IR 05000298/2023003 | 2 November 2023 | Integrated Inspection Report 05000298/2023003 | Reactor Vessel Water Level Stroke time Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Earthquake Fire Protection Program Power change Downpower |
IR 05000298/2023401 | 1 November 2023 | Cyber Security Report 05000298/2023401 Public | Cyber Security Affidavit |
IR 05000298/2024301 | 1 September 2023 | Notification of NRC Initial Operator Licensing Examination 05000298/2024301 | |
IR 05000298/2023005 | 21 August 2023 | Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter | Fitness for Duty Cyber Security |
IR 05000298/2023002 | 8 August 2023 | Integrated Inspection Report 05000298/2023002 | Enforcement Discretion Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Downpower Siren |
IR 05000298/2023402 | 3 August 2023 | NRC Security Inspection Report 05000298/2023402 | Fitness for Duty |
IR 05000298/2023420 | 1 August 2023 | Security Baseline Inspection Report 05000298/2023420 | |
IR 05000298/2023010 | 17 May 2023 | Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 | High Radiation Area Enforcement Discretion Significance Determination Process |
IR 05000298/2023403 | 4 May 2023 | Security Baseline Inspection Report 05000298/2023403 | |
IR 05000298/2023001 | 17 April 2023 | Integrated Inspection Report 05000298/2023001 | Internal Flooding Enforcement Discretion Functionality Assessment Operability Determination Fire Protection Program Power change Failure to Scram |
ML23060A158 | 8 March 2023 | Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 | Commercial Grade Dedication |
IR 05000298/2022006 | 1 March 2023 | Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000298/2022004 | 30 January 2023 | Integrated Inspection Report 05000298/2022004 | Shutdown Margin Safety Limit Minimum Critical Power Ratio High Radiation Area Fire Barrier Water Inventory Control Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Scram Discharge Volume Operability Determination Severe Accident Management Guideline Liquid penetrant Fire Protection Program Power change |
IR 05000298/2022011 | 23 December 2022 | License Renewal Phase 4 Inspection Report 05000298/2022011 | Coatings Nondestructive Examination Aging Management License Renewal |
IR 05000298/2022003 | 27 October 2022 | Integrated Inspection Report 05000298/2022003 | Offsite Dose Calculation Manual Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Fire Watch Power change |
IR 05000298/2022302 | 20 October 2022 | NRC Initial Operator Licensing Examination Approval 05000298/2022302 | |
ML22276A156 | 5 October 2022 | Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information | Commercial Grade Dedication |
IR 05000298/2022402 | 29 September 2022 | NRC Security Inspection Report 05000298/2022402 (Full Report) | |
IR 05000298/2022005 | 18 August 2022 | Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
IR 05000298/2022301 | 10 August 2022 | NRC Examination Report 05000298/2022301 | Job Performance Measure |
IR 05000298/2022002 | 28 July 2022 | Integrated Inspection Report 05000298/2022002 | Packing leak Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Corrosion bonding Operability Determination Fire Protection Program Scaffolding Power change Downpower Siren |
IR 05000298/2022401 | 29 June 2022 | Security Baseline Inspection Report 05000298/2022401 | |
IR 05000298/2022403 | 28 June 2022 | Security Baseline Inspection Report 05000298/2022403 | Affidavit |
IR 05000298/2022010 | 16 June 2022 | Triennial Fire Protection Inspection Report 05000298/2022010 | Safe Shutdown Probabilistic Risk Assessment Fire impairment Aging Management Fire Protection Program Scaffolding |
IR 05000298/2022001 | 28 April 2022 | Integrated Inspection Report 05000298/2022001 | Ultimate heat sink Internal Flooding Functionality Assessment Operability Determination Fire Protection Program Downpower |
IR 05000298/2022404 | 13 April 2022 | Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) | Affidavit |
ML22084A603 | 4 April 2022 | Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information | Temporary Modification |
IR 05000298/2021006 | 2 March 2022 | Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) | Fitness for Duty Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000298/2021004 | 24 January 2022 | Integrated Inspection Report 05000298/2021004 | High Radiation Area Internal Flooding Temporary Modification Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000298/2021003 | 4 November 2021 | Integrated Inspection Report 05000298/2021003 | Enforcement Discretion Temporary Modification Cyber Security Functionality Assessment FLEX Process Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower |
IR 05000298/2021011 | 19 October 2021 | CNS2021011 TI194 RPT Jfd, Cooper Nuclear Station - Temporary Instruction 2515/194 Report 05000298/2021011 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition Time Critical Operator Action Coronavirus COVID-19 |
IR 05000298/2021402 | 12 October 2021 | Security Baseline Inspection Report 05000298/2021402 | Fitness for Duty Job Performance Measure Coronavirus COVID-19 |
IR 05000298/2021005 | 1 September 2021 | CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) | Cyber Security License Renewal Exemption Request Power-Operated Valves COVID-19 |
IR 05000298/2021002 | 9 August 2021 | Integrated Inspection Report 05000298/2021002 | Safe Shutdown Internal Flooding Fire impairment Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower Siren |
IR 05000298/2021301 | 29 July 2021 | NRC Retake Examination Report 05000298/2021301 | Job Performance Measure |
IR 05000298/2021012 | 27 July 2021 | Biennial Problem Identification and Resolution Inspection Report 05000298/2021012 | Fire Barrier Condition Adverse to Quality Coronavirus COVID-19 |
IR 05000298/2021010 | 7 June 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010 | Stroke time Past operability Aging Management Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program |
IR 05000298/2021001 | 5 May 2021 | CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001 | Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower Siren |
IR 05000298/2021401 | 4 May 2021 | Security Baseline Inspection Report 05000298/2021401 | Fitness for Duty |
IR 05000298/2020006 | 3 March 2021 | Annual Assessment Letter for Cooper (Report 05000298/2020006) | Fitness for Duty Operator Manual Action Open Phase Condition License Renewal Exemption Request COVID-19 |
IR 05000298/2020004 | 3 February 2021 | Integrated Inspection Report 05000298/2020004 | High Radiation Area Half scram Non-Destructive Examination Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment FLEX Annual Radioactive Effluent Release Report Foreign Material Exclusion Operability Determination Moisture barrier Coronavirus COVID-19 Fire Protection Program Siren |
ML21026A311 | 27 January 2021 | Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information | Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Large early release frequency |
IR 05000298/2020302 | 18 November 2020 | NRC Examination Report 05000298/2020302 | Shutdown Margin Job Performance Measure |
IR 05000298/2020003 | 2 November 2020 | Integrated Inspection Report 05000298/2020003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2020001 | Safe Shutdown Packing leak High Radiation Area Fire Barrier Enforcement Discretion Temporary Modification Emergency Lighting Functionality Assessment Locked High Radiation Area FLEX Aging Management Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower |
IR 05000298/2020420 | 5 October 2020 | Cover Letter for Cooper Nuclear Station - Security Inspection Report 05000298/2020420 2020 | Affidavit |
IR 05000298/2020411 | 17 September 2020 | Security Baseline Inspection Report 05000298/2020411 | |
IR 05000298/2020301 | 15 September 2020 | NRC Examination Report 05000298/2020301 | |
IR 05000298/2020005 | 1 September 2020 | Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2020005) | Fitness for Duty Enforcement Discretion Operator Manual Action Cyber Security Open Phase Condition Exemption Request Coronavirus |
IR 05000298/2020002 | 22 July 2020 | Integrated Inspection Report 05000298/2020002 | Half scram Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower Coast down |
IR 05000298/2020410 | 21 July 2020 | Security Baseline Inspection Report 05000298/2020410 | Enforcement Discretion |