IR 05000255/2019003

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000255/2019003
ML19318F463
Person / Time
Site: Palisades 
Issue date: 11/14/2019
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Corbin D
Entergy Nuclear Operations
References
IR 2019003
Download: ML19318F463 (21)


Text

November 14, 2019

SUBJECT:

PALISADES NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000255/2019003

Dear Mr. Corbin:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palisades Nuclear Plant. On October 15, 2019, the NRC inspectors discussed the results of this inspection with Mr. O. Gustafson, Director, Regulatory Assurance & Performance Improvement and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects

Docket No. 05000255 License No. DPR-20

Enclosure:

As stated

Inspection Report

Docket Number:

05000255

License Number:

DPR-20

Report Number:

05000255/2019003

Enterprise Identifier: I-2019-003-0055

Licensee:

Entergy Nuclear Operations, Inc.

Facility:

Palisades Nuclear Plant

Location:

Covert, MI

Inspection Dates:

July 01, 2019 to September 30, 2019

Inspectors:

B. Bartlett, Senior Operations Engineer

E. Fernandez, Reactor Inspector

G. Hansen, Sr. Emergency Preparedness Inspector

M. Holmberg, Senior Reactor Inspector

P. Laflamme, Senior Resident Inspector

T. Ospino, Reactor Engineer

J. Rutkowski, Project Engineer

J. Winslow, Resident Inspector

M. Ziolkowski, Sr Physical Security Inspector

Approved By:

Billy C. Dickson, Jr., Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palisades Nuclear Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report section: 71111.1

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The plant began the inspection period at rated thermal power and remained at or near rated thermal power until July 27, 2019. On July 27, 2019, plant operators down powered the plant and took the unit offline to conduct a planned maintenance outage. During the planned maintenance outage, the licensee completed repairs on control rod drive (CRD) mechanism 14 and 23 seals and the digital electro-hydraulic turbine control system. The plant operators restarted the plant on July 31, 2019 and the reactor reached rated thermal power on August 2, 2019. The plant remained at or near rated thermal power for the rest of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

(1) Right Train Service Water after QO-14 testing and strainer cleaning on August 29, 2019
(2) Left Train Component Cooling Water (CCW) after valve maintenance and testing on September 13 through 16, 2019 (3)12 Battery System on September 18, 2019

71111.04S - Equipment Alignment

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the 2400V 1C electrical system from September 23 through September 26, 2019

71111.05A - Fire Protection (Annual)

Annual Inspection (IP Section 03.02) (1 Partial)

(1)

(Partial)

The inspectors evaluated fire brigade performance during a drill on September 18, 2019. The inspectors were not able to observe and evaluate all of the important drill activities as part of this drill and will assess additional drill activities in 2019 in order to evaluate fire brigade performance.

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (5 Samples)

(1) Fire Area 15: Auxiliary Building Stairway and Engineering Safeguards Panel Room on August 23, 2019
(2) Fire Area 13B: Charging Pump Rooms on September 5, 2019
(3) Fire Area 28: West Engineered Safeguards Room on September 5, 2019
(4) Fire Areas 11 & 12: Battery Rooms on September 18, 2019
(5) Fire Area 2: Cable Spreading Room on September 24, 2019

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 02.02a.) (1 Partial)

(1)

(Partial)1D Switchgear room, Cable Spreading Room, and Battery Rooms. The licensee is evaluating the as found conditions of a drain line in the Cable Spreading Room as documented in CR-PLP-2019-03874. The inspectors are assessing the extent of condition and the licensee's actions associated with this CAP.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during a shutdown for a maintenance outage due to elevated CRD leakage on July 27, 2019
(2) The inspectors observed and evaluated licensed operator performance in the Control Room during reactor start-up and power ascension following CRD maintenance repairs on July 31, 2019

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a simulator scenario on September 10, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

(1) Ultimate Heat Sink during the week of July 15, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1)1-2 EDG Ventilation System during the week of September 23, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

(1) Elevated risk during CRD maintenance outage on July 29, 2019
(2) Scheduled 1-2 Emergency Diesel Generator (EDG) testing and maintenance, emergent troubleshooting of Pressurizer Heater Breakers, and NI-7 dropped rod card replacement during the week of August 19, 2019
(3) Emergent troubleshooting and repairs following Thermal Margin Monitor (TMM)

Channel D failure on September 10 and 11, 2019

(4) Emergent troubleshooting following TMM Channel C inoperability, elevated K-7B Main Feedwater (MFW) Pump turbine thrust bearing vibrations, and diving activities during the week of September 16, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (3 Samples)

(1) CR-PLP-2019-02906, Evaluation of Containment Area Monitors on August 5, 2019
(2) CR-PLP-2019-03099, Evaluation of Missed Main Steam Isolation Valve (MSIV) Surveillance Requirement 3.7.2.1 discovered on August 6, 2019
(3) CR-PLP-2019-02941, Evaluation of B Steam Generator MSIV solenoid valve SV-0505A on August 7, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

(1) Engineering Change (EC) 56669, Alternate Design to Trip Charging Pumps to Implement NFPA 805 during the weeks of September 2 and September 9, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

(1) Digital Electro-hydraulic power supply replacement on July 29, 2019
(2) Pressurizer Spray Valve CV-1057 repack and diagnostic valve test on July 30, 2019
(3) Visual examination results following CRD-14 and CRD-23 seal replacement on July 30, 2019
(4) Standard Operating Procedure 22 after replacement of P-209A, 1-1 EDG Fuel Oil Booster Pump on August 13, 2019
(5) Special Operating Procedure CVCO-4 after P-55A Charging Pump maintenance on August 28, 2019
(6) QI-25 after replacement of C TMM Display Screen on September 19, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated maintenance outage activities to repair CRD-14 and CRD-23 seals from July 27, 2019 to July 31, 2019

71111.22 - Surveillance Testing

Surveillance Tests (other) (IP Section 03.01) (2 Samples)

(1) RI-3A, High Pressurizer Pressure Channel Calibration on July 15, 2019
(2) QO-37, Main Steam Isolation and Bypass Valve testing on July 28, 2019

Inservice Testing (IP Section 03.01) (1 Sample)

(1) RO-146, CCW Pump Compressive Test on July 2, 2019

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) DWO-1, Primary Coolant System Daily Leak Rate Surveillance Test on July 10, 2019

71114.02 - Alert and Notification System Testing

Alert and Notification System Testing (1 Sample)

(1) The inspectors evaluated the following maintenance and testing of the alert and notification system:
  • Annual siren inspection and maintenance records for the period from July 2017 to June 2019
  • Monthly alert notification system (siren) tests for the period from July 2017 to June 2019

71114.03 - Emergency Response Organization Staffing and Augmentation System

Emergency Response Organization Staffing and Augmentation System (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization.

71114.05 - Maintenance of Emergency Preparedness

Maintenance of Emergency Preparedness (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1) A full scale Emergency Planning Drill on August 7,

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification 02.12 Drill/Exercise Performance

(1) Unit 1 (January 1, 2018 - March 31, 2019)

02.13 ERO Drill Participation (1 Sample)

(1) Unit 1 (January 1, 2018 - March 31, 2019)

02.14 Alert & Notification System Reliability (1 Sample)

(1) Unit 1 (January 1, 2018 - March 31, 2019)

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) Unit 1 (July 1, 2018 - June 30, 2019)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) Unit 1 (July 1, 2018 - June 30, 2019)

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) Unit 1 (July 1, 2018 - June 30, 2019)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

(1) Security Excellence Plan in-depth review during the week of August 5,

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification (TS) Surveillance Requirement 3.7.2.1 requires that the licensee verify at least every 18 months that the closure time of each Main Steam Isolation Valve (MSIV) is less than or equal to 5 seconds on an actual or simulated signal from each train under no flow conditions.

Contrary to the above, on August 6, 2019, licensee personnel identified that the MSIV closure time surveillance test only tested the valves from their individual train hand switches and failed to stroke time test the MSIVs from the opposite train hand switches. The missed surveillance had been occurring since January 23, 1996.

Significance/Severity: Green. The inspectors answered No to all the questions in IMC 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, because the licensee complied with TS Surveillance Requirement 3.0.3 for a missed TS Surveillance. In addition, the MSIVs had been timed from one hand switch but not the other train which supplied evidence that the valves were capable of performing their intended function. Therefore, the finding screened as Green.

Corrective Action References: The licensee entered this issue into their CAP as CR-PLP-2019-03099.

Observation: Security Excellence Plan In-depth Review 71152 In October 2018, the licensee identified a slow decline in attention to detail, engagement with direct reports, and standard adherence that led to multiple human performance and safety errors. The licensee implemented an improvement plan to reinforce standards, increase accountability for first line supervisors, and establish security officer expectations. In order to assess the licensees actions, the inspectors performed a selected issue follow-up inspection sample. The inspectors conducted a limited assessment of the security force. The assessment consisted of interviews with security officers from all shifts and various members of security supervision. The inspectors determined the licensee's improvement plan to be effective as implemented. No significant issues were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 15, 2019, the inspectors presented the integrated inspection results to Mr. O. Gustafson, Director, Regulatory Assurance & Performance Improvement and other members of the licensee staff.
  • On July 12, 2019, the inspectors presented the Emergency Preparedness Baseline Inspection inspection results to Mr. D. Corbin, Vice President, Operations and other members of the licensee staff.

THIRD PARTY REVIEWS

The inspectors reviewed an Institute on Nuclear Power Operations report that was issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04Q Corrective Action

Documents

CR-PLP-2016-

03412

ED-02 Battery Hair Line Cracks on the Jar Lids of the

Battery Cells

07/30/2016

CR-PLP-2016-

03426

Visual Inspection on ED-01 Station Battery Identified 3 Cells

with Hairline Cracks on the Jar Lids

07/25/2016

CR-PLP-2016-

03454

All Cells on ED-01 Showed Signs of Cracking from the Post

Seals Toward the Outer Edge of the Lid

07/27/2016

Drawings

M-208, Sheet 1A

Piping & Instrument Diagram, Service Water System

M-208, Sheet 1B

Piping & Instrument Diagram, Service Water System

M-209, Sheet 2

Piping & Instrument Diagram, Component Cooling System

M-209, Sheet 3

Piping & Instrument Diagram, Component Cooling System

M-213

Piping & Instrument Diagram, Service Water, Screen

Structure, and Chlorinator

Procedures

SOP-15

Service Water System

SOP-16

Component Cooling Water System

71111.04S

Corrective Action

Documents

CR-PLP-2019-

283

Discovered Water Dripping from the Bottom of V-96, Control

Room Ventilation Main Supply Fan Housing

07/22/2019

CR-PLP-2019-

00959

Replace Bumper Stop Assemblies on Select 2400V Bus 1C

Breakers

03/07/2019

CR-PLP-2019-

00996

Received PPC Alarms 2400V AC Bus 1D Voltage and

2400V AC to 1C Voltage Alarms for High Voltage

03/09/2019

CR-PLP-2019-

03812

While Performing WO 52796691, PM Breaker with Starter

2-2413, Found a Bad Contact

09/23/2019

Drawings

E-11, Sheet 1

Schematic Meter and Relay Diagram 2.4 KV System

Miscellaneous

DBD-3.04

Design Basis Document: 2400V AC System

Procedures

SOP-30

Station Power

71111.05A

Miscellaneous

Fire Drill Scenario

09/18/2019

71111.05Q Corrective Action

Documents

Resulting from

Inspection

CR-PLP-2019-

03785

NRC Identified that FZ-0032 on the East Wall of the 1-1

Diesel Generator Room to the Old Baler Room, has Mastic

that has Cracked Due to Movement of the 3 Inch Pipe

09/20/2019

Fire Plans

Pre Fire Plan

Fire Area 15 - Stairway & Engineering Safeguards Panel

Room

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Pre Fire Plan

Fire Areas 2, 11 & 12, 13 B, and 28

Miscellaneous

DBD-7.10

NFPA 805 Fire Protection Program

E-90 (Q)

Technical Specification for Furnishing and Installation of

Cables, Raceways, Terminations, Panel Modifications, and

Associated Work

71111.06

Corrective Action

Documents

CR-PLP-2019-

03874

As Found Conditions of Drain Line Associated with the

Cable Spreading Room Floor Drain Cleaning

9/26/2019

Miscellaneous

DBD-7.08

Plant Protection Against Flooding

Procedures

AOP-38

Acts of Nature

AOP-39

Internal Plant Flooding

71111.11Q Miscellaneous

SES-400

Dynamic Simulator Evaluation

Procedures

GOP-4

Mode 2 to Mode 1

GOP-8

Power Reduction and Plant Shutdown to Mode 2 or Mode 3

Greater than or Equal to 525 Degrees

71111.12

Corrective Action

Documents

CR-PLP-2013-

273

Damage to Intake Crib Top Plate Discovered by Diver

07/29/2013

CR-PLP-2016-

294

Functional Failure of the DGV System

2/18/2016

CR-PLP-2016-

01095

AS-DGV System has Exceeded its Performance Criteria of

Less than 2 Functional Failures in 24 Months

03/03/2016

CR-PLP-2016-

03189

Need to Generate a Work Order to Repair the Intake

Structure Rack

07/12/2016

CR-PLP-2016-

05680

V-24B, Diesel Generator Room Supply Fan, in Standby

Started Prior to the V-24A, Diesel Generator Room Supply

Fan

11/20/2016

CR-PLP-2018-

03085

Diesel Generator Ventilation System

07/02/2018

CR-PLP-2019-

209

Spring Dive Inspection Identified Holes in the Velocity Cap of

the Intake Structure

05/31/2019

CR-PLP-2019-

2606

Emergency Diesel Generator 1-2 Room was Indicating 87.5

Degrees F but Neither V-24C Diesel Generator Room

Supply Fan nor V-24D Diesel Generator Room Supply Fan

were Running

07/03/2019

CR-PLP-2019-

Received Alarm EK-0557, Diesel Generator 1-2 Trouble

08/07/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

03116

Unexpectedly

CR-PLP-2019-

03467

Maintenance Rule Functional Failure Determination for CV-

2099, PCP Controlled Bleed Off Containment Isolation,

Position Indication

09/04/2019

CR-PLP-2019-

03868

Noted on EDG 1-2 that the Temperature Probe Conduit for

TE-1479-LR has Come Loose from the LB Box

09/25/2019

Engineering

Changes

EC 63643

Monitor V-24A Fan Control Circuit Operation and Motor

Current

03/28/2016

EC 6402

EDG RM Vent Fan Temp Switch Replacement

Miscellaneous

DBD-1.07

Design Basis Document: Auxiliary Building HVAC System

PLP-RPT-12-

00026

EGAD-EP-10 Palisades Maintenance Rule Scoping

Document

System Health

Report

DGV - Diesel Generator Room HVAC

Q1-2019

Work Orders

WO 438690 03

TS-1828; Bench Prep New Switch

2/14/2016

WO 438690 05

2-2535 Install/Remove Monitoring Device

2/14/2016

WO 462441 01

TS-1828 (V24A); Check Calibration

01/30/2017

71111.13

Calibration

Records

CR-PLP-2019-

03865

VOP-0754, AFW to Steam Generator E-50A Isolation, has

Grease Separation and a Small Amount of Oil is Seeping

Out of the Actuator

09/25/2019

Corrective Action

Documents

CR-PLP-2019-

03118

Fuel Oil Leaking Past the Seal on Fuel Oil Booster Pump

Mounted on the North End of the EDG 1-1 at a Rate of

Approximately 16 Drops per Minute

08/08/2019

CR-PLP-2019-

285

NI-7 Rod Drop; Card did not Work as Desired

08/21/2019

CR-PLP-2019-

287

Ops Could not Reset and Close Breaker 52-1510

08/21/2019

CR-PLP-2019-

03321

Cubicle Heaters were On

08/22/2019

CR-PLP-2019-

03549

On PY-0102D, Thermal Margin Monitor Channel 'D' was

Blank/Dark

09/09/2019

Miscellaneous

Operator's Risk Reports

Various

Procedures

Admin 4.02

Control of Equipment

DWO-1

Operator's Daily/Weekly Items Modes 1, 2, 3, and 4

109

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EN-FAP-WM-002

Critical Evolutions

EN-WM-104

On-Line Risk Assessment

GOP-14

Shutdown Cooling Operations

SOP-35

Neutron Monitoring System

Work Orders

WO 477934

PY-0102D, CRT Monitor is Failing

09/11/2019

WO 531075

PY-0102D; Replace Components & Reset Error Code 75

09/11/2019

WO 531075 01

'D' TMM Failure Troubleshooting

09/09/2019

WO 531611

TH-056S K-7B Thrust Trip

09/20/2019

71111.15

Corrective Action

Documents

CR-PLP-2019-

2941

SV-0505A, Solenoid for 'B' S/G MSIV (CV-0501), was

Sluggish While Closing in Step 5.2.15

07/28/2019

CR-PLP-2019-

2964

Steam Generator B Main Steam Isolation Sluggish

Operation While Closing

07/29/2019

CR-PLP-2019-

03099

Missed TS Surveillance Requirement for Main Steam

Isolation Valves in RI-17

08/06/2019

CR-PLP-2019-

03105

Suction Pressure for VC-10 (Control Room HVAC Refrig

Condensing Unit) was Observed to Cycle Between 48-54

psig

08/07/2019

Engineering

Changes

EC 83836

Risk Assessment for Missed Surveillance Requirement

SR 3.7.2.1

Miscellaneous

QO-37 Basis

Main Steam Isolation and Bypass Valve Testing

Procedures

MI-6

Area Monitor Operational Check

QO-37

Main Steam Isolation and Bypass Valve Testing

RI-17

Main Steam Isolation Valve Circuits Test and Valve Closure

Testing

Work Orders

WO 528713 01

RIA-1806/1807 Perform Partial MI-6

07/27/2019

71111.18

Engineering

Changes

EC 56669

Alternate Design to Trip Charging Pumps to Implement

Requirements of NFPA 805

Procedures

EN-DC-115

Engineering Change Process

Work Orders

WO 431058

805A, EC 56669, Alternate Design to Trip Charging Pumps

10/10/2018

71111.19

Corrective Action

Documents

CR-PLP-2019-

2815

Refurbished 13V DEH Power Supply Maintained 13 VDC up

to 3.8 A then Output Dropped to 10 VDC Above 4 A Load

07/20/2019

CR-PLP-2019-

2817

EC-06-03 SPI Cabinet Cooling Fan is Making an Intermittent

Squeaking Noise

07/20/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-PLP-2019-

2818

Control Room EDH Output Changed from 815 MW to 840

MW and then back to 815 MW

07/20/2019

CR-PLP-2019-

2966

Power Supply DC Output Steadily Declined from 12.520

VDC to 12.441 VDC Between 7/10/2019 and 7/27/2019

07/29/2019

CR-PLP-2019-

03007

While Performing PMT for CV-1057, PZR Spray Valve,

Noted CV-2057 Controls Pressure Properly @ NOP/NOT,

However, the Red (Open) Light does not Illuminate

07/30/2019

Miscellaneous

System Health

Report

Ultimate Heat Sink

Q1-2019

Procedures

EN-DC-196

Pressurizer Spray Valve from Loop 1B Stroke Test

08/05/2019

QI-25

Thermal Margin Monitor Constant Checks

SOP-22

Emergency Diesel Generators

Work Orders

WO 524133 04

CRD-23 CRD Seal Housing: PMT

07/30/2019

WO 527780 04

CRD-14 CRD Seal Housing: PMT

07/30/2019

WO 527870 03

EC-23; Drop 2/52, I/O Power Supplies - Return to Service

07/28/2019

WO 527941 01

EC-23; Backup Power Supply to DPY-2 & 52 Failed

08/15/2019

WO 52869306

CVCO-4 for P-55A

08/28/2019

WO 52886264

P-55A (T-105A) Accumulator Pressure Test

08/28/2019

WO 52890320

P-55A (T-106A) Accumulator PM

08/28/2019

WO 529518

P-209A (K-6A) Fuel Oil Leaking Past Seal on Booster Pump

08/13/2019

WO 5300855

PY-0102C; Display is Very Dim - Adjust Brightness on

Display

09/19/2019

71111.20

Corrective Action

Documents

CR-PLP-2019-

2860

CRD-23, Control Rod Drive Mechanism Took a Step Change

to 190-192 Degrees Fahrenheit

07/24/2019

CR-PLP-2019-

2861

CRD-14, Control Rod Drive Mechanism Spiked to

Approximately 175 Degrees Fahrenheit

07/24/2019

CR-PLP-2019-

2908

Following Manual Trip of the Reactor for the Planned

Outage, TA-0305B, Loss of Load Channel B RPS Aux Trip

Unit, Light did not Illuminate

07/27/2019

CR-PLP-2019-

2910

During the CRD-40 Forced Outage Mode 3 Walkdown, Boric

Acid Buildup was Identified on CV-1059, Pressurizer Spray

Valve from Loop 2A

07/28/2019

CR-PLP-2019-

2912

During the CRD-23 Forced Outage Mode 3 Walkdown, Boric

Acid Buildup and Identified on MO-3049, Safety Injection

07/28/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Tank 82C Outlet

CR-PLP-2019-

2918

During CRD-40 Forced Outage Mode 3 Walkdown a Packing

Leak was Discovered on CV-1057, Pressurizer Spray Valve

from Loop 1B

07/28/2019

CR-PLP-2019-

2941

Mode 4 to Mode 3 Hole, CV-0501, Main Steam Isolation

Valve (MSIV)

07/28/2019

CR-PLP-2019-

2992

Engineering Identified that Boric Acid Residue is Still Present

at CRD Leak-Off Connections for CRDs 15 and 18

07/30/2019

CR-PLP-2019-

03024

Received Alarm EK-0954 Rod Drive Seal Leak Off High

Temperature, Unexpectedly on 2 Occasions Within a Few

Minutes

07/31/2019

CR-PLP-2019-

03039

Received Alarm EK-0954, Rod Drive Seal Leak Off High

Temperature Unexpectedly

08/01/2019

CR-PLP-2019-

03065

PIA-1066, Primary Coolant System Reactor Head Vent, Prior

to the Forced Outage was Reading 2050 PSIG

08/05/2019

Corrective Action

Documents

Resulting from

Inspection

CR-PLP-2019-

2989

NRC Identifed a Cable for Control Rod Drive 33 has its

Raychem Pulled out of the Junction Box such that Cables

Inside are Exposed

07/30/2019

CR-PLP-2019-

2990

NRC Identified that the Thermocouple for Control Rod Drive

has its Conduit Pulled out of a Fitting such that the 2

Wires are Visible

07/30/2019

CR-PLP-2019-

2991

NRC Identified the Conduit for the Thermocouple for Control

Rod Drive 8 was not Secured in the Support Bracket

07/30/2019

Procedures

GOP-14

Shutdown Cooling Operations

GOP-5

Power Escalation in Mode 1

Work Orders

WO 528903 01

RSPT-33 Raychem Pulled Out of Junction Box

07/30/2019

71111.22

Corrective Action

Documents

CR-PLP-2019-

2596

Rod Drive Seal Leak Off High Temperature During RO-146A

CCW Pump In-Service Testing

07/02/2019

CR-PLP-2019-

2941

SV-0505A, Solenoid for 'B' S/G MSIV (CV-0501), was

Sluggish

07/28/2019

CR-PLP-2019-

03507

CV-0736A, P-8C Flow Control to E-50B and CV-0737A P-8C

Flow Control to E-50A not Being Stroked Timed During the

Performance of QO-5 on 8/29/19

09/06/2019

Procedures

DWO-1

Operator's Daily/Weekly Items Modes 1,2,3, and 4

108

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

QO-37 Basis

Main Steam Isolation and Bypass Valve Testing

RI-3A

High Pressurizer Pressure Channel Calibration

9A

RO-146

Comprehensive Pump Test Procedure - Component Cooling

Water Pumps P-52A, P-52B and P-52C

SEP-PLP-IST-

101

Inservice Testing of Plant Valves

Work Orders

WO 480329 01

RO-146, P-52A, IST CCW Pump Comprehensive

06/17/2019

WO 52853233

QO-37 - Main Steam Isolation an Bypass Valve Testing

07/28/2019

WO 52868659 01

DWO-1 - OPS IST Line Supervisor Review DWO-1

06/17/2019

71114.02

Corrective Action

Documents

CR-PLP-2017-

258

Siren 45 Intermittent Communication Failures

07/07/2017

CR-PLP-2017-

04162

Siren 22 Test Failure

09/09/2017

CR-PLP-2018-

2778

Siren 55 Test Failure

06/09/2018

CR-PLP-2018-

04978

Sirens 57 and 61 on DC Power Since 10/22/2018

10/25/2018

CR-PLP-2019-

00582

Siren 62 Battery Failure

2/07/2019

Miscellaneous

Federal Emergency Management Agency Letter - Subject:

Palisades Nuclear Plant Public ANS Approval

2/20/2002

Federal Emergency Management Agency Letter; Provisions

for Backup Alert and Notification (ANS) for the Palisades

Nuclear Power Plant Emergency Planning Zone (EPZ)

2/10/2012

Palisade Nuclear Plant Public Warning System Replacement

Project Design Report

10/01/2002

2019 Emergency Preparedness Public Information Calendar

Operability

Evaluations

Documentation of Public Warning System (PWS) Monthly

Tests

07/2017 -

06/2019

Procedures

PAL PWS

Palisades Nuclear Plant Public Warning System Operating

Procedure

71114.03

Corrective Action

Documents

CR-PLP-2018-

2713

Off Hours Mobilization Drill - Gold Team Ops Coordinator

Response

06/05/2018

CR-PLP-2018-

Off Hours Mobilization Drill - Gold Team Mechanical

06/05/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2715

Coordinator Response

CR-PLP-2018-

03136

ERO Red Team - TSC Manager Expired Qualification

07/02/2018

CR-PLP-2018-

236

ERO Performance Negative Trend

07/11/2018

CR-PLP-2018-

03797

ERO Member Response Failure - 8/16/18 ERO Test

08/20/2018

Miscellaneous

Current ERO Team Staffing Roster

05/31/2019

Palisades Nuclear Station On-Shift Staffing Analysis Final

Report

Emergency Response Organization Off-hours,

Unannounced, Augmentation Response Test Records

07/2017 -

06/2019

Procedures

EI-2.2

Emergency Staff Augmentation

EN-EP 310

Emergency Response Organization Notification System

EN-TQ-110

Emergency Response Organization Training

71114.05

Corrective Action

Documents

CR-PLP-2017-

03900

Controller/Evaluators did not Complete Required CBT

08/22/2017

CR-PLP-2017-

05122

Drill Objective E.1 Graded as Needs Improvement

11/07/2017

CR-PLP-2017-

05691

Potassium Iodide Briefing Inefficiently Performed During

ERO Drill

2/13/2017

CR-PLP-2018-

2031

Event Notification Form Errors During April 24, 2018 EP

Exercise

04/26/2018

CR-PLP-2019-

01531

Control Room Operators Failed to Fulfill KI Issuance

Procedures

04/16/2019

CR-PLP-2019-

01533

Exercise SAE Notification Failure

04/16/2019

CR-PLP-2019-

01534

EP Exercise - ERO Failure to Determine Status of Rad

Release

04/16/2019

CR-PLP-2019-

01538

EP Exercise - Insufficient Command and Control Hindered

Performance

04/16/2019

Corrective Action

Documents

Resulting from

CR-HQN-2019-

01499

NRC Inspection - Electronic Notification System Issue

Identified

07/11/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

Miscellaneous

Quarterly Emergency Communications Test Records

07/2018 -

06/2019

Monthly Communications Test Records

07/2018 -

06/2019

After Action Drill Report/Improvement Plan - April 11, 2018

ERO Blue Team Drill

05/10/2018

After Action Drill Report/Improvement Plan - April 24, 2018

ERO Blue Team Drill

05/23/2018

After Action Drill Report/Improvement Plan - June 6, 2018

ERO Gold Team Drill

06/29/2018

After Action Drill Report/Improvement Plan - September 5,

2018 ERO Red Team Drill

01/15/2019

After Action Drill Report/Improvement Plan - April 10, 2019

ERO Blue Team Drill

05/08/2019

KLD TR - 1020

Palisades Power Plant 2018 Population Update Analysis

09/19/2018

Procedures

EN-LI-102

Corrective Action Process

SEP

Palisades Nuclear Plant Site Emergency Plan

SEP Supplement

EAL Wall Chart

SEP Supplement

Evacuation Time Estimate

Self-Assessments QA-7-2018-PLP-1 Quality Assurance Audit Report - Emergency Preparedness

[10CFR50.54(t)]

05/31/2018

QA-7-2019-PLP-1 Quality Assurance Audit - Emergency Preparedness

[10CFR50.54(t)]

05/29/2019

71114.06

Corrective Action

Documents

CR-PLP-2019-

03107

Discovered During EP Exercise that Cellular Phone is Non-

Operational, Phone Battery Leaking

08/07/2019

CR-PLP-2019-

03114

While Performing Kit #5 Inventory for Emergency Vehicle

(GMC Van) if was Discovered that the Portable Batter

Charger was not Operational

08/07/2019

Miscellaneous

Emergency Preparedness Full Scale Drill

08/07/2019

71151

Miscellaneous

Emergency Response Organization Drill Participation

01/01/2018 -

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Performance Indicator Records

03/31/2019

Drill and Exercise Performance (DEP) Performance Indicator

Records

01/01/2018 -

03/31/2019

Alert Notification System Performance Indicator Records

01/01/2018 -

03/31/19

MSPI Derivation

Documents for

July 1, 2018

through June 30,

2019

MSPI Derivation Documents

07/01/2018 -

06/30/2019

71152

Corrective Action

Documents

WT-WTPLP-

2018-00403

Develop a Plan to Address the Identified Issues

10/09/2018

Self-Assessments

Palisades Security April 2019 Performance Summary

Palisades Security July 2019 Performance Summary

25