IR 05000254/2020401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401
ML20083H620
Person / Time
Site: Palisades, Quad Cities  Constellation icon.png
Issue date: 03/23/2020
From: Steven Orth
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co
References
IR 2020401
Download: ML20083H620 (7)


Text

March 23, 2020

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000254/2020401 AND 05000265/2020401

Dear Mr. Hanson:

On February 7, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Mr. Ken Ohr, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000254 and 05000265 License Nos. DPR-29 and DPR-30

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000254 and 05000265

License Numbers:

DPR-29 and DPR-30

Report Numbers:

05000254/2020401 and 05000265/2020401

Enterprise Identifier: I-2020-401-0060

Licensee:

Exelon Generation Company, LLC

Facility:

Quad Cities Nuclear Power Station

Location:

Cordova, IL; Warrenville, IL

Inspection Dates:

January 14, 2020 to February 7, 2020

Inspectors:

A. Anderson, Physical Security Inspector

E. Bonano, Physical Security Inspector

J. Kutlesa, Physical Security Inspector

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Quad Cities Nuclear Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

Access Control (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a - d; 02.07 a; 02.08 a, b, d
  • Tier III: 02.09

71130.08 - Fitness For Duty Program

Fitness For Duty Program (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 02.05 a - l; 02.06 a - g; 02.07 a - e; 02.08 a, b; 02.09 a - e
  • Tier III: 02.10; 02.11 a; 02.12 a; 02.13 a - e; 02.14 a - c

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 7, 2020, the inspectors presented the security baseline inspection results to Mr. Ken Ohr, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

SY-AA-101-103

Observation And Inspection Of Security Barriers

SY-AA-101-106

Control And Classification Of Safeguards Information (SGI)

And Sensitive Unclassified Non-Safeguards Information

(SUNSI)

SY-AA-101-112

Exelon Security Search Processes

SY-AA-101-112-

1004

Protected Area Search Processes

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

SY-AA-101-117

Processing And Escorting Of Personnel And Vehicles

SY-AA-101-120

Control Of Security Access Control Devices

SY-AA-101-132-

F-02

Two-Person Line Of Sight Implementation Checklist

SY-QC-101-1009

Vehicle Key Control

SY-QC-101-410

OCA Warehouse Search Activities

Self-Assessments NOSA-QDC-18-

(AR 4091367)

Security Programs Audit Report

Quad Cities Station

January 22 to January 26, 2018

01/30/2018

NOSA-QDC-19-

(AR 4209519)

Security Programs Audit Report

Quad Cities Station

January 28 to February 1, 2019

2/06/2019

NOSA-QDC-20-

(AR 4308330)

Security Programs Audit

Exit Meeting Handout

Quad Cities Station

January 21 to January 31, 2020

71130.08

Miscellaneous

Exelon Industrial / Nuclear Safety And Security

Nantel Generic Fitness-For-Duty And Behavior Observation

Content Document

06/08/2017

Procedures

LS-AA-119

Fatigue Management And Work Hour Limits

SY-AA-101-130

Security Responsibilities For Station Personnel

SY-AA-101-145

Security Standards Of Conduct

SY-AA-102

Exelon Generation Fitness For Duty Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SY-AA-102-202

Testing For Cause

SY-AA-102-204

Random Selection And Notification Process

SY-AA-102-222

Handling And Storage Of Fitness For Duty Records

SY-AA-102-242

Breath Alcohol Testing

Self-Assessments AR 04275521

Security Pre-NRC Self-Assessment For AC/FFD

2/02/2019