Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000255/20173022017-08-16016 August 2017 NRC Initial License Reexamination Report 05000255/2017302 (Meb) IR 05000255/20153012015-02-18018 February 2015 Er 05000255/2015301; on 01/21/15 - 01/28/15; Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Initial License Examination Report IR 05000255/20143012014-11-0505 November 2014 Er 05000255/2014301, September 8, 2014 Through October 14, 2014Palisades Initial License Examination Report IR 05000255/20103012010-10-13013 October 2010 Er 05000255-10-301(DRS) on 08/16/10 - 09/01/10 for Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20093012009-06-30030 June 2009 Er 05000255/09-301 (DRS) on 06/01/09 - 06/09/09 for Palisades IR 05000255/20083012008-08-14014 August 2008 Er 05000255-08-301(DRS), on 07/07/2008 - 07/11/2008, Palisades Nuclear Plant, Initial License Examination Report IR 05000255/20073012007-10-22022 October 2007 Er 05000255-07-301, on 09/10/07 - 09/14/07, Palisades Nuclear Plant; Initial License Examination Report ML0608102942006-03-21021 March 2006 03/21/06 Initial License Examination Report 2006-301 IR 05000255/20053012005-07-14014 July 2005 Er 05000255-05-301(DRS); 05/23/2005-06/01/2005; Palisades Nuclear Plant Initial License Examination Report ML0219804662002-07-0909 July 2002 Voluntary Response to NRC Regulatory Issue Summary 2002-09: Preparation and Scheduling of Operator Licensing Examinations 2017-08-16
[Table view] |
Text
UNITED STATES ary 18, 2015
SUBJECT:
PALISADES NUCLEAR PLANT NRC INITIAL LICENSE EXAMINATION REPORT 05000255/2015301
Dear Mr. Vitale:
On January 28, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for one licensed applicant employed at your Palisades Nuclear Plant. The applicant failed the written examination administered during the October 2014 initial license examination, and was administered a re-take senior reactor operator portion of the written examination. The enclosed report documents the results of that examination. An exit meeting was conducted by telephone on February 3, 2015, between Mr. R. White, Operations Training Superintendent, of your staff, and Mr. M. Bielby, Senior Operation Engineer, to review the proposed final grading of the written examination for the licensed applicant. During the telephone conversation, it was noted that there were no post-examination comments from the facility, and the facility agreed with the final grading of the examination.
The NRC waived the operating test and reactor operator (RO) portion of the written examination based on the applicants performance during the October 2014 initial license examination.
The senior reactor operator (SRO) portion of the written examination was administered by Palisades Nuclear Plant training department personnel on January 21, 2015. The result of the examination was finalized on February 3, 2015. The applicant passed the examination and was issued an SRO license.
The written examination and other related written examination documentation will be withheld from public disclosure for 24 months per your request.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20
Enclosure:
Operator Licensing Examination Report (ER) 05000255/2015301 w/Attachment: Supplemental Information
REGION III==
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2015301 Licensee: Entergy Nuclear Operations, Inc.
Facility: Palisades Nuclear Plant Location: Covert, MI Dates: January 21 - 28, 2015 Examiner: M. Bielby, Senior Operations Engineer Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
ER 05000255/2015301; 01/21/15 - 01/28/15; Entergy Nuclear Operations, Inc., Palisades
Nuclear Plant; Initial License Examination Report.
The announced initial operator licensing examination was conducted by a regional NRC examiner, in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
Examination Summary One Senior Reactor Operator (SRO) applicant passed the SRO written re-take examination.
The operating test and RO portion of the written examination was waived based on the applicants performance during the October 2014 Initial License Examination. The applicant was issued an SRO license. (Section 4OA5.1).
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9-Supplement 1, to develop, validate, administer, and grade the Senior Reactor Operator (SRO) portion of the written examination. Members of the facility licensees staff prepared the outline and developed the written examination. Because of the applicants performance on the October 2014 operating test and the Reactor Operator (RO) portion of the written examination for the Initial License Examination, the NRC waived those portions of this examination as requested by the licensee. Since the operating test and RO portion of the written examination were waived, no outline was developed for those respective items.
The facility licensee administered the SRO portion of the written examination on January 21, 2015.
b. Findings
- (1) Written Examination The NRC examiner determined that the SRO written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory, and required modification or replacement. All changes made to the proposed written examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet, which will be available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS) (ML15034A192).
On January 28, 2015, the licensee submitted documentation noting that there were no post-examination comments for consideration by the NRC examiner when grading the written examination. The final as-administered SRO written re-take examination, and answer key (ADAMS Accession Number ML15034A192), will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS.
The NRC examiner graded the written examination on February 3, 2015, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
- (2) Operating Test Because of the applicants performance during the October 2014 Initial License Examination, and per the applicants request, the Operating Test portion of this examination was waived. No operating test was proposed or administered.
- (3) Examination Results One applicant at the SRO level was administered an SRO written examination.
Because of the applicants performance during the October 2015 Initial License Examination, and per the applicants request, the RO portion of the written examination was waived. The applicant passed the SRO written re-take examination and was issued an SRO license.
.2 Examination Security
a. Scope
The NRC examiner reviewed the licensee's implementation of examination security requirements during the examination development and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, Integrity of Examinations and Tests. The examiner used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, to determine acceptability of the licensees examination security activities.
b. Findings
No findings were identified in this area.
4OA6 Management Meetings
.1 Exit Meeting
The chief examiner conducted an exit meeting on February 3, 2013, with Mr. R. White, Operations Training Superintendent, by telephone. The NRCs final disposition of the stations post-examination comments were disclosed and discussed with Mr. R. White during the telephone discussion. The examiner asked the licensee whether any of the material used to develop or administer the examination, should be considered proprietary. No proprietary or sensitive information was identified during the examination or exit meeting.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- R. White, Operations Training Superintendent
- S. Botimer, Initial License Examination Author
U.S. Nuclear Regulatory Commission
- M. Bielby, Senior Operations Engineer
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed,
Discussed
None
LIST OF DOCUMENTS REVIEWED