MONTHYEARML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 ML22200A2772022-07-21021 July 2022 Correction to Proposed Inservice Testing Alternative RS-01, Revision of Error in Safety Evaluation ML22152A1232022-07-18018 July 2022 Issuance of Amendment No. 271 Request for Exception from Certain Primary Containment Leak Rate Testing Requirements IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 ML22140A1612022-06-0808 June 2022 Proposed Inservice Inspection Alternative RR5-01 Revision 1 ML22147A1122022-06-0101 June 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022301 ML22111A1382022-05-13013 May 2022 Proposed Inservice Testing Alternative RS-01, Revision 0 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information ML22090A2892022-04-0101 April 2022 John Larson'S Invitation to Participate in the 8th Nuclear Regulatory Commission'S Workshop on Vendor Oversight ML22045A0012022-03-31031 March 2022 Proposed Inservice Inspection Alternative RI5- 02 Revision 3 IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 ML21350A0582021-12-21021 December 2021 Withdrawal of an Amendment Request ML21340A2362021-12-20020 December 2021 Issuance of Amendment No. 270 Adoption of Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements 2024-01-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval ML1213905112012-05-18018 May 2012 Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval ML1213205752012-05-11011 May 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval 2024-01-04
[Table view] |
Text
OffiCIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 SUB.IECT: COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: CORE PLATE HOLD DOWN BOLT STRESS ANALYSIS (TAC NO. ME9550)
Dear Mr. Limpias:
By letter dated January 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12031A248), the Nebraska Public Power District (NPPD, the licensee), submitted a GE-Hitachi Nuclear Energy (GEH) proprietary report, NEDC-33674P,
- Cooper Nuclear Station Core Plate Bolt Stress Analysis," Revision 0, October 2011 (non-proprietary version designated as NEDO-33674, Revision 0, available at ADAMS Accession No. ML12031A249). This report was submitted in accordance with License Renewal Commitment NLS2009100-1, as documented in NUREG-1944, "Safety Evaluation Report Related to the License Renewal of Cooper Nuclear Station,* September 2010 (ADAMS Accession No. ML103070009), whereby the licensee committed to perform an analysis of the CNS core plate rim bolts to demonstrate the adequacy of the bolts conSidering the loss of bolt pre-load experienced during the period of extended operation and submit this analysis at least 2 years prior to entering the period of extended operation.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided and determined that additional information is required in order to complete the review. The requests for additional information (RAls) were transmitted via e-mail April 4 and 19,2013,to Mr. Edward McCutchen of your staff. As discussed with Mr. McCutchen and others of your staff in a telephone call on May 9 and 17, 2013, the licensee will respond to the RAls within 45 days of receipt of this letter. The non-proprietary RAls are provided in Enclosure 1 and the proprietary RAls are provided in Enclosure 2.
Enclosure 2 to this letter contains Proprietary Information. When separated from Enclosure 2, this letter is DECONTROLLED.
OFFICIAL USE ONLY PROPRIETARY INFORMATION JuJ
OFFICIAL USE ONLY - PROPRIETARY INFORMATION If you have any questions, please contact me at 301-415-1377 or via e-mail at Lynnea.Wilkins@nrc.gov.
2r_e.-IY_'-+-7'".;;n.
.. '
nnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. RAI (non-proprietary)
- 2. RAI (proprietary) cc w/Enclosure 1: Distribution via Listserv OFFICIAL UBi ONLY PROPRIETARY INFORMATION cJ!. CAl
REQUEST FOR ADDITIONAL INFORMATION CORE PLATE HOLD DOWN BOLT STRESS ANALYSIS NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298 By letter dated January 16, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12031A248), the Nebraska Public Power District (NPPD, the licensee), submitted a GE-Hitachi Nuclear Energy (GEH) proprietary report, NEDC-33674P, "Cooper Nuclear Station Core Plate Bolt Stress Analysis," Revision 0, October 2011 (non-proprietary version designated as NEDO-33674, Revision 0, available at ADAMS Accession No. ML12031A249). This report was submitted in accordance with License Renewal Commitment NLS20091 00-1 , as documented in NUREG-1944, "Safety Evaluation Report Related to the License Renewal of Cooper Nuclear Station," dated September 2010 (ADAMS Accession No. ML103070009), whereby the licensee committed to perform an analysis of the CNS core plate rim bolts to demonstrate the adequacy of the bolts considering the loss of bolt pre-load experienced during the period of extended operation (PEO) and submit this analysis at least 2 years prior to entering the PEO.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided and determined that the following additional information is required in order to complete the review:
- 1. The example stress analysis provided in the Boiling Water Reactor Vessel and Internals Project (BWRVIP)-25, "BWR Core Plate Inspection and Flaw Evaluation Guidelines," is based on an elastic finite element analysis of the core plate and core plate hold down bolts. The information provided in NEDC-33674P, Revision 0, does not state what type of analysis was performed to demonstrate that the CNS core plate hold down bolts (core plate bolts) will remain structurally adequate throughout the PEO, conSidering a potential loss of preload. Please confirm that the stress analyses performed in NEDC-33674P are consistent with the approach assumed in BWRVIP-25 (Le., elastic finite element analysis).
- 2. Section 2.0 of NEDC-33674P notes that a portion of the CNS plant-specific data was not available for this analysis and, subsequently, scaled data from Appendix A of BWRVIP-25 was used in lieu of plant-specific data. Please state what CNS plant specific data was not available and what corresponding data was used from BWRVIP-25. Further, please provide a technical justification demonstrating that the alternative data provides a sound basis for determining that the core plate bolts will remain structurally adequate during the PEO.
Enclosure 1
- 2
- 3. Section 7.1 of NEDC-33674P discusses the preload which was accounted for in the CNS core plate bolt stress analyses. This section notes that the original preload for each bolt was 300 plus or minus 25 foot-pound force (ft-Ibf). However, no references are provided regarding the basis for this value. Please provide the basis for the value of the preload assumed in this analysis.
- 4. Section 8.1 of NEDC-33674P notes that the analysis performed for CNS core plate bolts calculate the shear loads on the core plate aligner pins using a different method than that used in BWRVIP-25 due to the variance in aligner pin configurations. Please describe the method used to calculate the shear loads for the CNS core plate aligner pins and provide a technical justification for this deviation from BWRVIP-25, which demonstrates that the alternative method provides an accurate means to evaluate the shear stresses imposed on the aligner pins.
- 5. Section 8.1 of NEDC-33674P provides the results of the stress analyses of the CNS core plate bolts for three distinct scenarios. For each scenario, the bolt stress levels were compared against applicable allowable stress values prescribed by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
depending on the service level considered (Le., Normal, Upset, Emergency or Faulted).
The construction of the core plate results in an uneven distribution of the resultant horizontal and vertical loads supported by the core plate bolts. However, the results presented in Section 8.1 of NEDC-33674P do not specify whether these results apply to the limiting CNS core plate bolt(s). Please confirm that the results presented in this section of NEDC-33674P correspond to the limiting core plate bolt(s) (Le., those which support the greatest horizontal andlor vertical loads) and demonstrate that these limiting core plate bolt(s) meet the applicable ASME Code allowable stress values. If the results presented in NEDC-33674P do not correspond to the limiting core plate bolts, please present the results of the stress analyses for the limiting core plate bolt(s) which demonstrate that the stresses induced in the limiting core plate bolts meet the applicable ASME Code allowable stress values.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION ~
- 2 If you have any questions, please contact me at 301-415-1377 or via e-mail at Lynnea.Wilkins@nrc.gov.
Sincerely, IRA!
Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosures:
- 1. RAI (non-proprietary)
- 2. RAI (proprietary) cc w/Enclosure 1: Distribution via Listserv DISTRIBUTION:
PUBLIC LPUVrlf RidsAcrsAcnw_MailCTR Resource RidsNrrDeEmcb Resource RidsNrrDeEvib Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMCooper Resource RidsRgn4MailCenter Resource WJessup, NRR/DE/EMCB DWidrevitz, NRR/DE/EVIB ADAMS Accession No.: OUO(Proprietaryj; ML13133A077; Redacted ML13133A080 OFFICE NRR/DORLlLPL4/PM NRRlDORLlLPL4/LA NRR/DElEMCB/BC NAME LWilkins JBurkhardt AMcMurtray DATE 5/16/13 5/13/13 3/27/13 OFFICE NRRlDE/EVIB/BC NRRlDORLlLPL4/BC NRR/DORLlLPL4/PM NAME SRosenberg MMarkley LWilkins !
DATE 3/27/13 5/24/13 5/24/13 i OFFICIAL RECORD COpy OFFICIAL USE ONLY PROPRIETARY INFORMATION c/LJ