Category:Inspection Plan
MONTHYEARIR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) ML21327A2962021-11-23023 November 2021 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2022010 ML21278A4442021-10-0505 October 2021 Notification of NRC Fire Protection Team Inspection Request for Information Inspection Report 05000255/2021010 ML21274A4172021-10-0505 October 2021 Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information Inspection Report 05000255/2021004 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) ML20205L6282020-07-23023 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000255/2020003 ML20133K0562020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8712020-05-0606 May 2020 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Palisades Nuclear Plant IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190052019-08-28028 August 2019 Updated Inspection Plan for Palisades Nuclear Plant, Unit 1 (Report 05000255/2019005) ML19227A0652019-08-14014 August 2019 Inspection Plan for Palisades Nuclear Plant for Design Bases Assurance Inspection (Programs); Inspection Report 05000255/2019010 (DRS-N.FelizAdorno) IR 05000255/20180062019-03-0404 March 2019 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2018006) ML19056A1132019-02-25025 February 2019 Request for Information Design Bases Assurance Inspection (Program); NRC Inspection Report 05000255/2019010 (DRS-N. Feliz-Adorno) IR 05000255/20180052018-08-28028 August 2018 Updated Inspection Plan for Palisades (Report 05000255/2018005) IR 05000255/20170062018-03-0202 March 2018 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2017006) ML18047A7112018-02-16016 February 2018 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (DRS-R.Baker) ML17304A4822017-10-31031 October 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Palisades IR 05000255/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000255/2017005) IR 05000255/20160062017-03-0101 March 2017 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2016006) IR 05000255/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Palisades Nuclear Plant (Report 05000255/2016005) ML16174A4132016-06-22022 June 2016 Information Request to Support Upcoming Temporary Instruction 191 Inspection at Palisades Nuclear Plant ML16125A5332016-05-0303 May 2016 Ltr. 05/03/16 Palisades Nuclear Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) IR 05000255/20150062016-03-0202 March 2016 Annual Assessment Letter for Palisades Nuclear Plant (Inspection Report 05000255/2015006) ML16057A1212016-02-25025 February 2016 Ltr. 02/25/16 Palisades Nuclear Plant - Information Request for and NRC Triennial Permanent Modifications and 10 CFR 50.59 (MOD/50.59) Baseline Inspection 05000255/2016007 ML16019A4602016-01-19019 January 2016 Information Request to Support Upcoming Problem Identification and Resolution Inspection at the Palisades Nuclear Plant IR 05000255/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Palisades Nuclear Plant (Report 05000255/2015005) ML15240A3442015-08-28028 August 2015 Ltr. 08/28/15 Palisades Nuclear Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000255/2015004 (Axd) ML15211A5242015-07-30030 July 2015 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000255/20154032015-06-18018 June 2015 Information Request for Temporary Instruction 2201/004 Inspection, Notification to Perform Inspecting of Implementation of Interim Cyber Security Milestones 1-7, 05000255/2015403 ML15124A9272015-05-0101 May 2015 Ltr. 05/01/15 Palisades Nuclear Plant - Notification of NRC Inspection and Request for Information (Msh) IR 05000255/20140012015-03-0404 March 2015 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2014001) ML15013A4812015-01-12012 January 2015 15 Palisades Fire Protection Request for Information ML14245A2982014-09-0202 September 2014 Mid-Cycle Assessment Letter for Palisades Nuclear Plant ML14063A2762014-03-0404 March 2014 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/3013001) IR 05000255/20301302014-03-0404 March 2014 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/3013001) ML13337A6552013-12-0303 December 2013 Ltr 12/3/13 Palisades Fire Protection Request for Information ML13246A2482013-09-0303 September 2013 2013 Palisades Nuclear Plant 2013 Mid-Cycle Letter Combined IR 05000255/20120012013-03-0404 March 2013 Annual Assessment Letter for Palisades Nuclear Plant (IR 05000255-12-001) ML12248A3182012-09-0404 September 2012 Mid-Cycle Assessment Letter for Palisades Nuclear Plant IR 05000255/20110072012-03-0505 March 2012 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2011007) IR 05000255/20110062011-09-0101 September 2011 Mid-Cycle Letter for Palisades Nuclear Plant, 05000255-11-006 ML1106206252011-03-0404 March 2011 EOC Annual Assessment Letter and Inspection/Security Plan ML1024402002010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Palisades Nuclear Power Plant ML1006102742010-03-0303 March 2010 EOC Annual Assessment Letter, Inspection/Activity Plan ML0924403762009-09-0101 September 2009 Palisades - Mid-Cycle Performance Review and Inspection Plan IR 05000255/20090012009-03-0404 March 2009 Annual Assessment Letter - Palisades Nuclear Plant (5000255/2009001) ML0824602962008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan IR 05000255/20080012008-03-0303 March 2008 Palisades, EOC Annual Assessment Letter (Report 05000255/2008001) 2022-03-02
[Table view] Category:Inspection Report
MONTHYEARIR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 IR 05000255/20220022022-08-0303 August 2022 Integrated Inspection Report 05000255/2022002 IR 05000255/20220012022-05-13013 May 2022 Integrated Inspection Report 05000255/2022001 IR 05000255/20220102022-04-0101 April 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2022010 IR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) IR 05000255/20210102022-02-24024 February 2022 Triennial Fire Protection Inspection Report 05000255/2021010 IR 05000255/20210042022-02-0808 February 2022 Integrated Inspection Report 05000255/2021004 and Exercise of Enforcement Discretion IR 05000255/20214042021-11-15015 November 2021 NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000255/2021404 and 07200007/2021401 IR 05000255/20210032021-11-0303 November 2021 Integrated Inspection Report 05000255/2021003 IR 05000255/20214032021-10-21021 October 2021 Material Control and Accounting Program Inspection Report 05000255/2021403 IR 05000255/20214022021-10-0606 October 2021 Security Baseline Inspection Report 05000255/2021402 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20210022021-08-10010 August 2021 Integrated Inspection Report 05000255/2021002 ML21197A0322021-07-21021 July 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000255/20210012021-05-12012 May 2021 Integrated Inspection Report 05000255/2021001 IR 05000255/20214012021-04-14014 April 2021 Security Baseline Inspection Report 05000255/2021401 IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200042021-02-11011 February 2021 Integrated Inspection Report 05000255/2020004 IR 05000255/20204012021-01-0606 January 2021 Security Baseline Inspection Report 05000255/2020401 ML20342A1812020-12-10010 December 2020 Security Inspection Report Cover Letter 05000255/2020420 IR 05000255/20204202020-12-10010 December 2020 Security Inspection Report 05000255/2020420 IR 05000255/20204022020-11-30030 November 2020 Cyber Security Inspection Report 05000255/2020402 IR 05000255/20205012020-11-20020 November 2020 Emergency Preparedness Inspection Report 05000255/2020501 IR 05000255/20200032020-11-13013 November 2020 Integrated Inspection Report 05000255/2020003 IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) IR 05000255/20200102020-08-24024 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000255/2020010 IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 IR 05000255/20200022020-08-11011 August 2020 Integrated Inspection Report 05000255/2020002 and Exercise of Enforcement Discretion IR 05000255/20010082020-05-12012 May 2020 Final ASP Analysis - Palisades (IR 050002552001008) IR 05000255/20200012020-05-12012 May 2020 Integrated Inspection Report 05000255/2020001 IR 05000255/20200112020-04-21021 April 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000255/2020011 IR 05000254/20204012020-03-23023 March 2020 Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401 IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190042020-01-28028 January 2020 Integrated Inspection Report 05000255/2019004 and 07200007/2019001 ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 IR 05000255/20190112019-11-27027 November 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2019011 IR 05000255/20194112019-11-25025 November 2019 Security Baseline Inspection Report 05000255/2019411 and Independent Spent Fuel Storage Security Inspection Report 07200007/2019401 (Cover Letter Only) (DRS-M.Ziolkowski) IR 05000255/20190032019-11-14014 November 2019 Integrated Inspection Report 05000255/2019003 IR 05000255/20190102019-10-29029 October 2019 Reissue - Palisades Nuclear Plant - Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 ML19294A2872019-10-21021 October 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 IR 05000255/20190052019-08-28028 August 2019 Updated Inspection Plan for Palisades Nuclear Plant, Unit 1 (Report 05000255/2019005) ML19210D4022019-07-29029 July 2019 Ltr. 07/29/19 Palisades Nuclear Plant - Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2019011 (DRS-D.Szwarc) IR 05000255/20190022019-07-26026 July 2019 Integrated Inspection Report 05000255/2019002 IR 05000255/20194102019-06-0404 June 2019 NRC Security Baseline Inspection Report 05000255/2019410 (Cover Letter Only) (DRS-N.Egan) IR 05000255/20190012019-05-10010 May 2019 Errata - Palisades Nuclear Plant, Unit 1 - NRC Integrated Inspection Report 05000255/2019001 ML19123A1742019-05-0303 May 2019 NRC Integrated Inspection Report 05000255/2019001 IR 05000255/20150032019-04-11011 April 2019 Errata - Palisades Nuclear Plant, NRC Integrated Inspection Report 05000255/2015003 (DRS-K.Stoedter) 2023-07-19
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
ust 27, 2003
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN PALISADES NUCLEAR POWER PLANT (REPORT 50-255/04-01)
Dear Mr. Cooper:
On July 30, 2003, the NRC staff completed its mid-cycle plant performance assessment of the Palisades Nuclear Power Plant. The mid-cycle review for Palisades involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the first half of the current assessment cycle, January 1 -
December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional oversight (Green). However, the significance of a failure to take effective corrective actions to address a series of events involving digging and excavating between the protected area and the switchyard which resulted in a loss of offsite power and an Alert emergency declaration is still under review as part of the Significance Determination Process. Therefore, at this point, we plan to conduct only baseline inspections at your facility through September 30, 2004.
In our Annual Assessment Letter dated March 4, 2003, we discussed a substantive cross-cutting issue in the area of Problem Identification and Resolution. During the first two quarters of the 2003 assessment period, there continued to be examples where your corrective action program failed to promptly identify and correct conditions adverse to quality. Therefore, during the course of routine baseline inspection activities, the inspectors will closely monitor problem identification and resolution to more thoroughly assess this area at the 2003 end-of-cycle assessment.
The enclosed inspection plan details the inspections scheduled through September 30, 2004.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 6 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Eric Duncan at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Steve A. Reynolds acting for/
Geoffrey E. Grant, Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20 Enclosure: Palisades Inspection/Activity Plan See Attached Distribution