), and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The Senior Reactor Analyst (SRA) evaluated the finding in accordance with Inspection Manual Chapter 0609, "Significance Determination Process (SDP)," dated April 29, 2015, and Appendix M, "SDP Using Qualitative Criteria," dated April 12, 2012. Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees' PRAs. The SRA 8 concluded that the finding was of very-low safety significance (Green). While there may be a change to the plant's baseline risk as a result of this issue, this is a fire modeling issue only; no physical plant fire protection feature was altered by the fire PRA model. Therefore, there was no increase in actual core damage risk to the physical plant.
The inspectors determined that the licensee's failure to correctly consider the plant as-built condition in the PRA model/analysis was contrary to NFPA 805, Section 2.4.3.3 and was a performance deficiency. Specifically, the licensee failed to consider the obstructions to the suppression system in the cable spreading room when crediting the suppression system in the PRA model/analysis.
 
The performance deficiency was determined to be more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern.
 
Specifically, the licensee's failure to correctly model/analyze the as
-built condition of the suppression system located in the cable spreading room
, in the fire PRA could potentially affect the risk associated with a fire in the room and could result in inappropriately screening out the effects of other changes associated with the fire area. The inspectors concluded this finding was associated with the Mitigating Systems cornerstone attribute of Protection Against External Factors (Fire)
, and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The Senior Reactor Analyst (SRA) evaluated the finding in accordance with Inspection Manual Chapter 0609, "Significance Determination Process (SDP)," dated April 29, 2015, and Appendix M, "S DP Using Qualitative Criteria," dated April 12, 2012. Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees' PRAs. The SRA 8 concluded that the finding was of very
-low safety significance (Green). While there may be a change to the plant's baseline risk as a result of this issue, this is a fire modeling issue only; no physical plant fire protection feature was altered by the fire PRA model. Therefore, there was no increase in actual core damage risk to the physical plant
.
 
The licensee's baseline fire PRA may change as Palisades has until August 27, 2015 to complete the procedure changes, process updates, and training items listed in License Amendment Request Attachment S, Table S
-3, "Implementation Items."  Palisades also has until the end of the second full operating cycle after issuance of the SER t o implement other modifications identified in Attachment S, Table S
-2, "Plant Modifications."


The licensee's baseline fire PRA may change as Palisades has until August 27, 2015 to complete the procedure changes, process updates, and training items listed in License Amendment Request Attachment S, Table S-3, "Implementation Items."  Palisades also has until the end of the second full operating cycle after issuance of the SER to implement other modifications identified in Attachment S, Table S-2, "Plant Modifications."  This finding has a cross-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups. Specifically, the fire protection group did not appropriately communicate to the PRA group that significant obstructions existed in the cable spreading room due to the stacked cable trays. As a result, the licensee did not consider the impact of the obstructions of the automatic suppression system in the PRA model.  [H.4]
This finding has a cross
-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups. Specifically, the fire protection group did not appropriately communicate to the PRA group that significant obstructions existed in the cable spreading room due to the stacked cable trays. As a result
, the licensee did not consider the impact of the obstructions of the automatic suppression system in the PRA model.  [H.4]


=====Enforcement:=====
=====Enforcement:=====
License condition 2.C(3) requires the licensee to implement and maintain in effect all provisions of the approved Fire Protection Program that complies with 10 CFR 50.48(a) and 10 CFR 50.48(c), "NFPA Standard NFPA 805," as approved in the SER dated February 27, 2015.
License condition 2.C(3) requires the licensee to implement and maintain in effect all provisions of the approved Fire Protection Program that complies with 10 CFR 50.48(a) and 10 CFR 50.48(c), "NFPA Standard NFPA 805," as approved in the SER dated February 27, 2015.


Section 2.4.3.3 of NFPA 805 states, in part, that the PSA (PRA) approach, methods, and data shall be based on the as-built and as-operated and maintained plant, and reflect the operating experience at the plant. Contrary to the above, from February 27, 2015, until April 16, 2015, the licensee failed to base the PSA (PRA) approach, methods, and data on the as-built and as-operated and maintained plant. Specifically, the licensee's PSA (PRA) model/analysis credited the suppression system located in the cable spreading room to suppress a type 2 fire scenarios, whereas the actual room contained numerous obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing adequate water density pattern to suppress a fire in areas below the cable trays which contained electrical panels. This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy, because it was of very-low safety significance (Green), and was entered into the licensee's CAP as CR-PLP-2015-01593. The licensee currently has compensatory measures established in the cable spreading room including hourly fire tours, and a standing order for an immediate call out for the fire brigade for a fire alarm in the room.  (NCV 05000255/2015008-01; Failure to Correctly Assess the Suppression System in the Cable Spreading Room in the PRA for NFPA 805).
Section 2.4.3.3 of NFPA 805 states
, in part, that the PSA (PRA) approach, methods, and data shall be based on the as
-built and as
-operated and maintained plant, and reflect the operating experience at the plant.
 
Contrary to the above, from February 27, 2015
, until April 16, 2015
, the licensee failed to base the PSA (PRA) approach, methods, and data on the as
-built and as
-operated and maintained plant. Specifically, the licensee's PSA (PRA) model/analysis credited the suppression system located in the cable spreading room to suppress a type 2 fire scenarios, whereas the actual room contained numerous obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing adequate water density pattern to suppress a fire in areas below the cable trays which contained electrical panels. This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy, because it was of very
-low safety significance (Green), and was entered into the licensee's CAP as CR-PLP-2015-01593. The licensee currently has compensatory measures established in the cable spreading room including hourly fire tours, and a standing order for an immediate call out for the fire brigade for a fire alarm in the room.  (NCV 05000255/2015008
-01; Failure to Correctly Assess the Suppressio n System in the Cable Spreading Room in the PRA for NFPA 805).


===.4 Protection from Damage from Fire Suppression Activities===
===.4 Protection from Damage from Fire Suppression Activities===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors evaluated that one success path to achieve and maintain the Nuclear Safety Performance Criteria could be achieved, and would not be adversely affected due to damage from fire suppression activities or from the rupture or inadvertent operation of manual fire suppression systems. The inspectors walked down the selected fire areas to 9 assess in-plant conditions including adequacy and material condition of equipment spray protection, elevations of vulnerable equipment and checked that water would either be contained in the fire affected area, or be safely drained off through floor drains or to other areas. The inspectors addressed the possibility that a fire in one fire area could lead to the migration of smoke or hot gases to other plant areas.
The inspectors evaluated that one success path to achieve and maintain the Nuclear Safety Performance Criteria could be achieved, and would not be adversely affected due to damage from fire suppression activities or from the rupture or inadvertent operation of manual fire suppression systems. The inspectors walked down the selected fire areas to 9 assess in
-plant conditions including adequacy and material condition of equipment spray protection, elevations of vulnerable equipment and checked that water would either be contained in the fire affected area, or be safely drained off through floor drains or to other areas. The inspectors addressed the possibility that a fire in one fire area could lead to the migration of smoke or hot gases to other plant areas.


====b. Findings====
====b. Findings====
Line 112: Line 273:


====a. Inspection Scope====
====a. Inspection Scope====
The licensee was in the process of transitioning their Fire Protection Program to comply with 10 CFR 50.48(c), "National Fire Protection Association Standard NFPA 805."  As a result the licensee was revising their AOPs. The inspectors' reviews focused on ensuring that the required functions for post-fire SSD, and the corresponding equipment necessary to perform those functions were included in the fire response AOPs. The review included assessing whether safe and stable plant conditions from the primary control stations outside the main control room could be implemented and that transfer of control from the main control room to the remote shutdown panel could be accomplished in accordance with procedure AOP-41, "Alternate SSD Procedure," Revision 1. The inspectors walked down the actions identified in the procedure with the licensee to verify operators were properly trained, assess human factors, and ensure the procedures could be completed as written.
The licensee was in the process of transitioning their Fire Protection Program to comply with 10 CFR 50.48(c), "National Fire Protection Association Standard NFPA 805."  As a result the licensee was revising their AOPs. The inspectors' reviews focused on ensuring that the required functions for post
-fire SSD, and the corresponding equipment necessary to perform those functions were included in the fire response AOPs. The review included assessing whether safe and stable plant conditions from the primary control stations outside the main control room could be implemented and that transfer of control from the main control room to the remote shutdown panel could b e accomplished in accordance with procedure AOP-41, "Alternate S SD Procedure,
" Revision 1. The inspectors walked down the actions identified in the procedure with the licensee to verify operators were properly trained, assess human factors, and ensure the procedures could be completed as written.


====b. Findings====
====b. Findings====
Line 120: Line 283:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors verified that the licensee performed a Nuclear Safety Capability Assessment (NSCA) for the selected fire areas, and that the assessment identified the structures, systems, and components important for achieving safe and stable conditions. For each fire area, the inspectors reviewed the electrical schematics, flow diagrams, and the NSCA to identify any potential fire-induced cable damage that could directly affect post-fire SSD. The inspectors reviewed a sample of circuit diagrams to verify that all appropriate cables had been selected and incorporated into the NSCA. The inspectors then evaluated selected circuits to ensure all fire scenarios had been identified, and dispositioned for all modes of operation including shut down operations, and abnormal plant configurations. The inspectors verified that the NSCA demonstrated that hot shorts, shorts to ground, or other failures that would result in a spurious actuation will not affect the capability to meet the performance criteria. The inspectors verified that the licensee's assessment identified circuits that may impact the Nuclear Safety Performance Criteria. The assessment demonstrated that hot shorts, shorts to ground or other failures that would not result in a spurious actuation will not affect the capability to meet the performance 10 criteria. The inspectors reviewed fire scenarios and cable attributes, potential undesirable consequences, and common power supply/bus concerns.
The inspectors verified that the licensee performed a Nuclear Safety Capability Assessmen t (NSCA) for the selected fire areas, and that the assessment identified the structures, systems, and components important for achieving safe and stable conditions. For each fire area, the inspectors reviewed the electrical schematics, flow diagrams, and the NSCA to identify any potential fire
-induced cable damage that could directly affect post-fire SSD. The inspectors reviewed a sample of circuit diagrams to verify that all appropriate cables had been selected and incorporated into the NSCA. The inspectors then evaluated selected circuits to ensure all fire scenarios had been identified, and dispositioned for all modes of operation including shut down operations, and abnormal plant configurations.


The inspectors also reviewed the licensee's response to multiple spurious operations (MSOs) as identified by Nuclear Energy Institute's (NEI's) document, NEI 00 01, and the site's Expert Panel. The review ensured that the licensee followed the approved guidance provided by NEI 00-01, evaluated all appropriate MSO scenarios, and properly addressed any discrepancies.
The inspectors verified that the NSCA demonstrated that hot shorts, shorts to ground, or other failures that would result in a spurious actuation will not affect the capability to meet the performance criteria. The inspectors verified that the licensee's assessment identified circuits that may impact the Nuclear Safety Performance Criteria. The assessment demonstrated that hot shorts, shorts to ground or other failures that would not result in a spurious actuation will not affect the capability to meet the performance 10 criteria.
 
The inspectors reviewed fire scenarios and cable attributes, potential undesirable consequences, and common power supply/bus concerns.
 
The inspectors also reviewed the licensee's response to multiple spurious operations (MSOs) as identified by Nuclear Energy Institute's (NEI's) document, NEI 00 01, and the site's Expert Panel. The review ensured that the licensee followed the approved guidance provided by NEI 00
-01, evaluated all appropriate MSO scenarios, and properly addressed any discrepancies.


====b. Findings====
====b. Findings====
Line 156: Line 325:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors conducted a review to verify that compensatory measures were in place for out of service, degraded, or inoperable fire protection, and post-fire SSD equipment, systems, or features (e.g., detection and suppression systems, and equipment, passive fire barriers, pumps, valves or electrical devices providing SSD functions or capabilities). The inspectors also conducted a review of the adequacy of short term compensatory measures to compensate for a degraded function or feature until appropriate corrective actions were taken.
The inspectors conducted a review to verify that compensatory measures were in place for out of service, degraded, or inoperable fire protection, and post
-fire SSD equipment, systems, or features (e.g., detection and suppression systems, and equipment, passive fire barriers, pumps, valves or electrical devices providing SSD functions or capabilities). The inspectors also conducted a review of the adequacy of short term compensatory measures to compensate for a degraded function or feature until appropriate corrective actions were taken.


====b. Findings====
====b. Findings====
Line 164: Line 334:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors verified that the licensee had provided reasonable assurance that a fire would not result in a radiological release that adversely affects the public, plant personnel, or the environment in accordance with NFPA 805, Section 1.3.2. The inspectors verified that the licensee had evaluated the potential for radioactive releases to any unrestricted areas resulting from fire suppression activities were as-low-as-reasonably-achievable. The inspectors verified that the licensee had analyzed radioactive release on a fire area basis in accordance with NFPA 805, Section 2.2.4. The inspectors walked down the selected fire zones, and verified that the pre-fire plan tactics and instructions were consistent with the potential radiological conditions identified in the fire hazards analysis.
The inspectors verified that the licensee had provided reasonable assurance that a fire would not result in a radiological release that adversely affects the public, plant personnel, or the environment in accordance with NFPA 805, Section 1.3.2. The inspectors verified that the licensee had evaluated the potential for radioactive releases to any unrestricted areas resulting from fire suppression activities were as
-low-as-reasonably
-achievable. The inspectors verified that the licensee had analyzed radioactive release on a fire area basis in accordance with NFPA 805, Section 2.2.4. The inspectors walked down the selected fire zones, and verified that the pre
-fire plan tactics and instructions were consistent with the potential radiological conditions identified in the fire hazards analysis.


====b. Findings====
====b. Findings====
Line 172: Line 345:


====a. Inspection Scope====
====a. Inspection Scope====
The plant did not enter an outage during the inspection. However, the inspectors verified that the licensee had defined specific pinch points where one or more key safety functions could be lost during non-power operations.
The plant did not enter an outage during the inspection.
 
However, the inspectors verified that the licensee had defined specific pinch points where one or more key safety functions could be lost during non
-power operations.


====b. Findings====
====b. Findings====
Line 182: Line 358:


====a. Inspection Scope====
====a. Inspection Scope====
The inspection occurred during the licensee's 6-month implementation window for certain items listed in Table S-3, "Implementation Items," of Entergy Nuclear Operations, Inc. letter PNP 2014-097, dated November 4, 2014. The NRC approved a 6-month implementation window for items listed in that table in the SER dated February 27, 2015. During the inspection the licensee was in the process of developing and implementing the NFPA 805 monitoring program per NFPA 805 Section 2.6. The inspectors did not review the licensee's Monitoring Program because it was not complete.
The inspection occurred during the licensee's 6-month implementation window for certain items listed in Table S
-3, "Implementation Items," of Entergy Nuclear Operations, Inc. letter PNP 2014
-097, dated November 4, 2014. The NRC approved a 6
-month implementation window for items listed in that table in the S ER dated February 27, 2015. During the inspection the licensee was in the process of developing and implementing the NFPA 805 monitoring program per NFPA 805 Section 2.6. The inspectors did not review the licensee's Monitoring Program because it was not complete.


====b. Findings====
====b. Findings====
Line 190: Line 369:


====a. Inspection Scope====
====a. Inspection Scope====
The licensee had not completed any plant change evaluations during the time between issuance of the NFPA 805 license amendment on February 27, 2015, and the end of the inspection.
The licensee had not completed any plant change evaluations during the time between issuance of the NFPA 805 license amendment on February 27, 2015
, and the end of the inspection
.


====b. Findings====
====b. Findings====
Line 198: Line 379:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensee's preparedness to handle large fires or explosions by reviewing selected mitigating strategies. This review ensured that the licensee continued to meet the requirements of their B.5.b related license conditions and 10 CFR 50.54(hh)(2) by determining that: Procedures were being maintained and adequate; Equipment was properly staged, maintained, and tested; Station personnel were knowledgeable and could implement the procedures; and Additionally, inspectors reviewed the storage, maintenance, and testing of B.5.b related equipment. The inspectors reviewed the licensee's B.5.b related license conditions and evaluated selected mitigating strategies to ensure they remain feasible in light of operator training, maintenance/testing of necessary equipment and any plant modifications. In addition, the inspectors reviewed previous inspection reports for commitments made by the licensee to correct deficiencies identified during performance of Temporary Instruction 2515/171 or subsequent performances of these inspections.
The inspectors reviewed the licensee's preparedness to handle large fires or explosions by reviewing selected mitigating strategies. This review ensured that the licensee continued to meet the requirements of their B.5.b related license conditions and 10 CFR 50.54(hh)(2) by determining that:
Procedures were being maintained and adequate; Equipment was properly staged, maintained, and tested; Station personnel were knowledgeable and could implement the procedures; and Additionally, inspectors reviewed the storage, maintenance, and testing of B.5.b related equipment.
 
The inspectors reviewed the licensee's B.5.b related license conditions and evaluated selected mitigating strategies to ensure they remain feasible in light of operator training, maintenance/testing of necessary equipment and any plant modifications.
 
In addition, the inspectors reviewed previous inspection reports for commitments made by the licensee to correct deficiencies identified during performance of Temporary Instruction 2515/171 or subsequent performances of these inspections.
 
13 The B.5.b mitigating strategies selected for review during this inspection are listed below. The offsite and onsite communications, notifications/emergency response organization activation, initial operational response actions and damage assessment activities identified in Table A.3 1 of NEI 06
-12, "B.5.b Phase II and III Submittal Guidance," Revision 2
, are evaluated each time due to the mitigation strategies' scenario selected.


13 The B.5.b mitigating strategies selected for review during this inspection are listed below. The offsite and onsite communications, notifications/emergency response organization activation, initial operational response actions and damage assessment activities identified in Table A.3 1 of NEI 06-12, "B.5.b Phase II and III Submittal Guidance," Revision 2, are evaluated each time due to the mitigation strategies' scenario selected. NEI 06-12, Revision 2, Section Licensee Strategy (Table) 3.3.3 Manual Operation of Turbine Driven Auxiliary Feedwater Pump (A.4-3) 3.3.5 Makeup to the Condensate Storage Tank (A.4-5)
NEI 06-12, Revision 2, Section Licensee Strategy (Table)3.3.3 Manual Operation of Turbine Driven Auxiliary Feedwater Pump (A.4-3) 3.3.5 Makeup to the Condensate Storage Tank (A.4-5)


====b. Findings====
====b. Findings====
Line 207: Line 397:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Identification and Resolution of Problems==
==4OA2 Identification and Resolution==
{{IP sample|IP=IP 71152}}
 
of Problems (71152)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the licensee's CAP procedures and samples of corrective action documents to verify that the licensee was identifying issues related to the Fire Protection Program at an appropriate threshold and entering them in the CAP. The inspectors reviewed selected samples of condition reports, design packages, and fire protection system non-conformance documents.
The inspectors reviewed the licensee's CAP procedures and samples of corrective action documents to verify that the licensee was identifying issues related to the Fire Protection Program at an appropriate threshold and entering them in the CAP. The inspectors reviewed selected samples of condition reports, design packages, and fire protection system non
-conformance documents.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management Meetings==
==4OA6 Management Meetings==


===.1 Exit Meeting Summary On April 16, 2016, the inspectors presented the inspection results to Mr. P. Russell, and other members of the licensee staff.===
===.1 Exit Meeting Summary===
The licensee acknowledged the issues presented.


The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT:   
On April 16, 2016, the inspectors presented the inspection results to Mr. P. Russell, and other members of the licensee staff. The licensee acknowledged the issues presented.
 
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
 
ATTACHMENT:   


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
Licensee  
T Licensee  
: [[contact::B. Baker]], Operations Manager  
: [[contact::B. Baker]], Operations Manager
: [[contact::A. Bono]], Engineer  
: [[contact::A. Bono]], Engineer
: [[contact::J. Borah]], Systems and Components Engineering Manager  
: [[contact::J. Borah]], System
: [[contact::D. Campbell]], Fire Marshall  
s and Components Engineering Manager
: [[contact::B. Dotson]], Regulatory Assurance Specialist  
: [[contact::D. Campbell]], Fire Marshall
: [[contact::J. Hardy]], Regulatory Assurance Manager  
: [[contact::B. Dotson]], Regulatory Assurance Specialist
: [[contact::J. Kneeland]], Fire Protection Engineer  
: [[contact::J. Hardy]], Regulatory Assurance Manager
: [[contact::J. Milliken]], Code Programs Supervisor  
: [[contact::J. Kneeland]], Fire Protection Engineer
: [[contact::P. Russell]], Engineering Director  
: [[contact::J. Milliken]], Code Programs Supervisor
: [[contact::K. Simpson]], Fire Marshall  
: [[contact::P. Russell]], Engineering Director
: [[contact::T. Swiecicki]], Senior Lead Engineer  
: [[contact::K. Simpson]], Fire Marshall
: [[contact::A. Williams]], General Manager, Plant Operations  
: [[contact::T. Swiecicki]], Senior Lead Engineer
: [[contact::U.S. Nuclear Regulatory Commission B. Boston]], Acting Resident Inspector  
: [[contact::A. Williams]], General Manager, Plant Operations
: [[contact::R. Daley]], Branch Chief, EB3  
U.S. Nuclear Regulatory Commission
: [[contact::A. Garmoe]], Senior Resident Inspector  
: [[contact::B. Boston]], Acting Resident Inspector
: [[contact::J. Lennartz]], Acting Senior Resident Inspector  
: [[contact::R. Daley]], Branch Chief, EB3
: [[contact::A. Scarbeary]], Senior Resident Inspector  
: [[contact::A. Garmoe]], Senior Resident Inspector
==LIST OF ITEMS==
: [[contact::J. Lennartz]], Acting Senior Resident Inspector
OPENED, CLOSED AND DISCUSSED
: [[contact::A. Scarbeary]], Senior Resident Inspector
===Opened and Closed===
LIST OF ITEMS OPENED, CLOSED AND DISCUSS
: 05000255/2015008-01 NCV Failure to Correctly Assess the Suppression System in the Cable Spreading Room in the Probabilistic Risk Assessment for NFPA 805 (Section 1R05.3b)   
ED Opened and Closed
05000255/2015008
-01 NCV Failure to Correctly Assess the Suppression System in the Cable Spreading Room in
the Probabilistic Risk Assessment for NFPA 805 (Section 1R05.3b)
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during
the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of
a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
CALCULATIONS
Number Description or Title
Date or Revision
247-07-0005-04 Palisades Nuclear Plant Fire Probabilistic Risk Assessment Multiple Spurious Operations Report
EA-APR-95-008 10CFR50 Safe Shutdown Manual Actions Feasibility Analysis
EA-ELEC-EDSA-06 Palisades AC Power System EDSA Model
EA-FPP-03-001 Fire Loading Calculation
EA-FPP-05-002 Evaluation of Combustibles Between Service Water Pumps and Diesel Fire Pumps P
-41 02 EA-FPP-FRE-001 NFPA 805 Fire Risk Evaluations
CORRECTIVE ACTION PROGRAM DOCUMENTS ISSUED DURING INSPECTION
Number Description or Title
Date or Revision
CR-PLP-2015-01188 Information Not Included in the Fire Safety Analyses for Fire Areas 13 and 27 in DBD
-7.10 March 19, 2015
CR-PLP-2015-01190 Steam Generator Level Indicator Not Reading Correctly
March 19, 2015
CR-PLP-2015-01191 Fuses Located on Top of
De-Energized Breaker
March 19, 2015
CR-PLP-2015-01330 Wireless Camera On the East Wall of the Component Cooling Water Room
March 31, 2015
CR-PLP-2015-01376 Procedure AOP
-20 Had Incorrect Breaker Label
April 2, 2015
CR-PLP-2015-01378 Procedure Binders Located Next to Power Converter in Cable Spreading Room
April 2, 2015
CR-PLP-2015-01383 Evaluate Need for Additional Information in AOP-41 April 2, 2015
CR-PLP-2015-01524 Editorial Correction to Drawing E
-129 April 14, 2015
CR-PLP-2015-01579 Bundle of Signal Wire Visible in the Cable Tray Above Fire Door 168
April 16, 2015
CR-PLP-2015-01580 Paper Wedged Between Wall and EC
-121 H2 Recombiner M
-69B Power Cabinet in Cable Spreading Room
April 16, 2015
CR-PLP-2015-01583 Racking Tools for EB
-77 in the Old Baler Room are being Stored Laying on the Side of the Transformer
April 16, 2015
CR-PLP-2015-01585 Evaluation EA
-APR-98-002 Should Have been Required to be Transitioned to NFPA 805
April 16, 2015
CR-PLP-2015-01590 Issues with Hydrogen and Nitrogen Bottle
s April 16, 2015
CR-PLP-2015-01593 NRC Finding Related to Probabilistic Safety Assessment Approach Crediting Suppression
April 16, 2015
CR-PLP-2015-01595 Concern with Hydrogen Bottle in Room 233
April 16, 2015
 
CORRECTIVE ACTION PROGRAM DOCUMENTS REVIEWED
Number Description or Title
Date or Revision
CR-PLP-2004-08321 Potential Fire Induced Cable Damage May Spuriously Operate MOV
December 17, 2004
CR-PLP-2006-00687 Potential to Lose PCS Inventory in Fire Area 13
February 14, 2006
CR-PLP-2007-01947 Breaker Numbers Inconsistent Between Analyses and Procedure
May 9, 2007
CR-PLP-2007-02237 ONP-25.2 Contained Errors for a Significant Time
May 25, 2007
CR-PLP-2014-04935 Fire Door
-74 Not Latching Because Of Knob Mechanism Sticking
October 11, 2015
CR-PLP-2014-04941 Fire Door
-80 Has Excessive Signage
October 11, 2015
CR-PLP-2014-04961 Fire Door
-256 Procedure Needed To Be Revised To Provide Inspection Method For Watertight
Door  October 12, 2014  DRAWINGS Number Description or Title
Date or Revision
E-139 Sheet 1A
Schematic Diagram
- Diesel Generator Breaker
2-213 04 E-242 Sheet 1
Schematic Diagram
- Control Shutdown Cooling and Pressure Relief Motor Operated Valves 23 E-253 Sheet 1
Schematic Diagram
- Pressurizer Heater Transformer Feeder Breaker
M-207 Sheet 2
Piping & Instrument Diagram Auxiliary Feedwater System
M-216 Sheet 1
Piping & Instrument Diagram Fire Protection System 49 M-216 Sheet 4
Fire Protection EL. 570' & 590'
M-216 Sheet 6
Fire Protection EL. 607' & 611'
-0" 11 VEN-M66 Sheet 21
Fire protection Sprinkler System FA 9
VEN-M66 Sheet 6
Fire protection Sprinkler System FA 2
EVALUATIONS
Number Description or Title Date or Revision
PLP-RPT-12-00053 NFPA Code Conformance Review
PLP-RPT-12-00100 Fire Suppression Activities Effect on Nuclear Safety Performance Criteria
OTHER Number Description or Title
Date or Revision
--- B.5.b Phase 2 &3 Basis Document 0 09-4005.1 Nexus Report
- Radioactive Release Review for Palisades Nuclear Plant
September 20, 2012
EN-OP-112 Night & Standing Order Log
April 2, 2015
GEN-017 Palisades Alternate Resources
PROCEDURES
Number Description or Title
Date or Revision
AOP -6  Loss of Condenser Vacuum
AOP -7 Rapid Power Reduction
AOP-20 EDG 1-1 Malfunctions
AOP-41 Alternate Safe Shutdown Procedure
EN-DC-161 Control of Combustibles
EN-IS-109 Compressed Gas Cylinder Handling And Storage Combustibles
EN-TQ-125 Fire Brigade Drills
EOP Supplement 19
Alternate Auxiliary Feedwater Methods
EOP Supplement 31
Supply AFW Pumps From Alternate Sources
EOP-9.0 Functional Recovery Procedure
FPIP-4 Fire Protection Systems And Fire Protection Equipment
FP-PE-16 Fire Protection Check Sheet B.5.b Equipment
FP-PE-3 Auxiliary Building Fire Extinguisher Inspection
April 1, 2015
FPSP-RO-9  Fire Protection Surveillance
FPSP-RP-11   FPSP-RP-11  Fire Barrier Penetration
Surveillance
PFP # 13A
Pre-Fire Plan Main Corridor North
PFP # 13A
Pre-Fire Plan Main Corridor South
PFP # 2 Pre-Fire Plan Cable Spreading Room
PFP # 9 Pre-Fire Plan Screen House/Intake Structure
SOP-21 Fire Protection System
TRAINING DOCUMENTATION
Number Description or Title
Date or Revision
PL-N10044 SOER 98-02 Breaker Training
PLLP-NLO-ISBD Station Power Breakers
VENDOR DOCUMENTS
Number Description or Title
Date or Revision
Catalog Models DF
-3, Df-3A Pyrotronics
Ultraviolet Flame Detector
August 1985
Model DIS
-5B4 Pyr-A-Larm Ionization Detector
February 1977
WORK ORDERS
Number Description or Title
Date or Revision
2510622 01
FPSP-RP-11  Fire Barrier Penetration Insp
February 18, 2015
2526113 01
FPSP-ST-1  Fire Detector Sys Outside Cont Func Test
July 27, 2014
2572433 01
FPSP-SO-2  Safety Related Fire Door Inspection
October 22, 2014
 
LIST OF ACRONYMS USE
D  ADAMS Agencywide Document Access Management System
AOP Abnormal Operating Procedure
CAP Corrective Action Program
CFR Code of Federal Regulations
IMC Inspection Manual Chapter
IP Inspection Procedure
MSO Multiple Spurious Operations
NCV Non-Cited Violation
NEI Nuclear Energy Institute
NFPA National Fire Protection Association
NRC U.S. Nuclear Regulatory Commission
NSCA Nuclear Safety Capability Assessment
PARS Publicly Available Records
System PRA Probabilistic Risk Assessment
PSA Probabilistic Safety Assessment
SDP Significance Determination Process
SER Safety Evaluation Report
SRA Senior Reactor Analyst
SSD Safe Shutdown
 
A. Vitale
-2- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
  /RA Jasmine Gilliam Acting for/


==LIST OF DOCUMENTS REVIEWED==
Robert
The following is a list of documents reviewed during the inspection.
: [[contact::C. Daley]], Chie
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
f Engineering Branch 3
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. CALCULATIONS Number Description or Title Date or Revision 0247-07-0005-04 Palisades Nuclear Plant Fire Probabilistic Risk Assessment Multiple Spurious Operations Report 01
Division of Reactor Safety
: EA-APR-95-008 10CFR50 Safe Shutdown Manual Actions Feasibility Analysis 02
Docket No. 50
: EA-ELEC-EDSA-06 Palisades AC Power System EDSA Model 02
-255 License No. DPR
: EA-FPP-03-001 Fire Loading Calculation 03
-20 Enclosure:
: EA-FPP-05-002 Evaluation of Combustibles Between Service Water Pumps and Diesel Fire Pumps P-41 02
Inspection Report 05000255/2015008
: EA-FPP-FRE-001 NFPA 805 Fire Risk Evaluations 0
w/Attachment: Supplemental Information
: CORRECTIVE ACTION PROGRAM DOCUMENTS ISSUED DURING INSPECTION Number Description or Title Date or Revision
cc w/encl: Distribution via LISTSERV
: CR-PLP-2015-01188 Information Not Included in the Fire Safety Analyses for Fire Areas 13 and 27 in
DISTRIBUTION
: DBD-7.10 March 19, 2015
: Kimyata MorganButler
: CR-PLP-2015-01190 Steam Generator Level Indicator Not Reading Correctly March 19, 2015
RidsNrrPMPalisades Resource
: CR-PLP-2015-01191 Fuses Located on Top of De-Energized Breaker March 19, 2015
RidsNrrDorlLpl3
: CR-PLP-2015-01330 Wireless Camera On the East Wall of the Component Cooling Water Room March 31, 2015
-1 Resource
: CR-PLP-2015-01376 Procedure
RidsNrrDirsIrib Resource
: AOP-20 Had Incorrect Breaker Label April 2, 2015
Cynthia Pederson
: CR-PLP-2015-01378 Procedure Binders Located Next to Power Converter in Cable Spreading Room April 2, 2015
Darrell Roberts
: CR-PLP-2015-01383 Evaluate Need for Additional Information in
Richard Skokowski
: AOP-41 April 2, 2015
Allan Barker
: CR-PLP-2015-01524 Editorial Correction to Drawing E-129 April 14, 2015
Carole Ariano
: CR-PLP-2015-01579 Bundle of Signal Wire Visible in the Cable Tray Above Fire Door 168 April 16, 2015
Linda Linn
: CR-PLP-2015-01580 Paper Wedged Between Wall and
DRPIII DRSIII Jim Clay Carmen Olteanu
: EC-121 H2 Recombiner M-69B Power Cabinet in Cable Spreading Room April 16, 2015
ROPreports.Resource@nrc.gov
: CR-PLP-2015-01583 Racking Tools for
ADAMS Accession Number ML15138A138
: EB-77 in the Old Baler Room are being Stored Laying on the Side of the Transformer April 16, 2015
Publicly Available
: CR-PLP-2015-01585 Evaluation
Non-Publicly Available
: EA-APR-98-002 Should Have been Required to be Transitioned to NFPA 805 April 16, 2015
Sensitive
: CR-PLP-2015-01590 Issues with Hydrogen and Nitrogen Bottles April 16, 2015
Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
: CR-PLP-2015-01593 NRC Finding Related to Probabilistic Safety Assessment Approach Crediting Suppression April 16, 2015
OFFICE RIII  RIII  RIII  RIII NAME DSzwarc: cl
: CR-PLP-2015-01595 Concern with Hydrogen Bottle in Room 233 April 16, 2015 
JGilliam for RDaley   DATE 05/14/15 05/15/15  OFFICIAL RECORD COPY
: CORRECTIVE ACTION PROGRAM DOCUMENTS REVIEWED Number Description or Title Date or Revision
: CR-PLP-2004-08321 Potential Fire Induced Cable Damage May Spuriously Operate MOV December 17, 2004
: CR-PLP-2006-00687 Potential to Lose PCS Inventory in Fire Area 13 February 14, 2006
: CR-PLP-2007-01947 Breaker Numbers Inconsistent Between Analyses and Procedure May 9, 2007
: CR-PLP-2007-02237
: ONP-25.2 Contained Errors for a Significant Time May 25, 2007
: CR-PLP-2014-04935 Fire Door-74 Not Latching Because Of Knob Mechanism Sticking October 11, 2015
: CR-PLP-2014-04941 Fire Door-80 Has Excessive Signage October 11, 2015
: CR-PLP-2014-04961 Fire Door-256 Procedure Needed To Be Revised To Provide Inspection Method For Watertight Door
: October 12, 2014
: DRAWINGS Number Description or Title Date or Revision E-139 Sheet 1A Schematic Diagram - Diesel Generator Breaker 152-213 04 E-242 Sheet 1 Schematic Diagram - Control Shutdown Cooling and Pressure Relief Motor Operated Valves 23 E-253 Sheet 1 Schematic Diagram - Pressurizer Heater Transformer Feeder Breaker 21 M-207 Sheet 2 Piping & Instrument Diagram Auxiliary Feedwater System 39 M-216 Sheet 1 Piping & Instrument Diagram Fire Protection System 49 M-216 Sheet 4 Fire Protection EL. 570' & 590' 11 M-216 Sheet 6 Fire Protection EL. 607' & 611'-0" 11
: VEN-M66 Sheet 21 Fire protection Sprinkler System FA 9 05
: VEN-M66 Sheet 6 Fire protection Sprinkler System FA 2 04
: EVALUATIONS Number Description or Title Date or Revision
: PLP-RPT-12-00053 NFPA Code Conformance Review 0
: PLP-RPT-12-00100 Fire Suppression Activities Effect on Nuclear Safety Performance Criteria 01
: OTHER Number Description or Title Date or Revision --- B.5.b Phase 2 &3 Basis Document 0 09-4005.1 Nexus Report - Radioactive Release Review for Palisades Nuclear Plant September 20, 2012
: EN-OP-112 Night & Standing Order Log April 2, 2015
: GEN-017 Palisades Alternate Resources 19 
: PROCEDURES Number Description or Title Date or Revision AOP -6
: Loss of Condenser Vacuum 01 AOP -7 Rapid Power Reduction 01
: AOP-20 EDG 1-1 Malfunctions 01
: AOP-41 Alternate Safe Shutdown Procedure 01
: EN-DC-161 Control of Combustibles 11
: EN-IS-109 Compressed Gas Cylinder Handling And Storage Combustibles 07
: EN-TQ-125 Fire Brigade Drills 02 EOP Supplement 19 Alternate Auxiliary Feedwater Methods 11 EOP Supplement 31 Supply AFW Pumps From Alternate Sources 08
: EOP-9.0 Functional Recovery Procedure 22
: FPIP-4 Fire Protection Systems And Fire Protection Equipment 33
: FP-PE-16 Fire Protection Check Sheet B.5.b Equipment 02
: FP-PE-3 Auxiliary Building Fire Extinguisher Inspection April 1, 2015
: FPSP-RO-9
: Fire Protection Surveillance 06
: FPSP-RP-11
: FPSP-RP-11
: Fire Barrier Penetration Surveillance 10 PFP # 13A Pre-Fire Plan Main Corridor North 04 PFP # 13A Pre-Fire Plan Main Corridor South 04 PFP # 2 Pre-Fire Plan Cable Spreading Room 04 PFP # 9 Pre-Fire Plan Screen House/Intake Structure 04
: SOP-21 Fire Protection System 29
: TRAINING DOCUMENTATION Number Description or Title Date or Revision
: PL-N10044 SOER 98-02 Breaker Training 01
: PLLP-NLO-ISBD Station Power Breakers 03
: VENDOR DOCUMENTS Number Description or Title Date or Revision Catalog Models
: DF-3, Df-3A Pyrotronics Ultraviolet Flame Detector August 1985 Model
: DIS-5B4 Pyr-A-Larm Ionization Detector February 1977
: WORK ORDERS Number Description or Title Date or Revision
: 52510622 01
: FPSP-RP-11
: Fire Barrier Penetration Insp February 18, 2015
: 52526113 01
: FPSP-ST-1
: Fire Detector Sys Outside Cont Func Test July 27, 2014
: 52572433 01
: FPSP-SO-2
: Safety Related Fire Door Inspection October 22, 2014
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[ADAMS]] [[Agencywide Document Access Management System]]
: [[AOP]] [[Abnormal Operating Procedure]]
: [[CAP]] [[Corrective Action Program]]
: [[CFR]] [[Code of Federal Regulations]]
: [[IMC]] [[Inspection Manual Chapter]]
: [[IP]] [[Inspection Procedure]]
: [[MSO]] [[Multiple Spurious Operations]]
: [[NCV]] [[Non-Cited Violation]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NFPA]] [[National Fire Protection Association]]
: [[NRC]] [[]]
: [[U.S.]] [[Nuclear Regulatory Commission]]
: [[NSCA]] [[Nuclear Safety Capability Assessment]]
: [[PARS]] [[Publicly Available Records System]]
: [[PRA]] [[Probabilistic Risk Assessment]]
: [[PSA]] [[Probabilistic Safety Assessment]]
: [[SDP]] [[Significance Determination Process]]
: [[SER]] [[Safety Evaluation Report]]
: [[SRA]] [[Senior Reactor Analyst SSD Safe Shutdown]]
: [[A.]] [[Vitale -2- In accordance with Title 10 of the Code of Federal Regulations (10]]
: [[CFR]] [[) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).]]
: [[ADAMS]] [[is accessible from the]]
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA Jasmine Gilliam Acting for/
Robert
: [[C.]] [[Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-255 License No.]]
: [[DPR]] [[-20 Enclosure:   Inspection Report 05000255/2015008  w/Attachment:  Supplemental Information cc w/encl:  Distribution via]]
}}
}}

Revision as of 01:07, 1 July 2018

IR 05000255/2015008; on 03/18/2015 - 04/16/2015; Palisades Nuclear Plant; Routine Triennial Fire Protection Baseline Inspection. (Dxs)
ML15138A138
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/15/2015
From: Daley R C
Engineering Branch 3
To: Vitale A
Entergy Nuclear Operations
References
IR 2015008
Download: ML15138A138 (21)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 May 15, 2015 Mr. Anthony Vitale Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043

-9530

SUBJECT: PALISADES NUCLEAR PLANT, TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000255/2015008

Dear Mr. Vitale:

On April 16, 2015, the U.S. Nuclear Regulato ry Commission (NRC) completed a triennial fire protection inspection at your Palisades Nuclear Plant. The enclosed inspection report documents the inspection results, which were discussed on April 16, 2015, with Mr. P. Russell and other members of your staff

. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations

, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The NRC inspectors documented one finding of very-low safety significance (Green) in this report. This finding was determined to involve a violation of NRC requirements.

However, because of its very-low safety significance

, and because the issue was entered into your Corrective Action Program, the NRC is treating the issue as a Non-Cited Violation (NCV) in accordance with Section 2.3.2 of the NRC Enforcement Policy.

If you contest the subject or severity of the N CV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555

-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001; and the NRC Resident Inspector at the Palisades Nuclear Plant

. In addition, if you disagree with the cross

-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Palisades Nuclear Plant

. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA Jasmine Gilliam Acting for/

Robert C. Daley, Chie f Engineering Branch 3 Division of Reactor Safety Docket No. 50

-255 License No. DPR

-20

Enclosure:

Inspection Report 05000 255/2015008

w/Attachment:

Supplemental Information cc w/encl: Distribution via LISTSERV

Enclosure U. S. NUCLEAR REGULATORY COMMISSION REGION III Docket No

50-255 License No
DPR-20 Report No:

05000255/2015008 Licensee:

Entergy Nuclear Operations, Inc.

Location:

Covert, MI Dates: March 18

- April 16, 2015 Inspectors:

A. Dahbur, Senior Reactor Inspector D. Szwarc, Senior Reactor Inspector (Lead)

R. Winter, Reactor Inspector Accompanying D. Passehl, Senior Reactor Analyst Personnel

Approved by:

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety 2

SUMMARY OF FINDINGS

Inspection

Report 05000255/2015008; 03/18/2015

-04/16/2015

Palisades Nuclear Plant
Routine Triennial Fire Protection Baseline Inspection.

This report covers an announced triennial fire protection baseline inspection. The inspection was conducted by Region III inspectors. One finding was identified by the inspectors. The finding was considered a Non-Cited Violation (NCV) of U.S Nuclear Regulatory Commission (NRC) regulations. The significance of most findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process (SDP).

" Cross-cutting aspects were determined using IMC 0310, "Aspects Within the Cross-Cutting Areas." Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review.

All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated July 9, 2013. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG

-1649, "Reactor Oversight Process," Revision 5

, dated February 2014

.

NRC-Identified

and Self-Revealed Findings

Cornerstone: Mitigating Systems

Green.

The inspectors identified a finding of very-low safety significance

, and an associated NCV of Title 10, Code of Federal Regulations (CFR) 50.48(c), and National Fire Protection Association Standard 805, Section 2.4.3.3 for the licensee's failure to correctly model the as-built plant in the Fire Probabilistic Risk Assessment (PRA).

Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels. The licensee entered this issue into their Corrective Action Program

, and already had compensatory measures in place in the cable spreading room, including hourly fire tours and a standing order for an immediate call out for the fire brigade for a fire alarm in the room.

The inspectors determined that the performance deficiency was more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern. Specifically, the licensee's failure to correctly model/analyze the as-built condition of the suppression system located in the cable spreading room in the PRA could potentially affect the risk associated with a fire in the room

, and could result in inappropriately screening out the effects of other changes associated with the fire area.

Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees

' PRAs. The Senior Reactor Analyst concluded that the finding was of very-low safety significance (Green) because while there may be a change to the plant's baseline risk as a result of this issue, there is no delta plant risk due to a deficiency in the licensee's PRA model/analysis. This finding has a cross-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups.

(Section 1R05.3b) [H.4]

3

REPORT DETAILS

REACTOR SAFETY

Cornerstone s: Initiating Events and Mitigating Systems

1R05 Fire Protection

(71111.05 XT) The inspectors conducted the inspection in accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP)71111.05XT, "Fire Protection

- National Fire Protection Association (NFPA) 805 (Triennial)," issued January 31, 2013. The inspectors reviewed the licensee's Fire Protection Program against the requirements of NFPA 805, "Performance

-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition," as incorporated by Title 10, Code of Federal Regulation (CFR) Part 50.48(c). The NFPA 805 standard establishes a comprehensive set of requirements for Fire Protection Programs at nuclear power plants. The standard incorporates both deterministic and risk

-informed performance

-based concepts. The deterministic aspects of the standard are comparable to traditional requirements.

The inspectors conducted a design

-based, plant

-specific, risk

-informed, onsite inspection of the licensee's Fire Protection Program's defense

-in-depth elements used to mitigate the consequences of a fire. The inspectors reviewed the licensee's Fire Protection Program to ensure that it met the fire protection concept of defense

-in-depth for plant areas important to safety by:

preventing fires from starting; rapidly detecting, controlling and extinguishing fires that do occur; providing protection for structures, systems, and components important to safety so that a fire that is not promptly extinguished by fire suppression activities will not prevent the safe

-shutdown of the reactor plant; and taking reasonable actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires.

The inspectors evaluated the licensee's Fire Protection Program by focusing on the design, installation, operational status, testing, and material condition of the Fire Protection Program, post

-fire safe shutdown (

SSD) systems, and B.5.b mitigating strategies. The inspectors verified that the licensee's program is sufficiently implemented and maintained to satisfy that nuclear safety and radioactive release goals, objectives, and performance criteria for all operational modes and plant configurations.

In addition, the inspectors' review and assessment focused on the licensee's post

-fire SSD systems for selected risk

-significant fire areas. Inspector emphasis was placed on determining that the post

-fire SSD capability and the fire protection features were maintained free of fire damage to ensure that at least one post

-fire SSD success path was available.

The inspectors' review and assessment also focused on the licensee's B.5.b related license conditions, and the requirements of 10 CFR 50.54 (hh)(2). The inspectors' emphasis was to ensure that the licensee could maintain or restore core cooling, containment, and spent fuel pool cooling capabilities utilizing the B.5.b 4 mitigating strategies following a loss of large areas of power reactor facilities due to explosions or fires. Documents reviewed are listed in the Attachment to this report.

The fire areas and B.5.b mitigating strategies selected for review during this inspection are listed below and in Section 1R05.15. The fire areas selected constituted three inspection samples and the B.5.b mitigating strategies selected constituted two inspection samples, respectively, as defined in IP 71111.05XT. Fire Area Description 2 Cable Spreading Room 9 Intake Structure 13A Auxiliary Building 590' Corridor

.1 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The inspectors reviewed the licensee's fire response abnormal operating procedures (AOPs) to verify that the shutdown methodology properly identified the components and systems necessary to achieve and maintain safe and stable plant conditions. The inspectors performed a walk

-through of portions of the shutdown from outside of the control room AOP

-41, "Alternate SSD Procedure," Revision 1, to ensure that operators could reasonably perform the actions specified in the procedure.

b. Findings

No findings were identified.

.2 Passive Fire Protection

a. Inspection Scope

For the selected fire areas, the inspectors evaluated the adequacy of fire area barriers, penetration seals, fire doors, electrical raceway fire barrier systems, and fire rated electrical cables. The inspectors walked down accessible portions of the selected fire areas to observe material condition, construction details, and the adequacy of design of fire area boundaries (including walls, fire doors, and fire dampers) to ensure they were appropriate for the fire hazards in the area. The inspectors reviewed license documentation, such as the NRC NFPA 805 Safety Evaluation Report (SER), and NFPA standards to verify that Fire Protection Program features met license commitments. The inspectors reviewed the installation, repair, and qualification records for a sample of penetration seals to ensure the fill material was of the appropriate fire rating, and that the installation met the engineering design. In addition, the inspectors reviewed a sample of surveillance and maintenance procedures for selected fire doors, fire dampers, and fire barrier penetration seals to assure they were properly inspected and repaired.

b. Findings

No findings were identified.

5

.3 Active Fire Protection

a. Inspection Scope

The inspectors walked down and evaluated the adequacy of fire suppression and detection systems to determine that they were installed, tested, and maintained to adequately control and/or extinguish fires associated with the hazards of the selected fire areas. The inspectors observed the material condition, operational lineup, and design of the installed fire detection and suppression systems, including the electric motor driven, diesel motor driven, jockey fire pumps, carbon dioxide system, manual fire hose and standpipe systems, and fire extinguishers in the selected fire areas. The inspectors reviewed fire pre

-plans and procedures for the selected fire areas to determine if appropriate information was provided to fire brigade members. In addition, the inspectors observed the placement of the fire hoses, fire extinguishers, fire hose nozzle types, and fire hose lengths to verify they were not blocked, and that adequate reach and coverage was provided consistent with the fire protection features and potential fire conditions described in the NFPA 805 fire safety analysis calculations.

b. Findings

Failure to Correctly Assess the Suppression System in the Cable Spreading Room in the Probabilistic Risk Assessment for NFPA 805

Introduction:

The inspectors identified a finding of very

-low safety significance (Green), an associated Non

-Cited Violation (NCV) of 10 CFR 50.48(c), and NFPA 805, Section 2.4.3.3, for the licensee's failure to correctly model the as

-built plant condition in the Fire Probabilistic Risk Assessment (PRA); also referred to as a probabilistic safety assessment (PSA) in NFPA 805. Specifically, the licensee credited the suppression system located in the cable spreading room in the PRA to suppress type 2 fire scenarios, whereas the actual room contained numerous obstructions due to the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers. These obstructions could have prevented the suppression system from providing an adequate water density pattern to suppress a fire below the cable trays in areas which contained electrical panels.

Description:

The cable spreading room (Fire Area 2) contained electrical cabinets and cables from both safety

-related divisions. The electrical cabinets located in the room consisted of transformers, inverters, battery chargers, breakers, 480 volt load centers, motor control centers, and 125 volts direct current buses.

The cabling was located primarily in cable trays suspended above the electrical cabinets that were generally stacked three to four trays high. The majority of cable trays were of the ladder type construction without a solid top or bottom and were filled to capacity with electrical cables. The cable trays were typically separated by six inches to a foot of vertical clearance between stacked trays. This overall tray arrangement was generally present throughout the room.

The cable spreading room contained an automatic detection system and a wet pipe sprinkler system for automatic suppression. During the walk down in the area the inspectors noted that, due to density of cable trays, it was not possible to see the ceiling from standing on the floor in all but a few areas of the room. The inspectors also noted that all sprinkler heads were mounted near the ceiling with no sprinkler heads in the vertical clearances between cable trays and no sprinkler heads below 6 the cable trays. The inspectors were concerned that the sprinkler system would only be effective for extinguishing a fire in the upper cable trays.

The licensee installed the wet pipe sprinkler system in the cable spreading room in compliance with NFPA 13

-1968, "Standard for Installation of Sprinkler Systems." Section 4316

, "Obstructions" of NFPA 13

-1968 stated, in part, that, "timbers, uprights, hangers, piping, light fixtures, ducts, etc., are likely to interfere with proper distribution of water from sprinklers. Therefore, sprinklers should be so located or spaced that any interference is held to a minimum." The licensee's Engineering Report PLP

-RPT-12-00053, "NFPA Code Compliance Review," Revision 0 indicated that there were no requirements to comply with Section 4316. The licensee indicated in their response to the inspectors that the "should" statement in the NFPA standard section was only a recommendation and did not impose any requirements.

In 1995 during the Appendix R Enhancement Program, the licensee identified significant obstructions of the sprinklers in the cable spreading room by the stacked cable trays and completed an 86

-10 type of evaluation EA

-APR-95-033, and concluded that although there were no sprinklers located below the cable trays and the trays represented a significant obstructions to water discharge from the sprinklers located at the ceiling. The evaluation considered the configuration was acceptable since there were no significant in-situ combustibles located at the floor. The licensee's justification was based on that the hazard of concern in the room was the cables in cable trays. The in

-situ combustible materials in the room consisted primarily of the large amount of cable installed in the cable trays near the ceiling. The combustibles associated with panels and load centers were completely enclosed in metal cabinets and therefore would not be expected to burn completely during a fire.

The NRC approved the licensee's transition to NFPA 805 by the SER dated February 27, 2015. The licensees' current analysis for the Fire Protection Program for NFPA 805, calculation 0247 0005-06, "Palisades Nuclear Plant Fire P RA Fire," Revision 1

, documented the scenario development process and the individual scenario details used in the Palisades fire PRA using elements from NUREG/CR

-6850, "Fire PRA Methodology for Nuclear Power Facilities." Section 9.6

, "Cable Spreading Room," of calculation 0247 0005-06, indicated that due to the highly congested nature of the Palisades cable spreading room a modified approach to scenario development was required in order to model each scenario. The cable spreading room had a wet

-pipe sprinkler system installed in a grid

-like pattern. This system was credited to prevent fire propagation beyond an initial zone

-of-influence for the ignition sources in the cable spreading room. Grid coordinates were assigned to all risk

-relevant targets. These coordinates were used to determine the potential impacts of fire scenarios in the area.

Utilizing the distance to nearby targets and the grid coordinates; scenarios in the cable spreading room were developed with three type treatments as described below:

Type 1 - These scenarios represented a fire that was suppressed prior to damaging the first target beyond the ignition source. Manual suppression was credited for cabinets that were not well

-sealed. For sealed cabinets, credit for suppression was not required as this was the only postulated fire scenario.

Type 2 - These scenarios represented a fire that was not suppressed prior to damaging the first target. All targets within the grid coordinate(s) associated with 7 the ignition source are modeled as failed. These scenarios postulated successful suppression of the fire by the wet

-pipe suppression system that prevents the fire damage from extending past a sprinkler head.

Type 3 - These scenarios represented a fire that was not suppressed prior to damaging the first target and was further not suppressed by the wet

-pipe sprinkler system. Propagation to the remaining grid coordinates in the room was postulated with the associated failures.

Figure 10

-1, "Scenario Suppression Event Tree," in calculation 0247 0005-06, also showed that the automatic suppression was credited to prevent the formation of a hot gas layer or fire propagation beyond the zone of influence. The inspectors were concerned that the licensee's Fire PRA analysis incorrectly postulated successful suppression of the type 2 fire scenarios by the wet

-pipe sprinkler system to prevent fire propagation beyond the zone of influence below the cable trays. The Fire PRA analysis did not consider the significant obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing an adequate water density pattern to suppress a fire in areas below the cable trays which contain electrical panels.

The licensee entered this issue into their Corrective Action Program (CAP) as CR-PLP-2015-01593. Since the licensee was currently in the transition period to full implementation of the NFPA 805 licensing and design basis, compensatory measure were already established for the cable spreading room for other non

-compliances. Compensatory measures were in place as hourly fire tours and a standing order to immediately activate the fire brigade for fire alarms coming from the cable spreading room.

Analysis:

The inspectors determined that the licensee's failure to correctly consider the plant as-built condition in the PRA model/analysis was contrary to NFPA 805, Section 2.4.3.3 and was a performance deficiency. Specifically, the licensee failed to consider the obstructions to the suppression system in the cable spreading room when crediting the suppression system in the PRA model/analysis.

The performance deficiency was determined to be more than minor because the finding, if left uncorrected, would have the potential to lead to a more significant safety concern.

Specifically, the licensee's failure to correctly model/analyze the as

-built condition of the suppression system located in the cable spreading room

, in the fire PRA could potentially affect the risk associated with a fire in the room and could result in inappropriately screening out the effects of other changes associated with the fire area. The inspectors concluded this finding was associated with the Mitigating Systems cornerstone attribute of Protection Against External Factors (Fire)

, and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The Senior Reactor Analyst (SRA) evaluated the finding in accordance with Inspection Manual Chapter 0609, "Significance Determination Process (SDP)," dated April 29, 2015, and Appendix M, "S DP Using Qualitative Criteria," dated April 12, 2012. Appendix M was used because the existing SDP Appendices do not adequately address the risk of performance deficiencies associated with licensees' PRAs. The SRA 8 concluded that the finding was of very

-low safety significance (Green). While there may be a change to the plant's baseline risk as a result of this issue, this is a fire modeling issue only; no physical plant fire protection feature was altered by the fire PRA model. Therefore, there was no increase in actual core damage risk to the physical plant

.

The licensee's baseline fire PRA may change as Palisades has until August 27, 2015 to complete the procedure changes, process updates, and training items listed in License Amendment Request Attachment S, Table S

-3, "Implementation Items." Palisades also has until the end of the second full operating cycle after issuance of the SER t o implement other modifications identified in Attachment S, Table S

-2, "Plant Modifications."

This finding has a cross

-cutting aspect in the area of Human Performance associated with Team Work because the licensee did not communicate and coordinate activities between the PRA and the fire protection groups. Specifically, the fire protection group did not appropriately communicate to the PRA group that significant obstructions existed in the cable spreading room due to the stacked cable trays. As a result

, the licensee did not consider the impact of the obstructions of the automatic suppression system in the PRA model. [H.4]

Enforcement:

License condition 2.C(3) requires the licensee to implement and maintain in effect all provisions of the approved Fire Protection Program that complies with 10 CFR 50.48(a) and 10 CFR 50.48(c), "NFPA Standard NFPA 805," as approved in the SER dated February 27, 2015.

Section 2.4.3.3 of NFPA 805 states

, in part, that the PSA (PRA) approach, methods, and data shall be based on the as

-built and as

-operated and maintained plant, and reflect the operating experience at the plant.

Contrary to the above, from February 27, 2015

, until April 16, 2015

, the licensee failed to base the PSA (PRA) approach, methods, and data on the as

-built and as

-operated and maintained plant. Specifically, the licensee's PSA (PRA) model/analysis credited the suppression system located in the cable spreading room to suppress a type 2 fire scenarios, whereas the actual room contained numerous obstructions by the stacked cable trays located near the ceiling that interfered with the water spray pattern discharged from the sprinklers from providing adequate water density pattern to suppress a fire in areas below the cable trays which contained electrical panels. This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy, because it was of very

-low safety significance (Green), and was entered into the licensee's CAP as CR-PLP-2015-01593. The licensee currently has compensatory measures established in the cable spreading room including hourly fire tours, and a standing order for an immediate call out for the fire brigade for a fire alarm in the room. (NCV 05000255/2015008

-01; Failure to Correctly Assess the Suppressio n System in the Cable Spreading Room in the PRA for NFPA 805).

.4 Protection from Damage from Fire Suppression Activities

a. Inspection Scope

The inspectors evaluated that one success path to achieve and maintain the Nuclear Safety Performance Criteria could be achieved, and would not be adversely affected due to damage from fire suppression activities or from the rupture or inadvertent operation of manual fire suppression systems. The inspectors walked down the selected fire areas to 9 assess in

-plant conditions including adequacy and material condition of equipment spray protection, elevations of vulnerable equipment and checked that water would either be contained in the fire affected area, or be safely drained off through floor drains or to other areas. The inspectors addressed the possibility that a fire in one fire area could lead to the migration of smoke or hot gases to other plant areas.

b. Findings

No findings were identified.

.5 Shutdown from a Primary Control Station

a. Inspection Scope

The licensee was in the process of transitioning their Fire Protection Program to comply with 10 CFR 50.48(c), "National Fire Protection Association Standard NFPA 805." As a result the licensee was revising their AOPs. The inspectors' reviews focused on ensuring that the required functions for post

-fire SSD, and the corresponding equipment necessary to perform those functions were included in the fire response AOPs. The review included assessing whether safe and stable plant conditions from the primary control stations outside the main control room could be implemented and that transfer of control from the main control room to the remote shutdown panel could b e accomplished in accordance with procedure AOP-41, "Alternate S SD Procedure,

" Revision 1. The inspectors walked down the actions identified in the procedure with the licensee to verify operators were properly trained, assess human factors, and ensure the procedures could be completed as written.

b. Findings

No findings were identified

.6 Circuit Analyses

a. Inspection Scope

The inspectors verified that the licensee performed a Nuclear Safety Capability Assessmen t (NSCA) for the selected fire areas, and that the assessment identified the structures, systems, and components important for achieving safe and stable conditions. For each fire area, the inspectors reviewed the electrical schematics, flow diagrams, and the NSCA to identify any potential fire

-induced cable damage that could directly affect post-fire SSD. The inspectors reviewed a sample of circuit diagrams to verify that all appropriate cables had been selected and incorporated into the NSCA. The inspectors then evaluated selected circuits to ensure all fire scenarios had been identified, and dispositioned for all modes of operation including shut down operations, and abnormal plant configurations.

The inspectors verified that the NSCA demonstrated that hot shorts, shorts to ground, or other failures that would result in a spurious actuation will not affect the capability to meet the performance criteria. The inspectors verified that the licensee's assessment identified circuits that may impact the Nuclear Safety Performance Criteria. The assessment demonstrated that hot shorts, shorts to ground or other failures that would not result in a spurious actuation will not affect the capability to meet the performance 10 criteria.

The inspectors reviewed fire scenarios and cable attributes, potential undesirable consequences, and common power supply/bus concerns.

The inspectors also reviewed the licensee's response to multiple spurious operations (MSOs) as identified by Nuclear Energy Institute's (NEI's) document, NEI 00 01, and the site's Expert Panel. The review ensured that the licensee followed the approved guidance provided by NEI 00

-01, evaluated all appropriate MSO scenarios, and properly addressed any discrepancies.

b. Findings

No findings were identified.

.7 Communications

a. Inspection Scope

The inspectors reviewed, on a sample basis, the adequacy of the communication system to support plant personnel in the performance of alternative SSD functions and fire brigade duties. The inspectors verified that plant telephones, page systems, sound powered phones, and radios were available for use and maintained in working order.

b. Findings

No findings were identified.

.8 Emergency Lighting

a. Inspection Scope

The inspectors performed walkdowns of the selected fire zones, and observed the placement and coverage area of the fixed battery pack emergency lights credited for SSD. As part of the walkdowns, the inspectors focused on the existence of sufficient emergency lighting for access and egress to areas, and for performing necessary equipment operations. The inspectors verified that battery power supplies had sufficient capacity to support recovery actions necessary to meet the Nuclear Safety Performance Criteria. The inspectors reviewed the operability testing and maintenance of the lightning units to ensure that they followed licensee procedures, and accepted industry practice.

b. Findings

No findings were identified.

.9 Cold Shutdown Repairs

a. Inspection Scope

The inspectors determined that the licensee does not credit cold shutdown repairs to meet the Nuclear Safety Performance Criteria. The inspectors reviewed the NSCA to verify that the licensee had evaluated the need for cold shutdown repairs. The inspectors also interviewed licensee personnel, and determined that the licensee does not require transitioning to cold shutdown to achieve a safe and stable condition.

11

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

The inspectors conducted a review to verify that compensatory measures were in place for out of service, degraded, or inoperable fire protection, and post

-fire SSD equipment, systems, or features (e.g., detection and suppression systems, and equipment, passive fire barriers, pumps, valves or electrical devices providing SSD functions or capabilities). The inspectors also conducted a review of the adequacy of short term compensatory measures to compensate for a degraded function or feature until appropriate corrective actions were taken.

b. Findings

No findings were identified.

.11 Radiological Release

a. Inspection Scope

The inspectors verified that the licensee had provided reasonable assurance that a fire would not result in a radiological release that adversely affects the public, plant personnel, or the environment in accordance with NFPA 805, Section 1.3.2. The inspectors verified that the licensee had evaluated the potential for radioactive releases to any unrestricted areas resulting from fire suppression activities were as

-low-as-reasonably

-achievable. The inspectors verified that the licensee had analyzed radioactive release on a fire area basis in accordance with NFPA 805, Section 2.2.4. The inspectors walked down the selected fire zones, and verified that the pre

-fire plan tactics and instructions were consistent with the potential radiological conditions identified in the fire hazards analysis.

b. Findings

No findings were identified.

.12 Non-Power Operations

a. Inspection Scope

The plant did not enter an outage during the inspection.

However, the inspectors verified that the licensee had defined specific pinch points where one or more key safety functions could be lost during non

-power operations.

b. Findings

No findings were identified.

12

.13 Monitoring Program

a. Inspection Scope

The inspection occurred during the licensee's 6-month implementation window for certain items listed in Table S

-3, "Implementation Items," of Entergy Nuclear Operations, Inc. letter PNP 2014

-097, dated November 4, 2014. The NRC approved a 6

-month implementation window for items listed in that table in the S ER dated February 27, 2015. During the inspection the licensee was in the process of developing and implementing the NFPA 805 monitoring program per NFPA 805 Section 2.6. The inspectors did not review the licensee's Monitoring Program because it was not complete.

b. Findings

No findings were identified.

.14 Plant Change Evaluation

a. Inspection Scope

The licensee had not completed any plant change evaluations during the time between issuance of the NFPA 805 license amendment on February 27, 2015

, and the end of the inspection

.

b. Findings

No findings were identified.

.15 B.5.b Inspection Activities

a. Inspection Scope

The inspectors reviewed the licensee's preparedness to handle large fires or explosions by reviewing selected mitigating strategies. This review ensured that the licensee continued to meet the requirements of their B.5.b related license conditions and 10 CFR 50.54(hh)(2) by determining that:

Procedures were being maintained and adequate; Equipment was properly staged, maintained, and tested; Station personnel were knowledgeable and could implement the procedures; and Additionally, inspectors reviewed the storage, maintenance, and testing of B.5.b related equipment.

The inspectors reviewed the licensee's B.5.b related license conditions and evaluated selected mitigating strategies to ensure they remain feasible in light of operator training, maintenance/testing of necessary equipment and any plant modifications.

In addition, the inspectors reviewed previous inspection reports for commitments made by the licensee to correct deficiencies identified during performance of Temporary Instruction 2515/171 or subsequent performances of these inspections.

13 The B.5.b mitigating strategies selected for review during this inspection are listed below. The offsite and onsite communications, notifications/emergency response organization activation, initial operational response actions and damage assessment activities identified in Table A.3 1 of NEI 06

-12, "B.5.b Phase II and III Submittal Guidance," Revision 2

, are evaluated each time due to the mitigation strategies' scenario selected.

NEI 06-12, Revision 2, Section Licensee Strategy (Table)3.3.3 Manual Operation of Turbine Driven Auxiliary Feedwater Pump (A.4-3) 3.3.5 Makeup to the Condensate Storage Tank (A.4-5)

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA2 Identification and Resolution

of Problems (71152)

a. Inspection Scope

The inspectors reviewed the licensee's CAP procedures and samples of corrective action documents to verify that the licensee was identifying issues related to the Fire Protection Program at an appropriate threshold and entering them in the CAP. The inspectors reviewed selected samples of condition reports, design packages, and fire protection system non

-conformance documents.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Exit Meeting Summary

On April 16, 2016, the inspectors presented the inspection results to Mr. P. Russell, and other members of the licensee staff. The licensee acknowledged the issues presented.

The inspectors confirmed that none of the potential report input discussed was considered proprietary.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC

T Licensee

B. Baker, Operations Manager
A. Bono, Engineer
J. Borah, System

s and Components Engineering Manager

D. Campbell, Fire Marshall
B. Dotson, Regulatory Assurance Specialist
J. Hardy, Regulatory Assurance Manager
J. Kneeland, Fire Protection Engineer
J. Milliken, Code Programs Supervisor
P. Russell, Engineering Director
K. Simpson, Fire Marshall
T. Swiecicki, Senior Lead Engineer
A. Williams, General Manager, Plant Operations

U.S. Nuclear Regulatory Commission

B. Boston, Acting Resident Inspector
R. Daley, Branch Chief, EB3
A. Garmoe, Senior Resident Inspector
J. Lennartz, Acting Senior Resident Inspector
A. Scarbeary, Senior Resident Inspector

LIST OF ITEMS OPENED, CLOSED AND DISCUSS

ED Opened and Closed

05000255/2015008

-01 NCV Failure to Correctly Assess the Suppression System in the Cable Spreading Room in

the Probabilistic Risk Assessment for NFPA 805 (Section 1R05.3b)

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during

the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of

a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

CALCULATIONS

Number Description or Title

Date or Revision

247-07-0005-04 Palisades Nuclear Plant Fire Probabilistic Risk Assessment Multiple Spurious Operations Report

EA-APR-95-008 10CFR50 Safe Shutdown Manual Actions Feasibility Analysis

EA-ELEC-EDSA-06 Palisades AC Power System EDSA Model

EA-FPP-03-001 Fire Loading Calculation

EA-FPP-05-002 Evaluation of Combustibles Between Service Water Pumps and Diesel Fire Pumps P

-41 02 EA-FPP-FRE-001 NFPA 805 Fire Risk Evaluations

CORRECTIVE ACTION PROGRAM DOCUMENTS ISSUED DURING INSPECTION

Number Description or Title

Date or Revision

CR-PLP-2015-01188 Information Not Included in the Fire Safety Analyses for Fire Areas 13 and 27 in DBD

-7.10 March 19, 2015

CR-PLP-2015-01190 Steam Generator Level Indicator Not Reading Correctly

March 19, 2015

CR-PLP-2015-01191 Fuses Located on Top of

De-Energized Breaker

March 19, 2015

CR-PLP-2015-01330 Wireless Camera On the East Wall of the Component Cooling Water Room

March 31, 2015

CR-PLP-2015-01376 Procedure AOP

-20 Had Incorrect Breaker Label

April 2, 2015

CR-PLP-2015-01378 Procedure Binders Located Next to Power Converter in Cable Spreading Room

April 2, 2015

CR-PLP-2015-01383 Evaluate Need for Additional Information in AOP-41 April 2, 2015

CR-PLP-2015-01524 Editorial Correction to Drawing E

-129 April 14, 2015

CR-PLP-2015-01579 Bundle of Signal Wire Visible in the Cable Tray Above Fire Door 168

April 16, 2015

CR-PLP-2015-01580 Paper Wedged Between Wall and EC -121 H2 Recombiner M

-69B Power Cabinet in Cable Spreading Room

April 16, 2015

CR-PLP-2015-01583 Racking Tools for EB

-77 in the Old Baler Room are being Stored Laying on the Side of the Transformer

April 16, 2015

CR-PLP-2015-01585 Evaluation EA

-APR-98-002 Should Have been Required to be Transitioned to NFPA 805

April 16, 2015

CR-PLP-2015-01590 Issues with Hydrogen and Nitrogen Bottle

s April 16, 2015

CR-PLP-2015-01593 NRC Finding Related to Probabilistic Safety Assessment Approach Crediting Suppression

April 16, 2015

CR-PLP-2015-01595 Concern with Hydrogen Bottle in Room 233

April 16, 2015

CORRECTIVE ACTION PROGRAM DOCUMENTS REVIEWED

Number Description or Title

Date or Revision

CR-PLP-2004-08321 Potential Fire Induced Cable Damage May Spuriously Operate MOV

December 17, 2004

CR-PLP-2006-00687 Potential to Lose PCS Inventory in Fire Area 13

February 14, 2006

CR-PLP-2007-01947 Breaker Numbers Inconsistent Between Analyses and Procedure

May 9, 2007

CR-PLP-2007-02237 ONP-25.2 Contained Errors for a Significant Time

May 25, 2007

CR-PLP-2014-04935 Fire Door

-74 Not Latching Because Of Knob Mechanism Sticking

October 11, 2015

CR-PLP-2014-04941 Fire Door

-80 Has Excessive Signage

October 11, 2015

CR-PLP-2014-04961 Fire Door

-256 Procedure Needed To Be Revised To Provide Inspection Method For Watertight

Door October 12, 2014 DRAWINGS Number Description or Title

Date or Revision

E-139 Sheet 1A

Schematic Diagram

- Diesel Generator Breaker

2-213 04 E-242 Sheet 1

Schematic Diagram

- Control Shutdown Cooling and Pressure Relief Motor Operated Valves 23 E-253 Sheet 1

Schematic Diagram

- Pressurizer Heater Transformer Feeder Breaker

M-207 Sheet 2

Piping & Instrument Diagram Auxiliary Feedwater System

M-216 Sheet 1

Piping & Instrument Diagram Fire Protection System 49 M-216 Sheet 4

Fire Protection EL. 570' & 590'

M-216 Sheet 6

Fire Protection EL. 607' & 611'

-0" 11 VEN-M66 Sheet 21

Fire protection Sprinkler System FA 9

VEN-M66 Sheet 6

Fire protection Sprinkler System FA 2

EVALUATIONS

Number Description or Title Date or Revision

PLP-RPT-12-00053 NFPA Code Conformance Review

PLP-RPT-12-00100 Fire Suppression Activities Effect on Nuclear Safety Performance Criteria

OTHER Number Description or Title

Date or Revision

--- B.5.b Phase 2 &3 Basis Document 0 09-4005.1 Nexus Report

- Radioactive Release Review for Palisades Nuclear Plant

September 20, 2012

EN-OP-112 Night & Standing Order Log

April 2, 2015

GEN-017 Palisades Alternate Resources

PROCEDURES

Number Description or Title

Date or Revision

AOP -6 Loss of Condenser Vacuum

AOP -7 Rapid Power Reduction

AOP-20 EDG 1-1 Malfunctions

AOP-41 Alternate Safe Shutdown Procedure

EN-DC-161 Control of Combustibles

EN-IS-109 Compressed Gas Cylinder Handling And Storage Combustibles

EN-TQ-125 Fire Brigade Drills

EOP Supplement 19

Alternate Auxiliary Feedwater Methods

EOP Supplement 31

Supply AFW Pumps From Alternate Sources

EOP-9.0 Functional Recovery Procedure

FPIP-4 Fire Protection Systems And Fire Protection Equipment

FP-PE-16 Fire Protection Check Sheet B.5.b Equipment

FP-PE-3 Auxiliary Building Fire Extinguisher Inspection

April 1, 2015

FPSP-RO-9 Fire Protection Surveillance

FPSP-RP-11 FPSP-RP-11 Fire Barrier Penetration

Surveillance

PFP # 13A

Pre-Fire Plan Main Corridor North

PFP # 13A

Pre-Fire Plan Main Corridor South

PFP # 2 Pre-Fire Plan Cable Spreading Room

PFP # 9 Pre-Fire Plan Screen House/Intake Structure

SOP-21 Fire Protection System

TRAINING DOCUMENTATION

Number Description or Title

Date or Revision

PL-N10044 SOER 98-02 Breaker Training

PLLP-NLO-ISBD Station Power Breakers

VENDOR DOCUMENTS

Number Description or Title

Date or Revision

Catalog Models DF

-3, Df-3A Pyrotronics

Ultraviolet Flame Detector

August 1985

Model DIS

-5B4 Pyr-A-Larm Ionization Detector

February 1977

WORK ORDERS

Number Description or Title

Date or Revision

2510622 01

FPSP-RP-11 Fire Barrier Penetration Insp

February 18, 2015

2526113 01

FPSP-ST-1 Fire Detector Sys Outside Cont Func Test

July 27, 2014

2572433 01

FPSP-SO-2 Safety Related Fire Door Inspection

October 22, 2014

LIST OF ACRONYMS USE

D ADAMS Agencywide Document Access Management System

AOP Abnormal Operating Procedure

CAP Corrective Action Program

CFR Code of Federal Regulations

IMC Inspection Manual Chapter

IP Inspection Procedure

MSO Multiple Spurious Operations

NCV Non-Cited Violation

NEI Nuclear Energy Institute

NFPA National Fire Protection Association

NRC U.S. Nuclear Regulatory Commission

NSCA Nuclear Safety Capability Assessment

PARS Publicly Available Records

System PRA Probabilistic Risk Assessment

PSA Probabilistic Safety Assessment

SDP Significance Determination Process

SER Safety Evaluation Report

SRA Senior Reactor Analyst

SSD Safe Shutdown

A. Vitale

-2- In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA Jasmine Gilliam Acting for/

Robert

C. Daley, Chie

f Engineering Branch 3

Division of Reactor Safety

Docket No. 50

-255 License No. DPR

-20 Enclosure:

Inspection Report 05000255/2015008

w/Attachment: Supplemental Information

cc w/encl: Distribution via LISTSERV

DISTRIBUTION

Kimyata MorganButler

RidsNrrPMPalisades Resource

RidsNrrDorlLpl3

-1 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII DRSIII Jim Clay Carmen Olteanu

ROPreports.Resource@nrc.gov

ADAMS Accession Number ML15138A138

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII NAME DSzwarc: cl

JGilliam for RDaley DATE 05/14/15 05/15/15 OFFICIAL RECORD COPY