Category:Inspection Report
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 IR 05000298/20220022022-07-28028 July 2022 Integrated Inspection Report 05000298/2022002 IR 05000298/20224012022-06-29029 June 2022 Security Baseline Inspection Report 05000298/2022401 IR 05000298/20224032022-06-28028 June 2022 Security Baseline Inspection Report 05000298/2022403 IR 05000298/20220102022-06-16016 June 2022 Triennial Fire Protection Inspection Report 05000298/2022010 IR 05000298/20220012022-04-28028 April 2022 Integrated Inspection Report 05000298/2022001 IR 05000298/20224042022-04-13013 April 2022 Material Control and Accounting Program Inspection Report 05000298/2022404 - (Public) ML22084A6032022-04-0404 April 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection 05000298/2022002 and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) IR 05000298/20210042022-01-24024 January 2022 Integrated Inspection Report 05000298/2021004 IR 05000298/20223022021-12-0202 December 2021 Notification of NRC Initial Operator Licensing Examination 05000298/2022302 IR 05000298/20210032021-11-0404 November 2021 Integrated Inspection Report 05000298/2021003 IR 05000298/20210112021-10-19019 October 2021 CNS2021011 TI194 RPT Jfd, Cooper Nuclear Station - Temporary Instruction 2515/194 Report 05000298/2021011 IR 05000298/20214022021-10-12012 October 2021 Security Baseline Inspection Report 05000298/2021402 IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) IR 05000298/20210022021-08-0909 August 2021 Integrated Inspection Report 05000298/2021002 IR 05000298/20213012021-07-29029 July 2021 NRC Retake Examination Report 05000298/2021301 IR 05000298/20210122021-07-27027 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000298/2021012 IR 05000298/20210102021-06-0707 June 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000298/2021010 IR 05000298/20210012021-05-0505 May 2021 CNS2021001-IR-AS, Cooper Nuclear Station - Integrated Inspection Report 05000298/2021001 IR 05000298/20214012021-05-0404 May 2021 Security Baseline Inspection Report 05000298/2021401 IR 05000298/20200062021-03-0303 March 2021 Annual Assessment Letter for Cooper (Report 05000298/2020006) 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval 2024-04-03
[Table view] |
See also: IR 05000298/2019410
Text
October 30, 2018
Mr. John Dent, Jr.
Vice President-Nuclear and CNO
Nebraska Public Power District
Cooper Nuclear Station
72676 648A Avenue
P.O. Box 98
Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NOTIFICATION OF CYBER SECURITY
INSPECTION (NRC INSPECTION REPORT 05000298/2019410) AND
REQUEST FOR INFORMATION
Dear Mr. Dent:
On February 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection
in accordance with Inspection Procedure (IP) 71130.10P, Cyber Security, Revision 0, at the
Cooper Nuclear Station (CNS). This inspection evaluates and verifies your ability to meet the
full implementation requirements of the NRCs Cyber Security Rule, Title 10, Code of Federal
Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication
Systems and Networks. The onsite portion of the inspection will take place during the weeks of
February 11 and February 25, 2019.
Experience has shown that these inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. The document request has been divided into four
groups.
The first group specifies information necessary to assist the team in choosing the focus areas
(i.e., sample set) to be inspected in accordance with the cyber security inspection procedure.
This information should be made available using either a secure document management service
or passive media (i.e. CD, DVD) and delivered to the regional office no later than
December 3, 2018. The inspection team will review this information and by the end of the
planned information gathering visit on January 10, 2019, will request the specific items that
should be provided for review. The second group of requested documents will assist the team
in their evaluation of the critical systems and critical digital assets, defensive architecture, and
the areas of the cyber security plan selected for inspection. This information will be requested
for our review in the regional office prior to the inspection by January 28, 2019.
The third group of requested documents consists of those items that the team will review or
need access to, during the inspection. Please have this information available by the first day of
the onsite inspection, February 11, 2019.
J. Dent 2
The fourth group of information is necessary to aid the team in tracking issues identified as a
result of the inspection. It is requested that this information be provided to the lead inspector as
the information is generated during the inspection. It is important that all of these documents
are up to date and complete in order to minimize the number of additional documents requested
during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Greg Pick. We understand that our regulatory contact
for this inspection is LuAnn Bray. If there are any questions about the inspection or the
material requested, please contact the lead inspector at 817-200-1270 or by e-mail
at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget under control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA Gregory Pick for/
Gregory E. Werner, Chief
Engineering Branch 2
Division of Reactor Safety
Docket: 50-298
License: DPR-46
Enclosure:
Cooper Nuclear Station -
Cyber Security Inspection Document Request
cc w/ encl: Electronic Distribution
Cooper Nuclear Station - Cyber Security Inspection Document Request
Inspection Report: 05000298/2019410
Inspection Dates: Weeks of February 11, 2019, and February 25, 2019
Inspection Procedure: IP 71130.10P, Cyber Security, Revision 0
Reference 1: ML17156A215 - Guidance Document for Development of the
Request for Information (RFI) and Notification Letter for
Full-Implementation of the Cyber Security Inspection, Revision 1,
dated October 26, 2017
NRC Inspectors: Greg Pick, Lead Shiattin Makor
817-200-1270 817-200-1507
greg.pick@nrc.gov shiattin.makor@nrc.gov
NRC Contractors: A Konkal Joe Cristiano
561-859-5232 301-287-0582
alan.konkal@nrc.gov joseph.cristiano@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) provides the team with the general
information necessary to select appropriate components and cyber security plan
elements to develop a site-specific inspection plan. The team will use the first set of
information requested to identify the list of critical systems and critical digital assets plus
operational and management security control portions of the cyber security plan to be
chosen as the sample set required to be inspected during this inspection. The first
information request is specified in Table RFI #1. Provide the first set of information to
the team leader in the regional office by December 3, 2018, or sooner, to facilitate the
selection of the specific items that will be reviewed during the onsite inspection weeks.
The required Table RFI #1 information shall be provided on a secure document
management service or passive media (i.e. CD or DVD) to the lead inspector by
December 3, 2018. Please provide four copies of each media submitted (i.e., one for
each inspector/contractor). The preferred file format for all lists is a searchable Excel
spreadsheet file on a CD or DVD. These files should be indexed and hyperlinked to
facilitate efficient review. If you have any questions regarding this information, please
contact the inspection team leader as soon as possible.
Enclosure
Table RFI #1
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title: Items
1 List all identified critical systems and critical digital assets All
List critical digital asset facility and site ethernet - transmission control All
2 protocol/internet protocol (TCP/IP) based local area networks (LANs)
and identify those LANs that have non-critical digital assets on them
List critical digital asset facility and site non-ethernet TCP/IP based All
3 LANs including those industrial networks and identify LANs that have
non-critical digital assets on them
Network topology diagrams (be sure to include all network intrusion All
detection systems and security information and event management
4 (SIEMs) for emergency preparedness (EP) networks and security
level 3 and 4 networks)
List all network security boundary devices for EP networks and all All
8 network security boundary devices for levels 3 and 4
9 List critical digital asset wireless Industrial networks All
Network Intrusion detection system documentation for critical systems 11.a.1)
11 that have critical digital assets associated with them 11.a.2)
SIEM documentation for critical systems that have critical digital assets 12.a.1)
12 associated with them 12.a.2)
14 List EP and security onsite and offsite digital communication systems All
25 Cyber security assessment and cyber security incident response teams All
Copy of current cyber security plan and copy of any 50.54(p) analysis All
28 to support changes to that plan
Copy of any licensee identified violations and associated corrective All
29
action program documentation to resolve issue(s)
In addition to the above information please provide the following:
(1) Electronic copy of the updated safety analysis report and technical specifications
(2) Name(s) and phone number(s) for the regulatory and technical contacts
(3) Current management and engineering organizational charts
(4) Cyber security program procedures
Based on this information, the team will identify and select specific systems and
equipment (e.g., critical systems and critical digital assets) from the information
requested by Table RFI #1 and submit a list of specific systems and equipment to your
staff by the end of the information gathering visit on January 10, 2019, for the second
information request (i.e., Table RFI #2).
2
II. Additional Information Requested to be Available Prior to Inspection
As stated in Section I, the team will examine the documents from the initial information
request, and submit the list of specific systems and equipment to your staff by the end of
the information gathering visit on January 10, 2019. This second information request
(i.e., Table RFI #2) obtains additional documents required to evaluate the critical
systems and critical digital assets, defensive architecture, and the areas of the cyber
security program selected for the cyber security inspection. The additional information
requested for the specific systems and equipment is identified in Table RFI #2. All
requested information shall follow the guidance document Reference 1.
The Table RFI #2 information shall be provided on a secure document management
service or passive media to the lead inspector by January 28, 2019, or sooner. Please
provide four copies of each CD/DVD submitted (i.e., one for each inspector/contractor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate efficient review. If you have
any questions regarding this information, please call the inspection team leader as soon
as possible.
Table RFI #2
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title: Items
Plant computer system block diagram (if plant computer system is All
5 selected for inspection)
Plant security system block diagram (if security computer system is All
6 selected for inspection)
Block diagrams for distributed systems (for systems selected for All
7 inspection)
Host-based intrusion detection system documentation for critical 10.a.1)
10 digital assets (for systems selected for inspection) 10.a.2)
List all maintenance and test equipment (M&TE) used on critical digital All
13 assets (for systems selected for inspection)
15 Configuration management All
16.a
16 Supply chain management
16.b
17 Portable media and mobile device control All
18 Software management All
20 Vendor access and monitoring All
21 Work control All
22 Device access and key control All
23 Password/authenticator policy All
3
Table RFI #2
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title: Items
24 User account/credential policy All
26 Corrective actions since last NRC inspection All
27 Cyber security assessments for selected systems All
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in Section II, provide the following
request for information (i.e., Table 1st Week Onsite) on a secure document management
service or passive media by February 11, 2019, the first day of the inspection. All
requested information shall follow the guidance in Reference 1.
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).
The preferred file format for all lists is a searchable Excel spreadsheet file on a CD/DVD.
These files should be indexed and hyperlinked to facilitate ease of use. If you have any
questions regarding this information, please call the inspection team leader as soon as
possible.
Table 1st Week Onsite
Section 3: Initial Documentation Requests (See Reference 1)
Paragraph Number/Title: Items
10.a.3)
Host-based intrusion detection system documentation for critical
10 thru
digital assets (for systems selected for inspection)
10.a.12)
11.a.3)
Network Intrusion detection system documentation for critical
11 thru
systems that have critical digital assets associated with them
11.a.15)
12.a.3)
SIEM documentation for critical systems that have critical digital
12 thru
assets associated with them
12.a.14)
16 Supply chain management 16.c
19 Cyber security event notifications All
Update to licensee identified violations and corrective action All
29
program actions taken since the initial request was made
4
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a. Quality Assurance Plan;
b. Technical Specifications, if not previously provided;
c. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
and,
(2) Vendor Manuals, Assessments, and Corrective Actions:
a. The most recent cyber security quality assurance audit and/or
self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent cyber security
quality assurance audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the team leader.
5
ML18306A558
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: GAP Yes No Publicly Available Sensitive
OFFICE SRI:EB2 BC:EB2
NAME G. Pick G. Werner
SIGNATURE /RA/ /RA/
DATE 10/30/2018 10/29/2018