Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information
ML22179A315
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/28/2022
From: Greg Pick
NRC/RGN-IV/DORS/EB2
To: Dent J
Nebraska Public Power District (NPPD)
Pick G
References
IR 2022011
Download: ML22179A315 (6)


See also: IR 05000298/2022011

Text

June 28, 2022

Mr. John Dent, Jr., Vice President

and Chief Nuclear Officer

Nebraska Public Power District

Cooper Nuclear Station

72676 648A Avenue

P.O. Box 98

Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - NOTIFICATION OF POST-APPROVAL

SITE INSPECTION FOR LICENSE RENEWAL (PHASE 4) (NRC

INSPECTION REPORT 05000298/2022011) AND REQUEST FOR

INFORMATION

Dear Mr. Dent:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission

(NRC) Region IV staff will perform a Phase 4 License Renewal Inspection at Cooper

Nuclear Station from November 14-18, 2022. The inspectors will conduct the inspection in

accordance with NRC inspection procedure 71003, Post-Approval Site Inspection for

License Renewal.

Inspection insights suggest that this inspection will be resource-intensive for both the NRC

inspectors and your staff. To minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Section A of the enclosure identifies information to be provided by August 1, 2022, to ensure

adequate sample selection and preparation. Section B of the enclosure identifies additional

information the inspectors will need by September 23, 2022, to complete the review of

inspection samples. The inspection staff requests that all the documents requested are up to

date and complete to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mark Unruh at 402-825-5470 or

m1unruh@nppd.com of your organization. If there are any questions about this inspection or the

material requested, please contact the lead inspector, Greg Pick at 817-504-2105 (m),

817-200-1270 (w) or greg.pick@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT:

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of

J. Dent

2

the Chief Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office

of Management and Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid OMB control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Greg A. Pick

Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket: 50-298

License: DPR-46

Enclosure:

Phase 4 Inspection Information Request

cc w/ encl: Distribution via LISTSERV

Signed by Pick, Gregory

on 06/28/22

ML22179A315

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: GAP

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

DORS/EB2:SRI

NAME

GPick

SIGNATURE

/RA/

DATE

6/28/2022

1

Enclosure

Cooper Nuclear Station

Inspection Information Request

Please provide the information requested in Section A to the NRC Region IV Office in care of

the lead inspector by August 1, 2022, to facilitate the selection of specific structures, systems

and components that will be reviewed during the onsite inspection week. The information can

be provided in hard copy or electronic format; however, electronic format is preferred, either by

digital data storage device or web-based document management system.

Using the information provided in Section A, the inspectors will request additional documents

needed for the onsite inspection week as described in Section B of this enclosure by

August 26, 2022. The specific documents in Section B should be available and ready for

review no later than September 23, 2022. If there are any questions regarding this information

request, please contact the lead inspector as soon as possible.

A. Information requested for each aging management program listed below (as

applicable)

The following aging management programs have been selected for this inspection:

1.

Aboveground Steel Tanks Program

2.

Buried Piping and Tanks Inspection Program

3.

BWR Vessel Internals Program

4.

Containment Inservice Inspection Program

5.

External Surfaces Monitoring Program

6.

Fire Protection Program

7.

Fire Water System Program

8.

Flow-Accelerated Corrosion Program

9.

Masonry Wall Program .

10.

Metal-Enclosed Bus Inspection Program

11.

Non-EQ Inaccessible Medium-Voltage Cable Program

12.

Non-EQ Instrumentation Circuits Test Review Program

13.

Selective Leaching Program

14.

Service Water Integrity Program

15.

Structures Monitoring Program

From the list above, please identify the aging management programs where the results

of one-time inspections concluded that no follow-up actions were required during the

period of extended operation.

Please provide the information requested below for each aging management program to

the lead inspector no later than August 1, 2022.

1.

Provide a list of all newly identified structures, systems and/or components that

have been incorporated into the aging management program(s), or any aging

management program, since entering the period of extended operation.

2.

Provide a list of commitment changes incorporated into the aging management

program, or any aging management program, since entering the period of

extended operation.

2

3.

Program basis documents and administrative procedures describing key program

attributes such as program objectives, scope, detection and monitoring methods,

administrative controls, acceptance criteria, corrective actions, and scope

expansion requirements

4.

Implementing procedures for program activities (e.g. visual examination procedures,

ultrasonic examination procedures, maintenance procedures, system walkdowns,

etc)

5.

Gap analyses performed to assess the differences between the current aging

management program and the recommendations in the latest revision of

NUREG-1801, Generic Aging Lessons Learned (GALL), and any subsequent

Interim Staff Guidance

6.

Self-assessments performed after entering the period of extended operation.

7.

Copy of evaluations performed for applicable external and internal operating

experience issues associated with license renewal. This request is limited to operating

experience items issued after entering the period of extended operation.

8.

Description of instances where examination scope expansion or additional

inspections to determine extent of condition was required based on the initial

examination of a structure, system and/or component for license renewal. Please

describe the logic to select the scope expansion, and any resulting changes to the

aging management program.

9.

List of corrective action documents (e.g., Condition Reports) associated with the

implementation of the aging management program. This includes unacceptable aging

effects identified during the implementation of license renewal activities, and

programmatic deficiencies requiring resolution since entering the period of extended

operation.

10.

Provide license renewal program administrative or program implementing procedure

that describes responsibilities of program owners, processing of operating experience

related to aging management, required training and qualifications, and any other

administrative controls.

11.

Provide the current operating experience, corrective action program, and self-

assessment administrative procedures. Also, include administrative procedures

related to changing commitments and revising license basis documents.

12.

Provide copies of any UFSAR changes related to license renewal, include the change

notices and 10 CFR 50.59 related documentation.

B. Information requested for each license renewal structure, system and/or

component selected for review (as applicable)

By August 26, 2022, the inspector(s) will select a sample of structures, systems, and/or

components (as applicable) using the information provided in response to Section A of this

enclosure. Please provide the information requested below to the lead inspector by

September 23, 2022.

3

For all aging management programs, except the aging management programs where the

results of one-time inspections concluded that no follow-up actions were required during

the period of extended operation, provide the following, as applicable, for each license

renewal structure, system, and/or component selected for review:

1.

A walkdown schedule for all structures and components selected that are readily

accessible at the time of the inspection.

2.

The scope and frequency of activities (i.e., inspection, sampling, testing, etc)

used to manage the aging of the item since entering the period of extended

operation.

3.

Completed work orders for the most recent aging management activities performed,

including associated inspection and testing reports, as applicable. This request is

limited to work performed in the period of extended operation or last two inspections,

whichever is greater. If more than 10 work orders provide a list.

4.

Structure, system, or component specific evaluation for monitoring and trending of

aging effects.

5.

Description of instances where examination of the structure or component was

eliminated or deferred.

6.

Description of instances where examination scope changes were required based

on limitations encountered during the examination.

7.

Description of instances where examination scope changes were required based

on results of the previous examination.

8.

A list with a brief description of the aging related issues documented in the corrective

action program since entering the period of extended operation. For example, provide

a list of condition reports based upon database searches using keywords related to

aging related degradation of the component or structure selected such as: crack,

corrosion, wear, thinning, leakage, thru- wall, rust.

For aging management programs where the results of one-time inspections concluded that

no follow-up actions were required during the period of extended operation, provide the

following for each structure or component selected for review:

1.

A walkdown schedule for all structures and components that are accessible

during the inspection.

2.

A list with a brief description of the aging related issues entered the corrective

action program since entering the period of extended operation. For example,

provide a list of condition reports based upon database searches using keywords

related to aging related degradation of the component or structure selected such