MONTHYEARML24157A0122024-06-0404 June 2024 NRR E-mail Capture - Cooper - Acceptance Review - License Amendment Request (LAR) to Revise TS Table 3.3.2.1-1 Minimum Critical Power Ratio (MCPR) ML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24081A0372024-03-21021 March 2024 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR to Modify Allowable Value for HPCI Low Flow ML24124A0592024-02-22022 February 2024 May 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions 2024-06-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval 2024-04-03
[Table view] |
Text
ADAMS Accession No. ML21109A222 From: Correll, Brian To: Forland, Thomas J.
Cc: Agrawal, Ami
Subject:
RFI for Problem Identification & Resolution Inspection Date: Thursday, April 15, 2021 3:25:00 PM Attachments: 2021 CNS PIR Request for Information.pdf Mr. Forland, The purpose of this e-mail is to transmit a request for information (RFI) in support of the upcoming Problem Identification & Resolution (PI&R) inspection at the Cooper Nuclear Station, scheduled for the weeks of June 14 and June 28, 2021. This inspection will be conducted using the biennial portion of the NRC Inspection Procedure 71152.
To support the preparation review for this inspection, I request that the material described in the attachment be available for our review by June 2, 2021. If you have any questions or concerns regarding this request, please contact me using the contact information below.
This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 31500011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosures will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Thank you, Brian Correll Reactor Inspector NRC Region IV, Div. of Reactor Safety 1600 E. lamar Blvd, Arlington, Tx 76011 817-200-1565
Information Request Biennial Problem Identification and Resolution Inspection Cooper Nuclear Station April 15, 2021 Inspection Report: 50-298/2021012 Inspection Dates: June 14 - 18 & June 28 - July 2, 2021 This inspection will cover the period from July 1, 2019, through June 13, 2021. All requested information is limited to this period or to the date of this request unless otherwise specified. To the extent possible, the requested information should be provided electronically in word-searchable Adobe PDF (preferred) or Microsoft Office format. If any information requested is determined to be sensitive, the specific handling of this information should be discussed in advance between the NRC inspectors and the Cooper Nuclear Station representatives assigned to the Problem Identification and Resolution Inspection to ensure appropriate handling.
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable format. Please be prepared to provide any significant updates to this information during the teams first week of inspection and then as new information becomes available. As used in this request, corrective action documents refers to condition reports, notifications, action requests, cause evaluations, and/or other similar documents, as applicable to Cooper Nuclear Station.
Please provide the following information no later than June 2, 2021:
- i. Document Lists Note: For these summary lists, please include the document/reference number, the document title, initiation date, current status, and long-text description of the issue.
- a. Summary list of all corrective action documents related to significant conditions adverse to quality that were opened, closed, or evaluated during the period
- b. Summary list of all corrective action documents related to conditions adverse to quality that were opened or closed during the period
- c. Summary list of all condition reports related to non-conditions adverse to quality that were opened or closed during the period
- d. Summary list of all apparent cause evaluations (or equivalent) performed during the period; if fewer than approximately 40, provide full documents and attachments
- e. Summary list of all currently open corrective action documents associated with conditions first identified prior to the beginning of the inspection period
- f. Summary list of all corrective action documents that were upgraded or downgraded in priority/significance during the period (these may be limited to those downgraded from, or upgraded to, apparent-cause level or higher)
- g. Summary list of all corrective action documents initiated during the period that identify an adverse or potentially adverse trend in safety-related or
risk-significant equipment performance or in any aspect of the stations safety culture.
- h. Summary lists of operator workarounds, operator burdens, temporary modifications, and control room deficiencies (1) currently open and (2) that were evaluated and/or closed during the period; this should include the date that each item was opened and/or closed.
- i. Summary list of all prompt operability determinations or other engineering evaluations to provide reasonable assurance of operability; if fewer than approximately 20, provide full documents and attachments
- j. Summary list of plant safety issues raised or addressed by the Employee Concerns Program (or equivalent) (sensitive information should be made available by appropriate means after discussion with the team lead)
- 2. Full Documents with Attachments
- a. All root cause evaluations completed during the period; include a list of any planned or in progress
- b. Quality Assurance audits performed during the period
- c. Audits/surveillances performed during the period on the Corrective Action Program, of individual corrective actions, or of cause evaluations
- d. Functional area self-assessments and non-NRC third-party assessments (e.g.,
peer assessments performed as part of routine or focused station self- and independent assessment activities; do not include INPO assessments) that were performed or completed during the period; include a list of those that are currently in progress
- e. Any assessments of the safety-conscious work environment at Cooper Nuclear Station including any safety culture survey results; if none performed during the inspection period, provide the most recent
- f. Corrective action documents generated during the period associated with the following:
- i. NRC findings and/or violations issued to Cooper Nuclear Station ii. Licensee Event Reports issued by Cooper Nuclear Station
- g. Corrective action documents generated for the following, if they were determined to be applicable to Cooper Nuclear Station (for those that were evaluated but determined not to be applicable, provide a summary list):
- i. NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during the period ii. Part 21 reports issued or evaluated during the period
iii. Vendor safety information letters (or equivalent) issued or evaluated during the period iv. Other external events and/or operating experience evaluated for applicability during the period
- h. Corrective action documents generated for the following:
- i. Maintenance preventable functional failures that occurred or were evaluated during the period ii. Adverse trends in equipment, processes, procedures, or programs that were evaluated during the period iii. Action items generated or addressed by offsite review committees during the period
- 3. Logs and Reports
- a. Corrective action performance trending/tracking information generated during the period and broken down by functional organization (if this information is fully included in item 3.b, it need not be provided separately)
- b. Current system health reports, Management Review Meeting package, or similar information; provide past reports as necessary to include greater-than-or-equal to 12 months of metric/trending data
- c. Radiation protection event logs during the period
- d. Security event logs and security incidents during the period (sensitive information should be made available during the teams first weekdo not provide electronically) - Handling of this item will need additional discussion
- e. Employee Concerns Program (or equivalent) logs (sensitive information should be made available during the teams first week of inspectiondo not provide electronically)
- f. List of training deficiencies, requests for training improvements, and simulator deficiencies for the period Note: For item 3.c-3.d, if there is no log or report maintained separate from the corrective action program, please provide a summary list of corrective action program items for the category described.
- 4. Procedures Note: For these procedures, please include all revisions that were in effect at any time during the period.
- a. Corrective action program procedures, to include initiation and evaluation procedures, operability determination procedures, cause evaluation procedures, and any other procedures that implement the corrective action program at Cooper Nuclear Station, including applicable corporate procedures
- b. Quality Assurance program procedures (specific audit procedures are not necessary)
- c. Employee Concerns Program (or equivalent) procedures
- d. Procedures that implement/maintain a Safety Conscious Work Environment
- e. Conduct of Operations procedure (or equivalent) and any other procedures or policies governing control room conduct, operator burdens and workarounds, etc.
- f. Maintenance rule procedures and any procedures implementing any portion of the maintenance rule at Cooper Nuclear Station
- g. Operating experience program procedures and any other procedures or guidance documents that describe the sites use of operating experience information
- 5. Other
- a. List of risk-significant components and systems, ranked by risk worth; if the list uses system designators, provide a list of the associated equipment/system names
- b. List of structures, systems and components and/or functions that were in maintenance rule (a)(1) status or evaluated for (a)(1) status at any time during the inspection period; include dates and results of expert panel reviews and dates of status changes
- c. Organization charts for plant staff and long-term/permanent contractors
- d. Electronic copies of the Updated Final Safety Analysis Report (or equivalent),
technical specifications, and technical specification bases, if available
- e. Table showing the number of corrective action documents (or equivalent) initiated during each month of the inspection period, by screened significance
- f. For each day the team is inspecting,
- i. Planned work/maintenance schedule for the station ii. Schedule of management or corrective action review meetings (e.g.
operations focus meetings, condition report screening meetings, Corrective Action Review Boards, Management Review Meetings, challenge meetings for cause evaluations, etc.)
iii. Agendas and materials for these meetings
Note: Please provide the items listed in 5.f on a daily basis All requested documents should be provided electronically (e.g., Certrecs IMS) where possible.
Brian Correll U.S. NRC Reactor Inspector Inspection Program and Assessment Team Division of Reactor Safety, Region IV 1600 E. Lamar Blvd, Arlington, TX 76011 Brian.Correll@nrc.gov