Email 11-10-2020 - Cooper EP Prog Insp RFI
ML20315A392
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/10/2020
From: Ryan Alexander
NRC Region 4
To: Mocnik L, Vanderkamp D
NRC Region 4
Alexander R
References
Download: ML20315A392 (5)


Text

ADAMS Accession Number: ML20315A392 Alexander, Ryan From: Alexander, Ryan Sent: Tuesday, November 10, 2020 11:55 AM To: 'Van Der Kamp, David W.'; 'Mocnik, Lawrence A.'

Cc: Haire, Mark

Subject:

REQ: Kick-Off Call & RFI Provided for Cooper "Roll-Back" EP Program Inspection (Week of January 11, 2021)

Attachments: COOPER Jan 2021 EP Program Inspection RFI.pdf Importance: High REVISED DOCUMENT ATTACHMENT - Please disregard and dispose of prior attachment in lieu of the attachment to this EMAIL David/Larry:

Thank you for providing the RFI response for the EP Performance Indicator Verification inspection that I will complete in office next week (Nov 1619).

As previously discussed and in consideration of the stations and NRCs schedules in this 4Q/2020, with EP Exercise Inspection moved from CY2020 to May 2021, we were not able to fully rollback the EP Program Inspection at Cooper into CY2020, but instead to January 2021. In that we are now approximately 2 months from the partially rolledback EP Program Inspection at Cooper (week of January 11, 2021), the purpose of this email is to twofold:

1. Request that we hold an inspection KickOff Call for the January 2021 EP Program Inspection this upcoming week with EP and Regulatory Affairs. Perhaps we could hold this discussion as an add on following the Exit briefing for the PI Verification inspection on Thursday afternoon 11/19 (after Sr. Management has left the meeting), or some other mutually acceptable time early the following week (Mon or Tues BEFORE Thanksgiving).
2. While I normally wait until after the KickOff Call to send the Request for Information (RFI) in support of the EP Program inspection, because of the upcoming holidays, I wanted to give the station as much time as possible to start gathering the materials requested. So attached to this email is also the RFI that we will discuss during the KickOff call. As appropriate, the station is free to leverage information recently provided for the EP PI Verification Inspection RFI response in compiling this additional RFI response - just be sure to maintain the inspectors access to the previously provided material(s) in the online portal through the date of the EP Program Inspection.

In the attached, I listed a requested date for the materials to be provided in electronic format using the online document portal of the stations choice by COB on Thursday, December 31, 2020. This date chosen provides more than the typical ~4 weeks for the station to compile and provide the materials in support of my inspection preparation, in recognizing that station staff will be taking time off to spend with family during the upcoming Holidays. If the station requires additional time for some of the materials requested, we can discuss this during the KickOff call.

This letter/email does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 31500011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

1

This email and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you have any questions regarding the desire for the kickoff call please do not hesitate to contact me via phone upon receipt of this email or anytime in the next couple weeks - my NRC desk line is forwarded to my mobile device.

Thank you, Ryan D. Alexander Sr. Emergency Preparedness Inspector NRC Region IV, Div. of Reactor Safety 1600 E. Lamar Blvd, Arlington, TX 76011 Office: 8172001195 (forwarded to mobile during COVID19 PHE)

Please consider the environment before printing this email.

2

Request for Information for Biennial EP Program Inspection Docket 05000298 (CNS); Inspection Report 2021001 Inspection Procedures 71114.02, 71114.03, 71114.04, and 71114.05 Inspection Week: January 11-15, 2021 Preparation Period: January 4-8, 2021 For the preparation documents, the time period for consideration relative to since the last program inspection should be considered 1 JUNE 2019 - 31 DEC 2020 (~18 months):

1) 71114.02: Alert & Notification System Testing a) Copy of the current, complete FEMA-approved ANS design report and any approved modification packages b) List of all ANS changes since last program inspection including a brief change description c) Copies of primary and backup ANS testing and maintenance procedures d) If any ANS testing is to be conducted during the onsite week, please provide details on the testing and when/where it is scheduled to be conducted.

e) List of all Condition Reports related to the ANS system, sirens, etc. since the last program inspection - in sortable/searchable format

2) 71114.03: ERO Staffing and Augmentation Systems a) Copy of the current procedure(s) for primary and backup ERO callout methods i) Included any prior procedure(s) revisions for primary and backup ERO callout methods since the last program inspection b) Copies of the periodic/quarterly ERO callout tests since the last inspection c) Copies of all current on-shift and/or ERO staffing analyses d) List of all Condition Reports related to the ERO callout tests, procedures, etc. since the last program inspection - in sortable/searchable format
3) 71114.04: EAL and Emergency Plan Changes a) Copy of the 50.54(q) procedure (all revisions in effect during the time period) b) Copy of all the 50.54(q) evaluations completed during the time period c) Listing of all of the 50.54(q) screens performed during the time period d) Copy of all evaluations completed (if any) to implement compensatory measures/contingency plans to ensure E-Plan requirements continued to be met during COVID-19 Public Health Emergency, whether documented per the 50.54(q) process or some other process.

e) List of all Condition Reports related to the Emergency Plan Changes, 50.54(q) process, etc.

since the last program inspection - in sortable/searchable format

4) 71114.05: Maintenance of EP a) Copies of all drill reports (on- and off-site) since the last program inspection. Include any periodic/quarterly ERO drills, dress-rehearsal exercises, as well as any stand-alone E-Plan directed drills such as medical/ambulance drills, health physics sampling drills, etc., during the time period.

b) Copy of the last completed full evacuation time estimate (ETE) (circa 2012), and copies of the annual ETE surveillance reports completed since the last program inspection.

c) Copies of any internal and external assessments (except INPO assessments) during the time period. These assessments may include self-assessments and any reviews of E-Plan MOUs/LOAs.

d) Copy of any site QA audits/assessments related to emergency preparedness during the time period (have audit checklists available during the week of onsite inspection).

i) Please include all 50.54(t) program assessments during this period in this response, whether completed by QA or other entity.

e) Copy of any tracking tools being used to ensure the site is meeting/will meet the eight-year exercise cycle requirements specified in 10 CFR 50, Appendix E, Section IV.F.2.j f) Listing of Work Orders associated with corrective maintenance for E-Plan-related equipment during the time period.

g) Copies of most recently completed EP-related surveillance/readiness inventories for each of the Cooper Emergency Response Facilities (Control Room, OSC, TSC, EOF, and JIC).

h) Copy of corrective action program procedure(s) (all revisions in effect during the time period).

i) Listing of all EP Condition Reports during the time period - in sortable/searchable format

5) General Requests a) Copy of the current Emergency Plan.

i) Include copy(ies) of all revisions in effect during the time period.

b) Copies of all current Emergency Plan Implementing Procedures (as described in Appendix A of the Emergency Plan) in effect.

    • NOTE - the IP 71151 EP Performance Indicator Inspection activities for 2Q/2019 - 2Q/2020 will be completed as an in-office inspection in November 2020, since this EP Program Inspection was not able to be fully roll-back into CY2020. Additional EP Performance Indicators (3Q/2020 - 1Q/2021) will not be inspected during this inspection, but instead are planned for inspection concurrent with the EP Exercise Inspection in May 2021.

Due to the ongoing Public Health Emergency, if possible, please make the requested materials available to the lead NRC Region IV EP Inspector (R. Alexander) in electronic format using the online document portal of the stations choice, by COB on Thursday, December 31, 2020.

This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This e-mail and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.