IR 05000255/2022001

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000255/2022001
ML22131A366
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/13/2022
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Corbin D
Entergy Nuclear Operations
References
IR 2022001
Download: ML22131A366 (14)


Text

SUBJECT:

PALISADES NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000255/2022001

Dear Mr. Corbin:

On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palisades Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects Docket No. 05000255 License No. DPR-20

Enclosure:

As stated

Inspection Report

Docket Number:

05000255

License Number:

DPR-20

Report Number:

05000255/2022001

Enterprise Identifier:

I-2022-001-0065

Licensee:

Entergy Nuclear Operations, Inc.

Facility:

Palisades Nuclear Plant

Location:

Covert, MI

Inspection Dates:

January 01, 2022 to March 31, 2022

Inspectors:

J. Havertape, Reliability and Risk Analyst

P. Laflamme, Senior Resident Inspector

J. Mancuso, Acting Senior Resident Inspector

C. St. Peters, Resident Inspector

Approved By:

Billy C. Dickson, Jr., Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palisades Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The plant began the inspection period at full power and remained at or near full power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk significant systems from impending severe weather during a winter storm warning with predicted heavy snow on February 1, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Component cooling water (CCW) right train on January 3 and 4, 2022
(2) Emergency diesel generator (EDG) 1-1 on January 18 and 19, 2022
(3) Auxiliary feedwater (AFW) right train on February 4 through 9, 2022
(4) Service water system right train on March 2 through March 23, 2022.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the left train service water system on March 3 through March 23, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Area 26: Southwest Cable Penetration, elev. 590' and 607', on January 5-6, 2022
(2) Fire Area 9: Screenhouse/ Intake Structure, elev. 590', on January 3-4, 2022
(3) Fire Area 4: 1C 2.4KV Switchgear Room, elev. 590', on January 14, 2022
(4) Fire Area 5 & 7: 1-1 Diesel Generator and Fuel Oil Day Tank Rooms, elev. 590', on January 19, 2022
(5) Fire Area 24: Auxiliary Feedwater Pump Room, elev. 571' on January 31, 2022

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during a downpower to support planned AFW testing on February 15, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated SES-410 Rev.1 "LOR Simulator Exam Scenario" on February 1, 2022.
(2) The inspectors observed and evaluated PSLEG-LOR-21F-07 "SM Choice" on February 17, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Service Water System on January 11, 2022
(2) Control Rod Drive System on January 6, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Elevated risk due to RR-9K main steam line calibration, on January 13, 2022
(2) Protected equipment walkdown due to maintenance risk for 1-1 EDG out of service for scheduled maintenance, on February 7, 2022
(3) Yellow risk due to QO-1 and M-1005 "SUPPLEMENT DIESEL GENERATOR 1-3" out of service, on March 16, 2022
(4) Emergent work related to A main feed pump gland seal steam leak, on March 21, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Plant Process Computer evaluation on January 24, 2022
(2) Evaluation of an incorrect indication during valve stroke for CWRT recirculation pump on February 28, 2022 (3)1-1 EDG fuel line support stud failure past operability evaluation on March 7, 2022

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change (EC) 76688: Engineering Safeguards Cooler Fan Modification on January 7, 2022
(2) Service water supply to fire protection system modification with jockey pump removed from service on February 9, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) SOP-22 run of the 1-2 EDG following replacement of the fuel oil relief RV-1486, on January 18, 2022
(2) QO-15 run of CCW pump P-52B following planned maintenance, on January 26, 2022
(3) MO-7A-1 run of the 1-1 EDG following planned maintenance, on February 7, 2022
(4) SOP-22 run of the 1-1 EDG following emergent work, on February 8, 2022
(5) Plant Process Computer card replacement on March 22, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (6 Samples)

(1) QO-15A; P-52A CCW Pump ISI test, on January 7, 2022
(2) QO-14B; Service Water Pump P-7B test, on January 21, 2022
(3) QO-21C; P-8C AFW pump test, on January 24, 2022
(4) QO-5; Valve Test Procedure on February 15, 2022
(5) QO-21B; P-8B AFW Pump Test on February 16, 2022
(6) MO-7A-1; Monthly EDG 1-1 run, on March 18, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) QO-19B P-66B HPSI and Engineered Safety Systems check valve operability inservice test, on January 20, 2022

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) Phase 1 training drill on March 2,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2021 - December 31, 2021)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) Unit 1 (January 1, 2021 - December 31, 2021)

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) Unit 1 (January 1, 2021 - December 31, 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 31, 2022, the inspectors presented the integrated inspection results to Mr. D. Corbin, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AOP-38

Acts of Nature

71111.01

Procedures

EN-FAP-EP-010

Severe Weather Response

Corrective Action

Documents

Resulting from

Inspection

CR-PLP-2018-

2315

NRC Questioned Presence of Water Coming Out of Conduit

in the NW Corner of EESG Room Near the Sump Pumps

05/04/2018

M-209, Sheet 2

Piping and Instrument Diagram - Component Cooling

System

Drawings

M-209, Sheet 3

Piping and Instrument Diagram - Component Cooling

System

Miscellaneous

DBD-1.02

Design Basis Document for Service Water System

SOP-12

14, Checklist 12.5, Auxiliary Feedwater System

Checklist (Except K-8 Steam Supply)

SOP-15

Service Water System

SOP-16

2, Checklist 16, Component Cooling System

Checklist

71111.04

Procedures

SOP-22,

Diesel Generators System Checklist

CR-PLP-2022-

00007

Union Upstream of MV-FO703 Diesel Fire Pump P-41FO

Inlet has Evidence of Fuel Oil Leakage

01/03/2022

Corrective Action

Documents

CR-PLP-2022-

00009

Difference in Levels of Fuel Oil Present in Fuel Oil Filters for

Two Diesel Fire Pumps, P-9B and P-41

01/03/2022

Pre-Fire Plan 24

Auxiliary Feedwater Pumps Room / Elevation 571'

Pre-Fire Plan 26

Southwest Cable Penetration Room, Elevation 590' and 607'

Pre-Fire Plan 4,

34, 35, & 36

1-C Switchgear Room and Manhole 1, 2, & 3, Elevation 590',

Rooms 116A, 190, 191, & 192

Pre-Fire Plan 9

Screen House/Intake Structure, Rooms 136 and 136A,

Elevation 590'

Fire Plans

Pre-Fire Plans 5

& 7

Diesel Generator 1-1 and Fuel Oil Day Tank Room,

Elevation 590', Rooms 116 & 146

71111.05

Miscellaneous

Fire Drill Scenario

2-002

Announced Drill: 590' Turbine Truck Bay

03/17/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

AOP Supplement

Fire Response Strategies, Fire Zone 26

PSLEG-LOR-

21F-07

SM Choice

2/17/2022

71111.11Q

Procedures

SES-410

LOR Simulator Exam Scenario

CR-PLP-2019-

2860

CRD-23, Control Rod Drive Mechanism

07/24/2019

CR-PLP-2019-

2861

CRD-14, Control Rod Drive Mechanism

07/24/2019

CR-PLP-2019-

04616

CRD-33 Secondary Position Indication (SPI)

11/20/2019

CR-PLP-2020-

04174

Control Rod Drive No. 3 Maintenance Rule Evaluation

11/05/2020

CR-PLP-2020-

275

Maintenance Rule Evaluation for Control Rod Drive No. 2

11/05/2020

Corrective Action

Documents

CR-PLP-2022-

238

Maintenance Rule Evaluation for the 2021 Condition of

CRD-23

2/01/2022

PLP-RPT-12-

00026

Maintenance Rule Scoping Document - Non-Critical Service

Water

Engineering

Evaluations

PLP-RPT-12-

00026

Maintenance Rule Scoping Document - Critical Service

Water

PLP-RPT-12-

00026,

CRD Maintenance Rule Scoping Document

System Health

Report

Control Rod Drive System

04/01/2020 -

06/30/2020

System Health

Report

Control Rod Drive System

10/01/2019 -

2/31/2019

System Health

Report

Control Rod Drive System

04/01/2021 -

06/30/2021

System Health

Report

Control Rod Drive System

10/01/2020 -

2/31/2020

71111.12

Miscellaneous

System Health

Report

PLP, Unit 1, CSW - Critical Service Water

04/01/2021 -

06/30/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

System Health

Report

PLP, Unit 1, CSW - Critical Service Water

10/01/2020 -

2/31/2020

System Health

Report

PLP, Unit 1, CSW - Critical Service Water

04/01/2020 -

06/30/2020

System Health

Report

PLP, Unit 1, UHS - Ultimate Heat Sink

04/01/2021 -

06/30/2021

System Health

Report

PLP, Unit 1, UHS - Ultimate Heat Sink

10/01/2020 -

2/31/2020

System Health

Report

PLP, Unit 1, UHS - Ultimate Heat Sink

04/01/2020 -

06/30/2020

EN-MA-157

Maintenance Configuration Control

08/31/2020

MSE-E-12

Permanent Maintenance Procedure Cable Terminations

Procedures

WI-SPS-E-02

Insulation Resistance Testing of Electrical Equipment

10/18/2020

Work Orders

00533513-05

CRDM Fan V-49A Tripped, Electrical Post-Maintenance Test

10/18/2020

Procedures

SOP-12

Feedwater System

2935792-01

RR-9K-Mainsteam Line Monitor RIA-2323 & RIA-2324

Calibration

01/13/2022

71111.13

Work Orders

2991330-01

QO-1 Safety Injection Actuation System Test

03/16/2022

CR-PLP-2003-

08105

Bolt Found Sheered Off on Emergency Diesel Generator 1-1

2/07/2003

CR-PLP-2016-

00572

During the Performance of WO-52521845-01, K-6A 4 Cycle

Auxiliary System Maintenance, One of the Two Cylinder 2L

Fuel Tube-to-Head Clamping Studs Yield Before Torque was

Achieved

2/02/2016

CR-PLP-2022-

00097

Multiple Points on MC-1000, Palisades Plant Computer

System (PPC) went Invalid for 1 Minute and 6 Seconds

2/15/2022

CR-PLP-2022-

00154

PPC was Lost and Data on the PPC Went Invalid

01/22/2022

CR-PLP-2022-

00158

Multiple PPC Points Were Identified to Spike Simultaneously

01/23/2022

CR-PLP-2022-

283

After K-6A, Emergency Diesel Generator 1-1 was Secured

Following a MO-7A-1 Diesel Run, NPOs Found a Sheared

Stud on the Ground

2/07/2022

71111.15

Corrective Action

Documents

CR-PLP-2022-

EK-3327 SOE Node Trouble

2/12/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

00312

CR-PLP-2022-

00336

MC-1000-SPI, Secondary Computer Alarm EK-0971

2/16/2022

CR-PLP-2022-

00365

Some of the Main Turbine/Generator/Exciter Inputs to the

PPC Went Invalid

2/19/2022

CR-PLP-2022-

00371

Noticed HB_PWR_STEADY on PPC Momentarily go Invalid

2/20/2022

CR-PLP-2022-

00418

Incorrect Indication During Valve Stroke for CWRT Recirc

Pump

2/28/2022

CR-PLP-2022-

00478

There was a Temporary Loss of Some PPC Indications and

the CTCS System Rebooted

03/09/2022

DBD-2.05

Reactor Protective System Safety Injection Signal

Anticipated Transient Without SCRAM

Miscellaneous

DBD-2.06

Control Rod Drive System (CRD)

Operability

Evaluations

CR-PLP-2022-

283

Past Operability Evaluation in Accordance with EN-LI-108

03/10/2022

EN-OP-104

Operability Determination Process

Procedures

SOP-34,

PPC Operability Check

CR-PLP-2021-

2828

As Found Wiring Did Not Match the Wiring Drawing

E0007-SH-77

11/03/2021

Corrective Action

Documents

CR-PLP-2022-

00316

Service Water Booster Pump P-25B Discharge

2/14/2022

E-279

Schematic Diagram, Engineered Safeguards Room Coolers

M-213

Piping & Instrument Diagram Service Water, Screen

Structure and Chlorinator

M-216

Piping & Instrument Diagram Fire Protection System

Drawings

VEN-E7, Sheet

Wiring Diagram; MCC 1 52-133 Engineered Safeguards

Room Cooler V27C

EC 27518

Base EC to Replace MCC Breaker Buckets on

MCC 1, 2, 7, 8

Engineering

Changes

EC 82175

Correction of DWG E-279 Error as Described in

CR-PLP-2018-03823

03/25/2019

71111.18

Miscellaneous

DBD-1.02

Design Basis Document for Service Water System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Field Change

Request Number

91577

Correct Latent Drawing Error on E0077 Reference

CR-PLP-2021-02828

FSAR 9.6.2.3

FSAR Chapter 9 Auxiliary Systems System Operation

EN-DC-115-01

Industry Standard Design Process

EN-DC-136

Temporary Modifications

EN-MA-157

Maintenance Configuration Control

11/05/2021

MSE-E-12

Terminal Lug/Connector Installation Data Sheet

11/03/2021

SOP-21

Fire Protection System

SOP-21

Supply Fire Header Pressure with Service Water Booster

Pump

Procedures

SPS-E-11

480 Volt Breaker Inspection and Repair

11/03/2021

Work Orders

500202-04

V-27C Engineering Safeguards Room Cooler Fan

11/02/2021

CR-PLP-2022-

213

Plant Process Computer Automatic Reboot

01/29/2022

CR-PLP-2022-

241

EK-0971 SPI Trouble Alarms

2/01/2022

CR-PLP-2022-

288

Processor Card Would Not Communicate with the PPC

2/08/2022

Corrective Action

Documents

CR-PLP-2022-

00302

Received EK-0971, SPI Trouble, Unexpectedly

2/10/2022

SOP-22

Diesel Generator Log Sheet

Procedures

SOP-22,

Diesel Generator Log Sheet

00550301-01

K-6A; Replace Dirty Air Filters - VLC

2/07/2022

00550301-02

K-6A, Air Intake Filter; PMT (Ops): Replace Element

2/07/2022

00566208-01

F-91; Oil Leak from Filter Lid at Start of Run

2/07/2022

00566208-02

F-91; Lid Leaking - (Ops) PMT

2/07/2022

00567101-01

P-52B; Replace Inboard (Coupling End) Oiler

01/26/2022

00570091-01

RV-1486; Replace Valve

01/08/2022

00570091-02

RV-1486; PMT

01/07/2022

71111.19

Work Orders

00570091-03

RV-1486; Adjust Fuel Oil Relief Valve

01/08/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2939019-01

EEQ Maintenance - Component Cooling, EMA-1208, P52B

Motor

01/26/2022

2939019-02

EEQ Maintenance - Component Cooling, EMA-1208, P-52B

Motor PMT

01/26/2022

2979625-02

P-52B, PMT (Ops): Pump Bearing Oil Change (OPS553)

01/26/2022

2988018-01

QO-15B, Inservice Test Procedure - Component Cooling

Pump P-52B

01/26/2022

2988475-01

MO-7A-1X-D/G 1-1 Emergency Diesel Generator Fuel Oil

Transfer Test

2/07/2022

546447-02

P/S-MC1000-01; Field Adjust Power Supply Voltage

2/17/2021

573330-01

MC-001C, J-451-A2 (MX01-16) Instrumentation and Control

01/26/2022

573330-06

MC-1000, PPC, Changing Time for PPC Node

2/14/2022

574259-01

K-6A, 1-1 EDG; Repair Broken Bolt

2/08/2022

MO-7A-1

Emergency Diesel Generator 1-1

104

QO-14

Inservice Test Procedure - Service Water Pumps

Procedures

QO-19

Inservice Test Procedure - HPSI Pumps and ESS Check

Valve Operability Test

2986174-01

QO-15A-P-52A ISI Test Procedure - Component Cooling

Pump

01/06/2022

2986893-01

QO-14B-P7B, IST Service Water Pump

01/11/2022

2987814-01

QO-21C -P-8C, Auxiliary Feedwater Pump Inservice Test

01/24/2022

2989054-01

QO-21B-P-8B, IST Auxiliary Feedwater System

2/15/2022

71111.22

Work Orders

2990893-01

QO-5 - Valve Test Procedure (Including Containment

Isolation Valves)

2/15/2022

NRC Performance Indicators Unplanned Scrams with

Complications (IE-04)

01/01/2021-

2/31/2021

NRC Performance Indicators Unplanned Scrams per

7,000 Critical Hours (IE-01)

01/01/2021 -

2/31/2021

71151

Miscellaneous

NRC Performance Indicators Mitigating Systems

Performance Indicator Heat Removal Systems (AFW)

(MS-08)

01/01/2021 -

2/31/2021