BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2021001 AND 05000455/2021001
 
==Dear Mr. Rhoades:==
On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On April 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. H. Welt, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
 
Hironori Peterson, Chief Branch 3 Division of Reactor Projects
 
Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers:
05000454 and 05000455
 
License Numbers:
NPF-37 and NPF-66
 
Report Numbers:
05000454/2021001 and 05000455/2021001
 
Enterprise Identifier: I-2021-001-0017
 
Licensee:
Exelon Generation Company, LLC
 
Facility:
Byron Station
 
Location:
Byron, IL
 
Inspection Dates:
January 01, 2021 to March 31, 2021
 
Inspectors:
D. Betancourt-Roldan, Senior Resident Inspector
 
C. Thompson, Illinois Emergency Management Agency
 
J. Weigandt, Resident Inspector
 
Approved By:
Hironori Peterson, Chief
Branch 3
Division of Reactor Projects
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=PLANT STATUS=
 
Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
 
Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
 
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from an impending winter storm on January 25 through January 26, 2021.
 
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
 
(1)1A safety injection (SI) prior to B test on February 10, 2021 (2)2B emergency diesel generator (EDG) during 2A semi-annual test as set forth in Work Order (WO) 5081391 on March 10, 2021 (3)2A EDG prior to 2B EDG work on March 22, 2021
 
Complete Walkdown Sample (IP Section 03.02) (1 Partial)
 
(1)
(Partial)
The inspectors evaluated system configurations during a complete walkdown of the Unit 2 auxiliary feedwater (AF) system on February 3 and March 26, 2021.
 
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Unit 1 Division 12 Miscellaneous Electrical Equipment Room (MEER) and Battery Room, Fire Zones (FZs) 5.4-2, 5.5-2, and 5.6-2 on March 10, 2021 (2)1B EDG Room, FZ 18.1-1 on March 4, 2021
: (3) Unit 2 Division MEER, FZ 5.4-2 on March 17, 2021
 
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on January 30, 2021.
 
==71111.07A - Heat Sink Performance==
===Annual Review (IP Section 03.01) (1 Sample)===
The inspectors evaluated readiness and performance of:
: (1) Component cooling heat exchanger tube plugging on February 16, 2021
 
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during implementation of Engineering Change (EC) 632575, Unit 1 "Tref" adjustment on March 3, 2021. The inspectors also observed operator performance in the Control Room during 0BOSR MP-1 max VAR testing under Work Order 5029908 on March 11, 2021.
 
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated a licensed operator training requalification scenario on February 15, 2021.
 
==71111.12 - Maintenance Effectiveness==
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Issues with Unit 2 power oscillations as documented in Action Request (AR) 04396745 on January 25, 2021
: (2) Control Room heating ventilation and air conditioning (VC) system on February 10, 2021
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
 
(1)1B residual heat removal (RH) work window on February 10, 2021 (2)1A SI work window as set forth in WO 5067292 on March 3, 2021
: (3) Work risk during the week of March 15, 2021
: (4) Work risk during the week of March 29, 2021
 
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
: (1) The 2B diesel generator tripped during start for monthly run as documented in AR 4397062 on January 21, 2021
: (2) VC damper issue as documented in AR 4399739 on January 20, 2021 (3)0B essential service water (SX) cooling tower fan oil press alarm as documented in AR 4403121 on February 19, 2021
: (4) Unit 2 Power Distribution Monitoring System/Plant Process Computer problem as documented in AR 4407267 on March 13, 2021 (5)1FW009A, Main feedwater isolation valve hydraulic pump cycling as documented in AR 441170 on March 26, 2021
 
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)
 
The inspectors evaluated the following temporary or permanent modifications:
 
(1)1A EDG JW Clr leak repair clamp as documented in ARs 4393165 and 4389788 on February 3, 2021
: (2) Revise Unit 1 Reactor Coolant System (RCS) Program Reference Temperature from 587.0 deg F to 586.5 deg F in the Ovation' Digital Control System as documented in WO 5093368 and EC 632575 on March 3, 2021
 
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
 
(1)1A containment spray (CS) post-maintenance test (PMT) following maintenance as set forth in WO 04966365 on February 3, 2021 (2)2A CS PMT per 2BOSR 5.5.8.CS.5-1c as set forth in WO 5115336 on February 26, 2021 (3)1A SI pump bearing and seal work and test per 1BOSR 5.5.8.SI.5-1a as set forth in WO 5112994 on March 4, 2021 (4)0B Fire Pump PMT following maintenance as set forth in WO 5136033 on March 26, 2021
 
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:
 
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=3}}
 
(1)1BOSR 7.5.4-2, 1B AF monthly test as set forth in WO 5118865 on February 19, 2021
: (2) Surveillance Frequency Change, (STI BY-20-004), Revise valve alignment verification from monthly to quarterly on March 3, 2021 (3)2BOSR 8.1.2-1, 2A Diesel Generator Test as set forth in WO 5115341, on February 3, 2021
 
===Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) Group A inservice test (IST) for 2RH01PB on January 23, 2021
 
==71114.06 - Drill Evaluation==
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
: (1) The inspectors observed and evaluated an emergency preparedness (EP) drill on February 9, 2021.
 
===Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
The inspectors evaluated:
: (1) The inspectors observed and evaluated a DEP scenario on February 19,
 
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification
 
The inspectors verified licensee performance indicators submittals listed below:
 
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01)===
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
 
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02) (2 Samples)
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
 
===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)===
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
 
==71152 - Problem Identification and Resolution==
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Use of plant barrier impairment (PBI) permits during maintenance activities on February 10,
 
==INSPECTION RESULTS==
Observation: Use of Plant Barrier Impairment Permits During Maintenance Activities 71152 On February 10, 2021, during the NRC performed a walkdown of protected equipment associated with a 1B RH cubicle cooler work window (WO 4952630). During this walkdown the NRC noted the Unit 1 containment spray (CS) pump area door, 0DSD245, was wide open and unattended. Upon identification the inspectors notified the shift of the condition. The inspectors proceeded to review the PBI program documents and noted that they only allowed the door to be open 1 inch or less due to ventilation requirements.
 
The inspectors reviewed the Corrective Action Program (CAP) causal evaluation performed by the licensee for the initial as found condition. The evaluation stated that two additional doors (0DSD847, and 0DSD253) had also been blocked open effectively linking the 1A CS room, 1B CS room and 1B RH room. Based on existing and expected pressures, the evaluation concluded that there was reasonable assurance that the auxiliary building ventilation was operable. Additionally, the evaluation on the human performance aspect concluded that the lack of briefing the specific PBI requirements to the assigned individuals prevented the identification and correction of the condition. Based on an inadequate brief or turnover, the responsible individuals did not understand that the door could not be propped full open due to ventilation requirements. The inspector identified that the failure to follow the plant barrier impairment program when blocking open doors 0DSD245, 0DSD847, and 0DSD253 was a performance deficiency, but that it was of minor significance since it did not affect the availability, capability or reliability of safety systems.
 
To further understand if there where general issues with PBIs the inspectors looked in the CAP system and found that over the course of a month, three instances of inadequate use of PBIs were entered in the CAP as listed below:
 
2/2/2021: AR 04399590, New PBI required for 1A CS pump work window
 
2/17/2021: AR 04403035, NRC identified item on PBI
 
3/9/2021: AR 04407661, Incorrect PBI permit generated for 2A RH work window
 
Based on the information above the inspector saw that there was a potential that Byron staff may not be fully aware that there are more PBI requirements than just performing a fire watch. The observation was shared with the site who is addressing this item as part of their planned corrective actions.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On April 7, 2021, the inspectors presented the integrated inspection results to Mr. H. Welt, Acting Site Vice President, and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.01
Corrective Action
Documents
04393161
Degraded Piping
2/31/2020
Procedures
OP-AA-108-111-
1001
Severe Weather and Natural Disaster Guidelines
71111.04
Procedures
BOP AF-M2A
Aux. Feedwater System Train "A" Valve Lineup
BOP DG-E2A
Diesel Generator Train "A" Electrical Lineup
BOP DG-M2A
Train "A" Diesel Generator System Valve Lineup
BOP DG-M2B
Train "B" Diesel Generator System Valve Lineup
BOP SI-M1A
Train "A" Safety Injection Valve Lineup
71111.05
Corrective Action
Documents
2392278
Battery in Use Light Did Not Illuminate
10/07/2014
2392279
Battery in Use Light Did Not Illuminate
10/07/2014
4102915
2PA39J Battery Trouble Light Lit
2/11/2018
Corrective Action
Documents
Resulting from
Inspection
4398693
NRC Identified, Non TRM Fire Door Not Latching
01/28/2021
4406643
NRC ID- 0DSD606 (0B SX M/U PP DO Tank Room) Does
Not Lock
03/04/2021
Drawings
6E-2-4030FP43
Fire Detection Control Cabinets 2PA39J & 2PA49J
D
6E-2-4171
Elevation Fire Detection Control Cabinet 2PA39J
P
6E-2-4186
Elevation Fire Detection Control Cabinet 2PA49J
S
Fire Plans
FZ 18.1-1
1B DG & Switchgear Room Air Shaft
PFP #201
Fire Area/Zone: FZ 18.6-0, Service Bldg. 401'-0" ELEV.
Ground Floor
PFP #48
FZ 5.4-2, Aux. Bldg. 451' Div. 22 MEER
PFP #50
FZ 5.5-2, Aux. Bldg. 451' U2 AEER
Miscellaneous
21-04-MMD FLS
Office
Fire Drill Scenario No. 21-04
2/30/2020
Procedures
BAP 1100-10T
Fire Drill Planning Checklist
OP-AA-201-003
Fire Drill Performance
Self-Assessments A-Shift-21-04
Fire Drill Record
2/01/2021
71111.07A
Engineering
Evaluations
BYR97-467
Component Cooling Heat Exchanger Tube Plugging
Evaluation
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.11Q Miscellaneous
LORT Scenario
2/25/2021
71111.12
Corrective Action
Documents
04396726
0VC Make Up Fan Trip
01/19/2021
04396745
Unit 2 RX Power Oscillating Since Last Outage
01/19/2021
71111.13
Corrective Action
Documents
Resulting from
Inspection
4403035
NRC Identified Item on PBI
2/17/2021
Miscellaneous
UFSAR 9.4.5.1
Auxiliary Building HVAC
Procedures
BAP 1100-3A3
Pre-Evaluated Plant Barrier Matrix
CC-AA-201
Plant Barrier Control Program
71111.15
Corrective Action
Documents
04397062
2B DG Tripped During Monthly Start
01/21/2021
4399739
Fire Damper oVC187Y Electro-Thermal Links Blown,
Damper Open
2/02/2021
4403121
0B SX CT Fan Oil Pressure Alarm
2/19/2021
4407267
U2 PDMS/PPC Problem Alarm
03/13/2021
Operability
Evaluations
441170
1FW009A, Main Feedwater Isolation Valve Hydraulic Pump
Was Cycling
03/26/2021
Procedures
OP-AA-108-115
Operability Determinations
71111.18
Engineering
Changes
2575
FCN-CAEO-40544: Decrease of Full Load Tref from 587 deg
F to 586.5 deg F
03/03/2021
Work Orders
5093368
Revise Unit 1 RCS Program Reference Temperature in
Ovation
03/03/2021
71111.19
Corrective Action
Documents
4411158
0B Diesel Fire Pump Battery #2, Cell#1 Low Specific Gravity
03/24/2021
Corrective Action
Documents
Resulting from
Inspection
4406587
NRC ID: Boric Acid Build up on 0PI-FC006
03/04/2021
Procedures
2BOSR
5.5.8.CS.5-1c
Comprehensive Inservice Testing (IST) Requirements for
Containment Spray Pump 2CS01PA
Work Orders
4966365
1A CS PMT Following Maintenance
2/03/2021
5109618
0BOSR 10.B.2-1, Diesel Fire Pump Battery Monthly
Surveillance
03/26/2021
5115336
(NEIL) - 2CS01PA Comprehensive IST RQMTS for
2/19/2021
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Containment Spray
26616
0BOSR 10.B.6-1, Diesel Fire Pump Monthly Surveillance
03/26/2021
5136033
Unexpected Auto Start of 0B Fire Pump
03/25/2021
71111.22
Miscellaneous
STI BY-20-004
Revise Valve Alignment Verification Monthly Surveillance
from Monthly to Quarterly
03/01/2021
Procedures
1BOSR 7.5.4-2
Diesel Driven Auxiliary Feedwater Pump Monthly
Surveillance
2BOSR
5.5.8.RH.5-2a
Group A Inservice Testing (IST) Requirements for Residual
Heat Removal Pump 2RH01PB
Work Orders
5098934
(NEIL) - 2RH01PB Group A IST Requirements for RH Pump
01/22/2021
5115341
LR-2BOSR 8.1.2-1, 2A D/G Monthly Surveillance
2/03/2021
5118865
1BOSR 7.5.4-2, 1B AF PP Run
2/18/2021
71151
Miscellaneous
Unplanned Power Changes Data from Logs (01/01/2020 -
2/31/2020)
71152
Corrective Action
Documents
234300
Specific Gravity is Low on the 0D Dsl Drv FP Batt #2
03/29/2019
4399590
New PBI Required for 1A CS Pump Work Window
2/02/2021
4407661
Incorrect PBI Permit Generated for 2A RH PP Work Window
03/09/2021
Miscellaneous
0BOL 10.g
LCOAR Fire Assemblies TRM LCO # 3.10.g for PBI 20-295
and 296
2/11/2021
OP-AA-201-007,
"Sample" Fire Watch Inspection Log for 0DSD245/0DSD847
2/11/2021
PBI 20-295
CC-AA-201-F-01, Plant Barrier Impairment Permit for
0DSD245
2/11/2021
}}
}}

Latest revision as of 09:41, 29 November 2024

Integrated Inspection Report 05000454/2021001 and 05000455/2021001
ML21110A129
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/20/2021
From: Hironori Peterson
Region 3 Branch 3
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021001
Download: ML21110A129 (13)


Text

April 20, 2021

SUBJECT:

BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2021001 AND 05000455/2021001

Dear Mr. Rhoades:

On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On April 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. H. Welt, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects

Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000454 and 05000455

License Numbers:

NPF-37 and NPF-66

Report Numbers:

05000454/2021001 and 05000455/2021001

Enterprise Identifier: I-2021-001-0017

Licensee:

Exelon Generation Company, LLC

Facility:

Byron Station

Location:

Byron, IL

Inspection Dates:

January 01, 2021 to March 31, 2021

Inspectors:

D. Betancourt-Roldan, Senior Resident Inspector

C. Thompson, Illinois Emergency Management Agency

J. Weigandt, Resident Inspector

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from an impending winter storm on January 25 through January 26, 2021.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)1A safety injection (SI) prior to B test on February 10, 2021 (2)2B emergency diesel generator (EDG) during 2A semi-annual test as set forth in Work Order (WO) 5081391 on March 10, 2021 (3)2A EDG prior to 2B EDG work on March 22, 2021

Complete Walkdown Sample (IP Section 03.02) (1 Partial)

(1)

(Partial)

The inspectors evaluated system configurations during a complete walkdown of the Unit 2 auxiliary feedwater (AF) system on February 3 and March 26, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 Division 12 Miscellaneous Electrical Equipment Room (MEER) and Battery Room, Fire Zones (FZs) 5.4-2, 5.5-2, and 5.6-2 on March 10, 2021 (2)1B EDG Room, FZ 18.1-1 on March 4, 2021
(3) Unit 2 Division MEER, FZ 5.4-2 on March 17, 2021

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on January 30, 2021.

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Component cooling heat exchanger tube plugging on February 16, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during implementation of Engineering Change (EC) 632575, Unit 1 "Tref" adjustment on March 3, 2021. The inspectors also observed operator performance in the Control Room during 0BOSR MP-1 max VAR testing under Work Order 5029908 on March 11, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a licensed operator training requalification scenario on February 15, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Issues with Unit 2 power oscillations as documented in Action Request (AR) 04396745 on January 25, 2021
(2) Control Room heating ventilation and air conditioning (VC) system on February 10, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)1B residual heat removal (RH) work window on February 10, 2021 (2)1A SI work window as set forth in WO 5067292 on March 3, 2021

(3) Work risk during the week of March 15, 2021
(4) Work risk during the week of March 29, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) The 2B diesel generator tripped during start for monthly run as documented in AR 4397062 on January 21, 2021
(2) VC damper issue as documented in AR 4399739 on January 20, 2021 (3)0B essential service water (SX) cooling tower fan oil press alarm as documented in AR 4403121 on February 19, 2021
(4) Unit 2 Power Distribution Monitoring System/Plant Process Computer problem as documented in AR 4407267 on March 13, 2021 (5)1FW009A, Main feedwater isolation valve hydraulic pump cycling as documented in AR 441170441170on March 26, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1)1A EDG JW Clr leak repair clamp as documented in ARs 4393165 and 4389788 on February 3, 2021

(2) Revise Unit 1 Reactor Coolant System (RCS) Program Reference Temperature from 587.0 deg F to 586.5 deg F in the Ovation' Digital Control System as documented in WO 5093368 and EC 632575 on March 3, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1)1A containment spray (CS) post-maintenance test (PMT) following maintenance as set forth in WO 04966365 on February 3, 2021 (2)2A CS PMT per 2BOSR 5.5.8.CS.5-1c as set forth in WO 5115336 on February 26, 2021 (3)1A SI pump bearing and seal work and test per 1BOSR 5.5.8.SI.5-1a as set forth in WO 5112994 on March 4, 2021 (4)0B Fire Pump PMT following maintenance as set forth in WO 5136033 on March 26, 2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)1BOSR 7.5.4-2, 1B AF monthly test as set forth in WO 5118865 on February 19, 2021

(2) Surveillance Frequency Change, (STI BY-20-004), Revise valve alignment verification from monthly to quarterly on March 3, 2021 (3)2BOSR 8.1.2-1, 2A Diesel Generator Test as set forth in WO 5115341, on February 3, 2021

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Group A inservice test (IST) for 2RH01PB on January 23, 2021

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated an emergency preparedness (EP) drill on February 9, 2021.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) The inspectors observed and evaluated a DEP scenario on February 19,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01)===

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02) (2 Samples)

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Use of plant barrier impairment (PBI) permits during maintenance activities on February 10,

INSPECTION RESULTS

Observation: Use of Plant Barrier Impairment Permits During Maintenance Activities 71152 On February 10, 2021, during the NRC performed a walkdown of protected equipment associated with a 1B RH cubicle cooler work window (WO 4952630). During this walkdown the NRC noted the Unit 1 containment spray (CS) pump area door, 0DSD245, was wide open and unattended. Upon identification the inspectors notified the shift of the condition. The inspectors proceeded to review the PBI program documents and noted that they only allowed the door to be open 1 inch or less due to ventilation requirements.

The inspectors reviewed the Corrective Action Program (CAP) causal evaluation performed by the licensee for the initial as found condition. The evaluation stated that two additional doors (0DSD847, and 0DSD253) had also been blocked open effectively linking the 1A CS room, 1B CS room and 1B RH room. Based on existing and expected pressures, the evaluation concluded that there was reasonable assurance that the auxiliary building ventilation was operable. Additionally, the evaluation on the human performance aspect concluded that the lack of briefing the specific PBI requirements to the assigned individuals prevented the identification and correction of the condition. Based on an inadequate brief or turnover, the responsible individuals did not understand that the door could not be propped full open due to ventilation requirements. The inspector identified that the failure to follow the plant barrier impairment program when blocking open doors 0DSD245, 0DSD847, and 0DSD253 was a performance deficiency, but that it was of minor significance since it did not affect the availability, capability or reliability of safety systems.

To further understand if there where general issues with PBIs the inspectors looked in the CAP system and found that over the course of a month, three instances of inadequate use of PBIs were entered in the CAP as listed below:

2/2/2021: AR 04399590, New PBI required for 1A CS pump work window

2/17/2021: AR 04403035, NRC identified item on PBI

3/9/2021: AR 04407661, Incorrect PBI permit generated for 2A RH work window

Based on the information above the inspector saw that there was a potential that Byron staff may not be fully aware that there are more PBI requirements than just performing a fire watch. The observation was shared with the site who is addressing this item as part of their planned corrective actions.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 7, 2021, the inspectors presented the integrated inspection results to Mr. H. Welt, Acting Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

04393161

Degraded Piping

2/31/2020

Procedures

OP-AA-108-111-

1001

Severe Weather and Natural Disaster Guidelines

71111.04

Procedures

BOP AF-M2A

Aux. Feedwater System Train "A" Valve Lineup

BOP DG-E2A

Diesel Generator Train "A" Electrical Lineup

BOP DG-M2A

Train "A" Diesel Generator System Valve Lineup

BOP DG-M2B

Train "B" Diesel Generator System Valve Lineup

BOP SI-M1A

Train "A" Safety Injection Valve Lineup

71111.05

Corrective Action

Documents

2392278

Battery in Use Light Did Not Illuminate

10/07/2014

2392279

Battery in Use Light Did Not Illuminate

10/07/2014

4102915

2PA39J Battery Trouble Light Lit

2/11/2018

Corrective Action

Documents

Resulting from

Inspection

4398693

NRC Identified, Non TRM Fire Door Not Latching

01/28/2021

4406643

NRC ID- 0DSD606 (0B SX M/U PP DO Tank Room) Does

Not Lock

03/04/2021

Drawings

6E-2-4030FP43

Fire Detection Control Cabinets 2PA39J & 2PA49J

D

6E-2-4171

Elevation Fire Detection Control Cabinet 2PA39J

P

6E-2-4186

Elevation Fire Detection Control Cabinet 2PA49J

S

Fire Plans

FZ 18.1-1

1B DG & Switchgear Room Air Shaft

PFP #201

Fire Area/Zone: FZ 18.6-0, Service Bldg. 401'-0" ELEV.

Ground Floor

PFP #48

FZ 5.4-2, Aux. Bldg. 451' Div. 22 MEER

PFP #50

FZ 5.5-2, Aux. Bldg. 451' U2 AEER

Miscellaneous

21-04-MMD FLS

Office

Fire Drill Scenario No. 21-04

2/30/2020

Procedures

BAP 1100-10T

Fire Drill Planning Checklist

OP-AA-201-003

Fire Drill Performance

Self-Assessments A-Shift-21-04

Fire Drill Record

2/01/2021

71111.07A

Engineering

Evaluations

BYR97-467

Component Cooling Heat Exchanger Tube Plugging

Evaluation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11Q Miscellaneous

LORT Scenario

2/25/2021

71111.12

Corrective Action

Documents

04396726

0VC Make Up Fan Trip

01/19/2021

04396745

Unit 2 RX Power Oscillating Since Last Outage

01/19/2021

71111.13

Corrective Action

Documents

Resulting from

Inspection

4403035

NRC Identified Item on PBI

2/17/2021

Miscellaneous

UFSAR 9.4.5.1

Auxiliary Building HVAC

Procedures

BAP 1100-3A3

Pre-Evaluated Plant Barrier Matrix

CC-AA-201

Plant Barrier Control Program

71111.15

Corrective Action

Documents

04397062

2B DG Tripped During Monthly Start

01/21/2021

4399739

Fire Damper oVC187Y Electro-Thermal Links Blown,

Damper Open

2/02/2021

4403121

0B SX CT Fan Oil Pressure Alarm

2/19/2021

4407267

U2 PDMS/PPC Problem Alarm

03/13/2021

Operability

Evaluations

441170

1FW009A, Main Feedwater Isolation Valve Hydraulic Pump

Was Cycling

03/26/2021

Procedures

OP-AA-108-115

Operability Determinations

71111.18

Engineering

Changes

2575

FCN-CAEO-40544: Decrease of Full Load Tref from 587 deg

F to 586.5 deg F

03/03/2021

Work Orders

5093368

Revise Unit 1 RCS Program Reference Temperature in

Ovation

03/03/2021

71111.19

Corrective Action

Documents

4411158

0B Diesel Fire Pump Battery #2, Cell#1 Low Specific Gravity

03/24/2021

Corrective Action

Documents

Resulting from

Inspection

4406587

NRC ID: Boric Acid Build up on 0PI-FC006

03/04/2021

Procedures

2BOSR

5.5.8.CS.5-1c

Comprehensive Inservice Testing (IST) Requirements for

Containment Spray Pump 2CS01PA

Work Orders

4966365

1A CS PMT Following Maintenance

2/03/2021

5109618

0BOSR 10.B.2-1, Diesel Fire Pump Battery Monthly

Surveillance

03/26/2021

5115336

(NEIL) - 2CS01PA Comprehensive IST RQMTS for

2/19/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Containment Spray

26616

0BOSR 10.B.6-1, Diesel Fire Pump Monthly Surveillance

03/26/2021

5136033

Unexpected Auto Start of 0B Fire Pump

03/25/2021

71111.22

Miscellaneous

STI BY-20-004

Revise Valve Alignment Verification Monthly Surveillance

from Monthly to Quarterly

03/01/2021

Procedures

1BOSR 7.5.4-2

Diesel Driven Auxiliary Feedwater Pump Monthly

Surveillance

2BOSR

5.5.8.RH.5-2a

Group A Inservice Testing (IST) Requirements for Residual

Heat Removal Pump 2RH01PB

Work Orders

5098934

(NEIL) - 2RH01PB Group A IST Requirements for RH Pump

01/22/2021

5115341

LR-2BOSR 8.1.2-1, 2A D/G Monthly Surveillance

2/03/2021

5118865

1BOSR 7.5.4-2, 1B AF PP Run

2/18/2021

71151

Miscellaneous

Unplanned Power Changes Data from Logs (01/01/2020 -

2/31/2020)

71152

Corrective Action

Documents

234300

Specific Gravity is Low on the 0D Dsl Drv FP Batt #2

03/29/2019

4399590

New PBI Required for 1A CS Pump Work Window

2/02/2021

4407661

Incorrect PBI Permit Generated for 2A RH PP Work Window

03/09/2021

Miscellaneous

0BOL 10.g

LCOAR Fire Assemblies TRM LCO # 3.10.g for PBI 20-295

and 296

2/11/2021

OP-AA-201-007,

"Sample" Fire Watch Inspection Log for 0DSD245/0DSD847

2/11/2021

PBI 20-295

CC-AA-201-F-01, Plant Barrier Impairment Permit for

0DSD245

2/11/2021