ML22276A156: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:October 5, 2022 | {{#Wiki_filter:October 5, 2022 | ||
Mr. John Dent, Jr. | Mr. John Dent, Jr. | ||
Vice President and Chief Nuclear Officer | Vice President and Chief Nuclear Officer | ||
Line 25: | Line 26: | ||
P.O. Box 98 | P.O. Box 98 | ||
Brownville, NE 68321 | Brownville, NE 68321 | ||
SUBJECT: | |||
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF COMMERCIAL GRADE | |||
DEDICATION INSPECTION (05000298/2023011) AND REQUEST FOR | |||
INFORMATION | |||
Dear Mr. Dent: | Dear Mr. Dent: | ||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff | The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff | ||
will conduct the commercial grade dedication baseline inspection at Cooper Nuclear Station, | will conduct the commercial grade dedication baseline inspection at Cooper Nuclear Station, | ||
Line 34: | Line 38: | ||
the NRC Region IV office. The inspection will be conducted in accordance with NRC inspection | the NRC Region IV office. The inspection will be conducted in accordance with NRC inspection | ||
procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022. | procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022. | ||
The inspection will evaluate the implementation of Cooper Nuclear Stations process for | The inspection will evaluate the implementation of Cooper Nuclear Stations process for | ||
dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10 | dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10 | ||
Line 40: | Line 45: | ||
this inspection will evaluate implementation of Cooper Nuclear Stations procurement process | this inspection will evaluate implementation of Cooper Nuclear Stations procurement process | ||
for safety-related components, as required in Appendix B. | for safety-related components, as required in Appendix B. | ||
The inspection will include an onsite information gathering visit by the team lead and two weeks | The inspection will include an onsite information gathering visit by the team lead and two weeks | ||
of onsite inspection by the team. The schedule for the inspection is as follows: | of onsite inspection by the team. The schedule for the inspection is as follows: | ||
Onsite Information Gathering Visit: January 9-13, 2023 | |||
Offsite Preparation Week: January 23-27, 2023 | |||
Onsite Inspection Weeks: January 30-February 3, 2023, and February 13-17, 2023 | |||
The purpose of the information gathering visit is to meet with your staff to become familiar with | The purpose of the information gathering visit is to meet with your staff to become familiar with | ||
the process for dedicating commercial-grade items and the process for procuring safety-related | the process for dedicating commercial-grade items and the process for procuring safety-related | ||
Line 53: | Line 60: | ||
inspection samples. The team lead may also identify other information needed to support the | inspection samples. The team lead may also identify other information needed to support the | ||
inspection during this visit. | inspection during this visit. | ||
J. Dent, Jr. | J. Dent, Jr. | ||
2To minimize the impact on your staff and to ensure a productive inspection, we have enclosed | |||
two separate requests for information. The first request (Enclosure 1) is generally for information | two separate requests for information. The first request (Enclosure 1) is generally for information | ||
that will be used to choose the inspection samples or information that will be applicable to all | that will be used to choose the inspection samples or information that will be applicable to all | ||
inspection samples throughout the inspection. This information should be made available to the | inspection samples throughout the inspection. This information should be made available to the | ||
team lead prior to the information gathering visit. The second request (Enclosure 2) is for | team lead prior to the information gathering visit. The second request (Enclosure 2) is for | ||
information that is specific to an individual sample and should be made available prior to the | information that is specific to an individual sample and should be made available prior to the | ||
offsite preparation week. | offsite preparation week. | ||
Additional information requests, interviews with your staff, and/or walkdowns of facilities or | Additional information requests, interviews with your staff, and/or walkdowns of facilities or | ||
installed plant components will be made by the team throughout the inspection to complete their | installed plant components will be made by the team throughout the inspection to complete their | ||
review of the selected inspection samples. It is important that all documentation provided to the | review of the selected inspection samples. It is important that all documentation provided to the | ||
team is complete and up-to-date to minimize the number of additional documents requested | team is complete and up-to-date to minimize the number of additional documents requested | ||
during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an | during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an | ||
efficient inspection, we request that a contact individual be assigned to each inspector to ensure | efficient inspection, we request that a contact individual be assigned to each inspector to ensure | ||
information requests, questions, and concerns are addressed in a timely manner. | information requests, questions, and concerns are addressed in a timely manner. | ||
If there are any questions about the inspection or the information requested, please contact the | If there are any questions about the inspection or the information requested, please contact the | ||
team lead, Jonathan Braisted, by telephone at 817-200-1469 or by email at | team lead, Jonathan Braisted, by telephone at 817-200-1469 or by email at | ||
Jonathan.Braisted@nrc.gov. Enclosure 3 contains additional contact information for the | Jonathan.Braisted@nrc.gov. Enclosure 3 contains additional contact information for the | ||
inspection team. | inspection team. | ||
PAPERWORK REDUCTION ACT STATEMENT | PAPERWORK REDUCTION ACT STATEMENT | ||
This letter contains mandatory information collections that are subject to the Paperwork | This letter contains mandatory information collections that are subject to the Paperwork | ||
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) | Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) | ||
approved these information collections (approval number 3150-0011). Send comments | approved these information collections (approval number 3150-0011). Send comments | ||
regarding this information collection to the Information Services Branch, Office of the Chief | regarding this information collection to the Information Services Branch, Office of the Chief | ||
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC | Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC | ||
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of | 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of | ||
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and | Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and | ||
Budget, Washington, DC 20503. | Budget, Washington, DC 20503. | ||
PUBLIC PROTECTION NOTIFICATION | PUBLIC PROTECTION NOTIFICATION | ||
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request | The NRC may not conduct nor sponsor, and a person is not required to respond to, a request | ||
for information or an information collection requirement unless the requesting document | for information or an information collection requirement unless the requesting document | ||
displays a currently valid OMB control number. | displays a currently valid OMB control number. | ||
This letter, its enclosure, and your response (if any) will be made available for public inspection | This letter, its enclosure, and your response (if any) will be made available for public inspection | ||
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document | and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document | ||
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public | Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public | ||
Inspections, Exemptions, Requests for Withholding. | Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | |||
Vincent G. Gaddy, Chief | |||
Engineering Branch 1 | |||
Division of Operating Reactor Safety | |||
Signed by Gaddy, Vincent | |||
on 10/05/22 | |||
J. Dent, Jr. | J. Dent, Jr. | ||
Docket No. 05000298 | Docket No. 05000298 | ||
License No. DPR-46 | License No. DPR-46 | ||
Enclosures: | Enclosures: | ||
1. Documents Requested Prior Information Gathering Visit | |||
2. Documents Requested Prior to Inspection Preparation Week | |||
3. Inspection Team Contact Information | |||
cc w/ encl: Distribution via LISTSERV | cc w/ encl: Distribution via LISTSERV | ||
3 | |||
ML22276A156 | ML22276A156 | ||
X Non-Sensitive X Publicly Available | |||
X SUNSI Review | |||
Sensitive Non-Publicly Available | |||
OFFICE BC:DORS/EB1 SRI:DORS/EB1 | |||
NAME VGaddy JBraisted | |||
DATE 10/5/2022 10/5/2022 | |||
Enclosure 1 | |||
Documents Requested Prior to Information Gathering Visit | |||
The documents and information requested below should generally be made available to the | The documents and information requested below should generally be made available to the | ||
inspection team for the team's use both onsite and offsite during the information gathering visit. | inspection team for the team's use both onsite and offsite during the information gathering visit. | ||
Line 126: | Line 191: | ||
media on compact disc or paper records (hardcopy) are acceptable. At the end of the | media on compact disc or paper records (hardcopy) are acceptable. At the end of the | ||
inspection, the documents in the team's possession will not be retained. | inspection, the documents in the team's possession will not be retained. | ||
This document request is based on typical documents that a generic plant might have. As such, | This document request is based on typical documents that a generic plant might have. As such, | ||
this document request is not meant to imply that any specific plant is required to have all of the | this document request is not meant to imply that any specific plant is required to have all of the | ||
listed documents. In addition, your plant specific document titles may vary from the document | listed documents. In addition, your plant specific document titles may vary from the document | ||
titles listed below. We also request that the information provided be sorted by the list below. | titles listed below. We also request that the information provided be sorted by the list below. | ||
Documents Requested by January 2, 2023: | Documents Requested by January 2, 2023: | ||
1. Licensing basis documents such as the updated final safety analysis report and | |||
technical specifications. | |||
2. Procedures for dedicating commercial-grade items and for procurement of safety- | |||
related components. | |||
3. List of items commercial-grade items, with a brief description of application, that have | |||
been dedicated for safety-related applications. These items may be dedicated by | |||
Cooper Nuclear Station or dedicated by a vendor (or other licensee) and procured by | |||
Cooper Nuclear Station. Please note whether the item has been installed in the | |||
plant. The list should encompass the past six years of dedication activities. | |||
4. List of components procured as safety-related, with descriptions, if not included | |||
above. Please note whether the item has been installed in the plant. The list should | |||
encompass the past six years of procurement activities. | |||
5. List of corrective action program documents, with descriptions, related to | |||
commercial-grade items, procurement, or storage, including any items that failed | |||
after completing the dedication process. The list should encompass the past six | |||
years of these activities. | |||
6. List of systems, system numbers/designators, and corresponding names. | |||
7. List of site contacts that will be associated with the inspection. | |||
Enclosure | |||
Enclosure 2 | |||
Documents Requested Prior to Inspection Preparation Week | |||
For the samples identified by the team lead, the documents and information requested below | For the samples identified by the team lead, the documents and information requested below | ||
should generally be made available to the inspection team for the team's use both onsite and | should generally be made available to the inspection team for the team's use both onsite and | ||
Line 161: | Line 247: | ||
acceptable. At the end of the inspection, the documents in the team's possession will not be | acceptable. At the end of the inspection, the documents in the team's possession will not be | ||
retained. | retained. | ||
This document request is based on typical documents that a generic plant might have. As such, | This document request is based on typical documents that a generic plant might have. As such, | ||
this document request is not meant to imply that any specific plant is required to have all of the | this document request is not meant to imply that any specific plant is required to have all of the | ||
Line 166: | Line 253: | ||
titles listed below. We also request that the information provided be sorted by the list below for | titles listed below. We also request that the information provided be sorted by the list below for | ||
each sample. | each sample. | ||
Documents Requested by January 23, 2023: | Documents Requested by January 23, 2023: | ||
15. Design/material/process change history information. | 1. Purchase requisition and purchase orders. | ||
16. Completed commercial-grade dedication document including safety classification, | |||
2. Other pertinent vendor/licensee correspondence. | |||
3. Original and updated design specifications. | |||
4. Catalog specifications. | |||
17. Any deviation from design, material, and performance characteristics relevant to the | |||
5. Procurement basis evaluation such as like-for-like, equivalency, plant design change | |||
18. Documents showing objective evidence such as special test and inspection | packages, drawing and specification updates. | ||
6. 10 CFR 50.59 documentation, if required. | |||
19. Completed post-installation test procedure and results. | 7. Material receiving reports, packing lists/invoices, and other shipping documents. | ||
20. Completed stock or material issue forms and installation work orders or reports. | |||
21. Historical performance information. | 8. Receipt inspection reports and any related test reports. | ||
9. Other documents to trace the item from the time it was dedicated to the time it was | |||
installed, tested, and accepted. | |||
10. Certificates of conformance/compliance/quality. | |||
11. Vendor test and inspection reports. | |||
12. Third-party or subvendor test and inspection reports. | |||
13. Shelf-life information. | |||
14. Vendor dedication/partial dedication information. | |||
Enclosure 2 | |||
15. Design/material/process change history information. | |||
16. Completed commercial-grade dedication document including safety classification, | |||
identification of safety functions/application requirements, identification of critical | |||
characteristics, identification of verification methods and acceptance criteria for the | |||
critical characteristics, evaluation of credible failure modes, if applicable, and | |||
identification of the suppliers quality assurance program that meets 10 CFR Part 50, | |||
Appendix B. | |||
17. Any deviation from design, material, and performance characteristics relevant to the | |||
safety function (nonconformance dispositions). | |||
18. Documents showing objective evidence such as special test and inspection | |||
procedures and results, commercial-grade survey reports -item, design, material, | |||
and specific performance characteristic (relevant to safety function), and source | |||
inspection reports. | |||
19. Completed post-installation test procedure and results. | |||
20. Completed stock or material issue forms and installation work orders or reports. | |||
21. Historical performance information. | |||
2 | |||
Enclosure 3 | |||
Inspection Team Contact Information | |||
Inspection Team: | Inspection Team: | ||
Jonathan Braisted (Lead) Gerond George Dustin Bryen | Jonathan Braisted (Lead) Gerond George Dustin Bryen | ||
Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector | Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector | ||
817-200-1469 817-200-1562 817-200-1078 | 817-200-1469 817-200-1562 817-200-1078 | ||
Jonathan.Braisted@nrc.gov Gerond.George@nrc.gov Dustin.Bryen@nrc.gov | Jonathan.Braisted@nrc.gov Gerond.George@nrc.gov Dustin.Bryen@nrc.gov | ||
Mailing Address: | Mailing Address: | ||
U.S. NRC, Region IV | U.S. NRC, Region IV | ||
Attn: Jonathan Braisted | Attn: Jonathan Braisted | ||
1600 East Lamar Blvd. | 1600 East Lamar Blvd. | ||
Arlington, TX 76011-4511 | Arlington, TX 76011-4511 | ||
Enclosure 3 | |||
}} | }} |
Latest revision as of 03:20, 16 November 2024
ML22276A156 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 10/05/2022 |
From: | Vincent Gaddy NRC/RGN-IV/DORS/EB1 |
To: | Dent J Nebraska Public Power District (NPPD) |
Braisted J | |
References | |
IR 2023011 | |
Download: ML22276A156 (8) | |
See also: IR 05000298/2023011
Text
October 5, 2022
Mr. John Dent, Jr.
Vice President and Chief Nuclear Officer
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF COMMERCIAL GRADE
DEDICATION INSPECTION (05000298/2023011) AND REQUEST FOR
INFORMATION
Dear Mr. Dent:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the commercial grade dedication baseline inspection at Cooper Nuclear Station,
beginning on January 30, 2023. The inspection team will be composed of three personnel from
the NRC Region IV office. The inspection will be conducted in accordance with NRC inspection
procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022.
The inspection will evaluate the implementation of Cooper Nuclear Stations process for
dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10
of the Code of Federal Regulations (10 CFR) Part 50 (Appendix B), to ensure reasonable
assurance is provided that these items will perform their intended safety function. Additionally,
this inspection will evaluate implementation of Cooper Nuclear Stations procurement process
for safety-related components, as required in Appendix B.
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
Onsite Information Gathering Visit: January 9-13, 2023
Offsite Preparation Week: January 23-27, 2023
Onsite Inspection Weeks: January 30-February 3, 2023, and February 13-17, 2023
The purpose of the information gathering visit is to meet with your staff to become familiar with
the process for dedicating commercial-grade items and the process for procuring safety-related
components at Cooper Nuclear Station. This visit may include a tour of onsite commercial-grade
item dedication facilities, receipt inspection facilities, storage facilities, and installed plant
components associated with potential inspection samples. During the visit, the team lead will
also review the information provided in the initial information request to select a list of potential
inspection samples. The team lead may also identify other information needed to support the
inspection during this visit.
J. Dent, Jr.
2To minimize the impact on your staff and to ensure a productive inspection, we have enclosed
two separate requests for information. The first request (Enclosure 1) is generally for information
that will be used to choose the inspection samples or information that will be applicable to all
inspection samples throughout the inspection. This information should be made available to the
team lead prior to the information gathering visit. The second request (Enclosure 2) is for
information that is specific to an individual sample and should be made available prior to the
offsite preparation week.
Additional information requests, interviews with your staff, and/or walkdowns of facilities or
installed plant components will be made by the team throughout the inspection to complete their
review of the selected inspection samples. It is important that all documentation provided to the
team is complete and up-to-date to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an
efficient inspection, we request that a contact individual be assigned to each inspector to ensure
information requests, questions, and concerns are addressed in a timely manner.
If there are any questions about the inspection or the information requested, please contact the
team lead, Jonathan Braisted, by telephone at 817-200-1469 or by email at
Jonathan.Braisted@nrc.gov. Enclosure 3 contains additional contact information for the
inspection team.
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
Signed by Gaddy, Vincent
on 10/05/22
J. Dent, Jr.
Docket No. 05000298
License No. DPR-46
Enclosures:
1. Documents Requested Prior Information Gathering Visit
2. Documents Requested Prior to Inspection Preparation Week
3. Inspection Team Contact Information
cc w/ encl: Distribution via LISTSERV
3
X Non-Sensitive X Publicly Available
X SUNSI Review
Sensitive Non-Publicly Available
OFFICE BC:DORS/EB1 SRI:DORS/EB1
NAME VGaddy JBraisted
DATE 10/5/2022 10/5/2022
Enclosure 1
Documents Requested Prior to Information Gathering Visit
The documents and information requested below should generally be made available to the
inspection team for the team's use both onsite and offsite during the information gathering visit.
Electronic format is the preferred media. If electronic media is made available via an internet
based remote document management system, then the remote document access must allow
inspectors to download, save, and print the documents in the NRC's regional office. Electronic
media on compact disc or paper records (hardcopy) are acceptable. At the end of the
inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
Documents Requested by January 2, 2023:
1. Licensing basis documents such as the updated final safety analysis report and
technical specifications.
2. Procedures for dedicating commercial-grade items and for procurement of safety-
related components.
3. List of items commercial-grade items, with a brief description of application, that have
been dedicated for safety-related applications. These items may be dedicated by
Cooper Nuclear Station or dedicated by a vendor (or other licensee) and procured by
Cooper Nuclear Station. Please note whether the item has been installed in the
plant. The list should encompass the past six years of dedication activities.
4. List of components procured as safety-related, with descriptions, if not included
above. Please note whether the item has been installed in the plant. The list should
encompass the past six years of procurement activities.
5. List of corrective action program documents, with descriptions, related to
commercial-grade items, procurement, or storage, including any items that failed
after completing the dedication process. The list should encompass the past six
years of these activities.
6. List of systems, system numbers/designators, and corresponding names.
7. List of site contacts that will be associated with the inspection.
Enclosure
Enclosure 2
Documents Requested Prior to Inspection Preparation Week
For the samples identified by the team lead, the documents and information requested below
should generally be made available to the inspection team for the team's use both onsite and
offsite during the inspection. Electronic format is the preferred media. If electronic media is
made available via an internet based remote document management system, then the remote
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hardcopy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
Documents Requested by January 23, 2023:
1. Purchase requisition and purchase orders.
2. Other pertinent vendor/licensee correspondence.
3. Original and updated design specifications.
4. Catalog specifications.
5. Procurement basis evaluation such as like-for-like, equivalency, plant design change
packages, drawing and specification updates.
6. 10 CFR 50.59 documentation, if required.
7. Material receiving reports, packing lists/invoices, and other shipping documents.
8. Receipt inspection reports and any related test reports.
9. Other documents to trace the item from the time it was dedicated to the time it was
installed, tested, and accepted.
10. Certificates of conformance/compliance/quality.
11. Vendor test and inspection reports.
12. Third-party or subvendor test and inspection reports.
13. Shelf-life information.
14. Vendor dedication/partial dedication information.
Enclosure 2
15. Design/material/process change history information.
16. Completed commercial-grade dedication document including safety classification,
identification of safety functions/application requirements, identification of critical
characteristics, identification of verification methods and acceptance criteria for the
critical characteristics, evaluation of credible failure modes, if applicable, and
identification of the suppliers quality assurance program that meets 10 CFR Part 50,
Appendix B.
17. Any deviation from design, material, and performance characteristics relevant to the
safety function (nonconformance dispositions).
18. Documents showing objective evidence such as special test and inspection
procedures and results, commercial-grade survey reports -item, design, material,
and specific performance characteristic (relevant to safety function), and source
inspection reports.
19. Completed post-installation test procedure and results.
20. Completed stock or material issue forms and installation work orders or reports.
21. Historical performance information.
2
Enclosure 3
Inspection Team Contact Information
Inspection Team:
Jonathan Braisted (Lead) Gerond George Dustin Bryen
Senior Reactor Inspector Senior Reactor Inspector Reactor Inspector
817-200-1469 817-200-1562 817-200-1078
Jonathan.Braisted@nrc.gov Gerond.George@nrc.gov Dustin.Bryen@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Jonathan Braisted
1600 East Lamar Blvd.
Arlington, TX 76011-4511
Enclosure 3