une 4, 2019

SUBJECT:

PALISADES NUCLEAR PLANT, UNIT 1NRC SECURITY BASELINE INSPECTION REPORT 05000255/2019410

Dear Mr. Arnone:

On April 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palisades Nuclear Plant, Unit 1. On April 24, 2019, the NRC inspector discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One NRC-identified finding of very-low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC resident inspector at Palisades Nuclear Plant.

One cross-cutting aspect was assigned to the above finding in the area of Human Performance - Procedure Adherence. Specifically, because your staff failed to follow processes, procedures, and work instructions. [H.8]

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC resident inspector at Palisades Nuclear Plant.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA Karla Stoedter Acting for/

Thomas C. Hartman, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 Enclosure:

Inspection Report 05000255/2019410 cc: D. Asselin, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV ML19155A301 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RIII RIII RIII NAME NEgan:jw via Email THartman KStoedter DATE 06/04/19 06/04/19 06/04/19