ML20342A181
| ML20342A181 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 12/10/2020 |
| From: | Steve Ruffin Security Performance Evaluation Branch |
| To: | Corbin D Entergy Nuclear Operations |
| Berry J | |
| Shared Package | |
| ML20342A186 | List: |
| References | |
| IR 2020420 | |
| Download: ML20342A181 (2) | |
See also: IR 05000255/2020420
Text
December 10, 2020
Mr. Darrell Corbin
Vice President, Operations
Entergy Nuclear Operations, Inc.
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT -INSPECTION REPORT 05000255/2020420
Dear Mr. Corbin:
On November 9, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at Palisades Nuclear Plant and discussed the results of this inspection with you and
other members of your staff. The results of this inspection are documented in the enclosed
report.
No findings or violations of more than minor significance were identified during this inspection.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steve R. Ruffin, Acting Chief
Security Performance Evaluation Branch
Division of Security Operations
Docket No. 05000255
License No. DPR-20
Enclosure:
Inspection Report 05000255
cc: Mr. Jason Tharp, Manager, Site Security
Jtharp@energy.com
Pkg. ML20342A186, Cover letter ML20342A181
Report ML20342A87
OFFICE
NSIR/DSO/SPEB NSIR/DSO/SPEB RIII
NSIR/DSO/SPEB
NAME
E. BYRE
J. BERRY
N.EGAN
S.RUFFIN
DATE
11/30/2020
12/7/2020
12/1/2020
12/10/2020