Category:E-Mail
MONTHYEARML24157A0122024-06-0404 June 2024 NRR E-mail Capture - Cooper - Acceptance Review - License Amendment Request (LAR) to Revise TS Table 3.3.2.1-1 Minimum Critical Power Ratio (MCPR) ML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24081A0372024-03-21021 March 2024 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR to Modify Allowable Value for HPCI Low Flow ML24124A0592024-02-22022 February 2024 May 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions 2024-06-04
[Table view] Category:Inspection Plan
MONTHYEARIR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) ML21305B8012021-11-0202 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection 05000298/2022001 and Request for Information IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) ML21217A1182021-08-0505 August 2021 Notification of Inspection (NRC Inspection Report 05000298/2021004) and Request for Information ML21083A2832021-03-24024 March 2021 Ti 2515/194 Inspection Documentation Request ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI IR 05000298/20200052020-09-0101 September 2020 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2020005) IR 05000298/20190062020-03-0303 March 2020 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2019006) IR 05000298/20190052019-08-30030 August 2019 Updated Inspection Plan for Cooper Nuclear Station - Report 05000298/2019005 IR 05000298/20180062019-03-0404 March 2019 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2018006) IR 05000298/20180052018-08-31031 August 2018 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2018005) IR 05000298/20170062018-03-0101 March 2018 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006) ML18023A1102018-01-23023 January 2018 CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and Request IR 05000298/20170052017-08-28028 August 2017 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005) IR 05000298/20160062017-03-0101 March 2017 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2016006) IR 05000298/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2016401) ML16242A3292016-08-31031 August 2016 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20150062016-03-0202 March 2016 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2015006) IR 05000298/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2015005) IR 05000298/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2015401) ML15183A3602015-07-0202 July 2015 Notification of Inspection (NRC Inspection Report 05000298/2015003 and Request for Information ML14364A1532014-12-30030 December 2014 Notification of NRC Triennial Heat Sink Performance IR 05000298/2015001 and Request for Information IR 05000298/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2014006) IR 05000298/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2014402) IR 05000298/20130012014-03-0404 March 2014 Annual Assessment Letter for the Cooper Nuclear Station (Report 05000298/2013001) IR 05000298/20130062013-09-0303 September 2013 Mid-cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-13-006) IR 05000298/20128012013-03-0404 March 2013 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2012801) IR 05000298/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2012006) ML12243A4372012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-12-006) IR 05000298/20120012012-03-0505 March 2012 Annual Assessment Letter for Cooper Nuclear Station (Report Number 05000298/2012001) ML1124306512011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20110012011-03-0404 March 2011 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298-11-001) ML1024305762010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station ML0906301572009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan - 2009 - Cooper Nuclear Station ML0824606182008-09-0202 September 2008 2008 Midcycle Assessment Letter Cooper Nuclear Station IR 05000298/20080012008-03-0303 March 2008 Annual Assessment Letter - Cooper Nuclear Station End of Cycle 03-03-2008, (Inspection Report 05000298-08-001) ML0724309262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Cooper IR 05000298/20070012007-03-0202 March 2007 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-07-001) ML0624306492006-08-31031 August 2006 Midcycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20060012006-03-0202 March 2006 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-06-001) ML0524300922005-08-30030 August 2005 Midcycle 2005 Performance Review and Inspection Plan - Cooper Nuclear Station 2024-08-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval 2024-04-03
[Table view] |
Text
ADAMS Accession Number: ML20315A392 Alexander, Ryan From: Alexander, Ryan Sent: Tuesday, November 10, 2020 11:55 AM To: 'Van Der Kamp, David W.'; 'Mocnik, Lawrence A.'
Cc: Haire, Mark
Subject:
REQ: Kick-Off Call & RFI Provided for Cooper "Roll-Back" EP Program Inspection (Week of January 11, 2021)
Attachments: COOPER Jan 2021 EP Program Inspection RFI.pdf Importance: High REVISED DOCUMENT ATTACHMENT - Please disregard and dispose of prior attachment in lieu of the attachment to this EMAIL David/Larry:
Thank you for providing the RFI response for the EP Performance Indicator Verification inspection that I will complete in office next week (Nov 1619).
As previously discussed and in consideration of the stations and NRCs schedules in this 4Q/2020, with EP Exercise Inspection moved from CY2020 to May 2021, we were not able to fully rollback the EP Program Inspection at Cooper into CY2020, but instead to January 2021. In that we are now approximately 2 months from the partially rolledback EP Program Inspection at Cooper (week of January 11, 2021), the purpose of this email is to twofold:
- 1. Request that we hold an inspection KickOff Call for the January 2021 EP Program Inspection this upcoming week with EP and Regulatory Affairs. Perhaps we could hold this discussion as an add on following the Exit briefing for the PI Verification inspection on Thursday afternoon 11/19 (after Sr. Management has left the meeting), or some other mutually acceptable time early the following week (Mon or Tues BEFORE Thanksgiving).
- 2. While I normally wait until after the KickOff Call to send the Request for Information (RFI) in support of the EP Program inspection, because of the upcoming holidays, I wanted to give the station as much time as possible to start gathering the materials requested. So attached to this email is also the RFI that we will discuss during the KickOff call. As appropriate, the station is free to leverage information recently provided for the EP PI Verification Inspection RFI response in compiling this additional RFI response - just be sure to maintain the inspectors access to the previously provided material(s) in the online portal through the date of the EP Program Inspection.
In the attached, I listed a requested date for the materials to be provided in electronic format using the online document portal of the stations choice by COB on Thursday, December 31, 2020. This date chosen provides more than the typical ~4 weeks for the station to compile and provide the materials in support of my inspection preparation, in recognizing that station staff will be taking time off to spend with family during the upcoming Holidays. If the station requires additional time for some of the materials requested, we can discuss this during the KickOff call.
This letter/email does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 31500011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
1
This email and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you have any questions regarding the desire for the kickoff call please do not hesitate to contact me via phone upon receipt of this email or anytime in the next couple weeks - my NRC desk line is forwarded to my mobile device.
Thank you, Ryan D. Alexander Sr. Emergency Preparedness Inspector NRC Region IV, Div. of Reactor Safety 1600 E. Lamar Blvd, Arlington, TX 76011 Office: 8172001195 (forwarded to mobile during COVID19 PHE)
Please consider the environment before printing this email.
2
Request for Information for Biennial EP Program Inspection Docket 05000298 (CNS); Inspection Report 2021001 Inspection Procedures 71114.02, 71114.03, 71114.04, and 71114.05 Inspection Week: January 11-15, 2021 Preparation Period: January 4-8, 2021 For the preparation documents, the time period for consideration relative to since the last program inspection should be considered 1 JUNE 2019 - 31 DEC 2020 (~18 months):
- 1) 71114.02: Alert & Notification System Testing a) Copy of the current, complete FEMA-approved ANS design report and any approved modification packages b) List of all ANS changes since last program inspection including a brief change description c) Copies of primary and backup ANS testing and maintenance procedures d) If any ANS testing is to be conducted during the onsite week, please provide details on the testing and when/where it is scheduled to be conducted.
e) List of all Condition Reports related to the ANS system, sirens, etc. since the last program inspection - in sortable/searchable format
- 2) 71114.03: ERO Staffing and Augmentation Systems a) Copy of the current procedure(s) for primary and backup ERO callout methods i) Included any prior procedure(s) revisions for primary and backup ERO callout methods since the last program inspection b) Copies of the periodic/quarterly ERO callout tests since the last inspection c) Copies of all current on-shift and/or ERO staffing analyses d) List of all Condition Reports related to the ERO callout tests, procedures, etc. since the last program inspection - in sortable/searchable format
- 3) 71114.04: EAL and Emergency Plan Changes a) Copy of the 50.54(q) procedure (all revisions in effect during the time period) b) Copy of all the 50.54(q) evaluations completed during the time period c) Listing of all of the 50.54(q) screens performed during the time period d) Copy of all evaluations completed (if any) to implement compensatory measures/contingency plans to ensure E-Plan requirements continued to be met during COVID-19 Public Health Emergency, whether documented per the 50.54(q) process or some other process.
e) List of all Condition Reports related to the Emergency Plan Changes, 50.54(q) process, etc.
since the last program inspection - in sortable/searchable format
- 4) 71114.05: Maintenance of EP a) Copies of all drill reports (on- and off-site) since the last program inspection. Include any periodic/quarterly ERO drills, dress-rehearsal exercises, as well as any stand-alone E-Plan directed drills such as medical/ambulance drills, health physics sampling drills, etc., during the time period.
b) Copy of the last completed full evacuation time estimate (ETE) (circa 2012), and copies of the annual ETE surveillance reports completed since the last program inspection.
c) Copies of any internal and external assessments (except INPO assessments) during the time period. These assessments may include self-assessments and any reviews of E-Plan MOUs/LOAs.
d) Copy of any site QA audits/assessments related to emergency preparedness during the time period (have audit checklists available during the week of onsite inspection).
i) Please include all 50.54(t) program assessments during this period in this response, whether completed by QA or other entity.
e) Copy of any tracking tools being used to ensure the site is meeting/will meet the eight-year exercise cycle requirements specified in 10 CFR 50, Appendix E, Section IV.F.2.j f) Listing of Work Orders associated with corrective maintenance for E-Plan-related equipment during the time period.
g) Copies of most recently completed EP-related surveillance/readiness inventories for each of the Cooper Emergency Response Facilities (Control Room, OSC, TSC, EOF, and JIC).
h) Copy of corrective action program procedure(s) (all revisions in effect during the time period).
i) Listing of all EP Condition Reports during the time period - in sortable/searchable format
- 5) General Requests a) Copy of the current Emergency Plan.
i) Include copy(ies) of all revisions in effect during the time period.
b) Copies of all current Emergency Plan Implementing Procedures (as described in Appendix A of the Emergency Plan) in effect.
- NOTE - the IP 71151 EP Performance Indicator Inspection activities for 2Q/2019 - 2Q/2020 will be completed as an in-office inspection in November 2020, since this EP Program Inspection was not able to be fully roll-back into CY2020. Additional EP Performance Indicators (3Q/2020 - 1Q/2021) will not be inspected during this inspection, but instead are planned for inspection concurrent with the EP Exercise Inspection in May 2021.
Due to the ongoing Public Health Emergency, if possible, please make the requested materials available to the lead NRC Region IV EP Inspector (R. Alexander) in electronic format using the online document portal of the stations choice, by COB on Thursday, December 31, 2020.
This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This e-mail and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.