Letter Sequence RAI |
---|
EPID:L-2021-LLR-0045, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 (Open) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) ML17276B3122017-10-0303 October 2017 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RI5-03, RR5-02, RR5-03, RI5-02, and RI5-01 ML17254A0202017-09-0707 September 2017 NRR E-mail Capture - Acceptance Review - Cooper Nuclear Station - License Amendment Request to Adopt TSTF-542 - OPDRVs ML17142A3842017-05-22022 May 2017 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request No. RI-21, Revision 1 2024-01-10
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval ML1213905112012-05-18018 May 2012 Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval ML1213205752012-05-11011 May 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval 2024-01-04
[Table view] |
Text
From: Wengert, Thomas Sent: Wednesday, November 10, 2021 1:37 PM To: Dewhirst, Linda R.
Cc: Van Der Kamp, David W.; Forland, Thomas J.; Dixon-Herrity, Jennifer; Tsao, John
Subject:
Cooper - Final RAI RE: Alternative Request RI5-02 Revision 3 (EPID L-2021-LLR-0045)
Attachments: Cooper - Final RAI Regarding Alternative Request RI5-02 Rev 3.pdf On October 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) staff sent Nebraska Public Power District (NPPD) the draft Request for Additional Information (RAI) identified below for Cooper Nuclear Station (Cooper). This RAI relates to Relief Request (RR) RI5-02, Revision 3, concerning the inspection of Cooper reactor vessel interior surfaces, reactor interior attachments, and core support structures using Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines as an alternative.
On November 10, 2021, the NRC and NPPD staffs held a conference call to clarify the draft RAI. At the conclusion of the call, NPPD informed the NRC staff that the information requested was understood and that no additional clarification of the RAI was necessary. A publicly available version of this final RAI (attached, with Draft removed) will be placed in the NRCs Agencywide Documents Access and Management System (ADAMS). As agreed, please provide a response to this RAI within 30 days of this correspondence.
From: Wengert, Thomas Sent: Friday, October 29, 2021 7:47 AM To: Dewhirst, Linda R. <lrdewhi@nppd.com>
Cc: Van Der Kamp, David W. <dwvande@nppd.com>; Forland, Thomas J. <tjforla@nppd.com>; Dixon-Herrity, Jennifer <Jennifer.Dixon-Herrity@nrc.gov>
Subject:
Cooper - Draft RAI RE: Alternative Request RI5-02 Revision 3 (EPID L-2021-LLR-0045)
By letter dated June 21, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21172A301), Nebraska Public Power District (the licensee) requested an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for inservice inspection (ISI) of reactor vessel internal components at Cooper Nuclear Station (Cooper). The licensee submitted Relief Request (RR) RI5-02, Revision 3, concerning the inspection of Cooper reactor vessel interior surfaces, reactor interior attachments, and core support structures using Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines as an alternative. The relief request is applicable for the fifth 10-year ISI interval, which began on April 1, 2016, and will end on February 28, 2026.
The NRC staff reviewed the submittal and determined that additional information, as described in the attached request for additional information (RAI), is required for the staff to complete its review of this application. This RAI is identified as draft at this time to confirm your understanding of the information that the NRC staff needs to complete the evaluation. Please let me know if you would like to have a call with the NRC staff to clarify this request. If the request for information is understood, please respond to this RAI within 30 days of the date of this request.
Tom Wengert Project Manager - Cooper Nuclear Station NRR/DORL/LPL4 (301) 415-4037
Hearing Identifier: NRR_DRMA Email Number: 1416 Mail Envelope Properties (MN2PR09MB54494CE387EE4BA3A7ED86AB8F939)
Subject:
Cooper - Final RAI RE: Alternative Request RI5-02 Revision 3 (EPID L-2021-LLR-0045)
Sent Date: 11/10/2021 1:37:04 PM Received Date: 11/10/2021 1:37:00 PM From: Wengert, Thomas Created By: Thomas.Wengert@nrc.gov Recipients:
"Van Der Kamp, David W." <dwvande@nppd.com>
Tracking Status: None "Forland, Thomas J." <tjforla@nppd.com>
Tracking Status: None "Dixon-Herrity, Jennifer" <Jennifer.Dixon-Herrity@nrc.gov>
Tracking Status: None "Tsao, John" <John.Tsao@nrc.gov>
Tracking Status: None "Dewhirst, Linda R." <lrdewhi@nppd.com>
Tracking Status: None Post Office: MN2PR09MB5449.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2902 11/10/2021 1:37:00 PM Cooper - Final RAI Regarding Alternative Request RI5-02 Rev 3.pdf 180818 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE REQUEST RI5-02, REVISION 3 FOR FIFTH 10-YEAR INSERVICE INSPECTION INTERVAL NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298 By letter dated June 21, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21172A301), Nebraska Public Power District (the licensee) requested an alternative to certain requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) for inservice inspection (ISI) of reactor vessel internal components at Cooper Nuclear Station (Cooper). The licensee submitted Relief Request (RR) RI5-02, Revision 3, concerning the inspection of Cooper reactor vessel interior surfaces, reactor interior attachments, and core support structures using Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines as an alternative. The relief request is applicable for the fifth 10-year ISI interval, which began on April 1, 2016, and will end on February 28, 2026.
In RI5-02, Revision 3, the licensee proposed, in part, an alternative to use BWRVIP-94, Revision 4, Program Implementation Guide, dated November 2020 (ADAMS Accession No. ML20345A248). BWRVIP-94, Revision 4 has not been reviewed or endorsed by the NRC staff.
Regulatory Basis The ISI of ASME Code Class 1, 2, and 3 components is to be performed in accordance with Section XI of the ASME Code and applicable edition and addenda as required by Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(g), Preservice and inservice inspection requirements, except where specific relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i), Impractical ISI requirements: Granting of relief.
Pursuant to 10 CFR 50.55a(z), Alternatives to codes and standards requirements, alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC if (1) the proposed alternatives would provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), Inservice inspection standards requirement for operating plants, ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(a)(1)(ii),
ASME Boiler and Pressure Vessel Code,Section XI, 18 months prior to the start of the 120-1
month interval, subject to the conditions listed in 10 CFR 50.55a(b)(2), Conditions on ASME BPV Code,Section XI.
To complete its review, the U.S. Nuclear Regulatory Commission (NRC) staff requests the following additional information.
RAI-1
Issue By letter dated February 17, 2016 (ADAMS Accession No. ML16034A479), the NRC authorized the use of the original relief request RI5-02 (Revision 0), which contains inspection requirements for reactor vessel internal components based on guidance in various BWRVIP topical reports at Cooper. By letter dated July 31, 2018 (ADAMS Accession No. ML18183A325), the NRC authorized the use of RR RI5-02, Revision 1, which provided an updated inspection history to include the fall 2016 refueling outage. By letter dated March 19, 2020 (ADAMS Accession No. ML20077L339), the NRC authorized the use of RR RI5-02, Revision 2, which requested to use BWRVIP-41, Revision 4-A and BWRVIP-94, Revision 3.
The current proposed RR RI5-02, Revision 3 requests to use BWRVIP-25, Revision 1-A and BWRVIP-94, Revision 4. Relief Request RI5-02, Revision 3 does not contain all of the information that is typically contained in a relief request, such as affected components and applicable ASME Code requirements that were provided in Revision 0. As submitted, RI5-02, Revision 3 is not a standalone, independent document.
Request Provide additional information for RI5-02, Revision 3 that includes all of the information in Revisions 0, 1 and 2, such that RI5-02, Revision 3 is a standalone, independent document.
RAI-2
Issue Section 3.5, page 3-2, of BWRVIP-94, Revision 4, states in part that In cases where inspection recommendations cannot be implemented and that situation is stated in the BWRVIP document transmitted to the NRC, the BWRVIP transmittal of the document to the NRC is considered the notification to the NRC that a BWRVIP recommendation is not implemented. In such cases, utility notification to the NRC is not required. It is not clear whether the licensee will notify the NRC if an inspection recommendation will not be implemented.
Request Discuss whether the licensee will notify the NRC if an inspection recommendation at Cooper cannot be implemented, if RR RI-02 is authorized.
2
RAI-3
Issue Section 3.5, Page 3-2, of BWRVIP-94, Revision 4, states in part that Deviations from BWRVIP guidelines do not need to be submitted to the NRC for approval unless specifically required by the BWRVIP guideline document or other utility commitments Appendix B, General Consideration Section, Item No. 4 of BWRVIP-94, Revision 4 states in part that In no case shall any deviation to the vessel and internals program allow a change to a plants licensing basis without the approvals required by regulation Based on the above, the NRC staff requests clarification regarding deviations from BWRVIP guidance.
Request Clarify the specific circumstances under which the licensee would submit deviations to the NRC for approval. Provide specific examples of deviations needing and not needing prior NRC approval. The examples can be hypothetical if actual cases do not exist.
RAI-4
Issue Appendix B, Introduction Section of BWRVIP-94, Revision 4, states in part that Deviation dispositions do not need to be submitted to the NRC. However, the NRC shall be notified of any deviation from BWRVIP guidelines transmitted to the NRC as described in Section 3.5 Appendix B, General Consideration Section, Item No. 2 of BWRVIP-94, Revision 4 states in part that For planned deviation dispositions, the utility shall notify the NRC and the BWRVIP within 45 days of the utility executive concurrence with the deviation disposition Based on the above two statements, it is not clear to the NRC staff whether deviation dispositions will or will not be submitted to the NRC.
Request Clarify the specific circumstances or criteria for when the licensee would notify the NRC of deviations and deviation dispositions.
RAI-5
Issue Section 3.5, page 3-2 bottom and top of page 3-3, of BWRVIP-94, Revision 4, states in part that Licensees shall forward a copy of the IVVI [in-vessel visual inspection] and volumetric final reports for reactor internals inspections provided by the utilities inspection vendors within 120 days following completion of an outage It is not clear to the NRC staff where or to whom licensees will forward a copy of the inspection report, as indicated in this quoted statement.
3
Request Clarify whether Cooper will submit the IVVI report and volumetric final reports to the NRC (i.e.,
as part of the routine 90-day inservice inspection report that licensees submit to the NRC after the completion of refueling outages for information in accordance with the ASME Code,Section XI, IWA-6230, Owners Activity Report (Forms OAR-1 and/or NIS-1, or a separate submittal).
RAI-6
Issue Section 3.5, page 3-3, of BWRVIP-94, Revision 4, states in part that Flaw evaluations performed in accordance with the guidance in BWRVIP reports for the acceptance of inspection results do not require transmittal to, or approval by, the NRC The code of record for the fifth ISI interval at Cooper is the 2007 Edition and 2008 Addenda of the ASME Code,Section XI.
Subarticles IWB-3134(b), IWB-3144(b), and IWB-3640 of the 2007 Edition specify that analytical evaluation of inspection results shall be submitted to the regulatory authority (i.e., the NRC).
The above statement in BWRVIP-94, Revision 4 appears to conflict with the requirements of the ASME Code,Section XI.
Request Considering the above ASME Code,Section XI requirements, clarify whether Cooper will transmit the flaw evaluations to the NRC after the ISI is performed on reactor vessel internal components.