| number = ML20155B568
| number = ML20155B568
| issue date = 10/27/1998
| issue date = 10/27/1998
| title = Informs That GE Rept GENE-187-30-0598,DRF#B13-01920-30, CRD Bolting Flaw Evaluation for Ja FitzPatrick Np, Rev 0,dtd May 1998,submitted by 980507 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
| title = Informs That GE Rept GENE-187-30-0598,DRF B13-01920-30, CRD Bolting Flaw Evaluation for Ja FitzPatrick Np, Rev 0,dtd May 1998,submitted by 980507 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
| author name = Williams J
| author name = Williams J
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)

Latest revision as of 20:49, 30 May 2022

Informs That GE Rept GENE-187-30-0598,DRF B13-01920-30, CRD Bolting Flaw Evaluation for Ja FitzPatrick Np, Rev 0,dtd May 1998,submitted by 980507 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
ML20155B568
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/27/1998
From: Williams J
NRC (Affiliation Not Assigned)
To: Robare D
GENERAL ELECTRIC CO.
References
TAC-MA1764, NUDOCS 9810300185
Download: ML20155B568 (5)


Text

. ._. . - . - - -

~

o atg g i UNITED STATES s

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. *= mt

$P'Oh5 4

\*****l Octcber 27,1998 Mr. David Robare Technical Account Manager Technical Services General tilectric Company i 175 Curtner Ave.

San Jose, CA 95125 4

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MA1764)

Dear Mr. Robare:

i

! By application from the New York Power Authority dated September 11,1998, your affidavit dated May 7,1998, you submitted GENE-187-30 0598, DRF#B13-01920-30, "CRD Bolting Flaw Evaluation for James A. FitzPatrick Nuclear Power Plant," Revision 0, dated May 1998, Class 111, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version will be submitted for placement in the NRC public document room.

The affidsvit stated that the submitted information should be considered exempt from mandatory public disclosure for the fol-!owing reasons:

The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention ofits use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; 3

The information which, if used by a ccmpetitor, would reduce his 1 1 expenditure of resources or improve his competitive position in the '

design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

I I

N information identified is classified as proprietary because it contains detailed results  !

, s. metallurgical evaluations of CRD Cap Screws. The information was developed at a i significant expense to GE.

l 4

We have reviewed your application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information t

\ eU {

sought to be withheld contains proprietary commercial information.

Therefore, GENE-187 30-0598, DRF #B13-01920-30, CRD Belting Flaw Evaluation for James A.

FitzPatrick Nuclear Power Plant, marked as proprietary, will be withheld from public disclosure y pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

.h 7 Withholding from public inspection shall not affect the right, if any, of persons property and directly concemed to inspect the documents. If the need arises, we may send copies of this l

information to our consultants working in this area. We will, of course, ensure that the l consultants have signed the appropriate agreements for handling proprietary information.

981030018S 981027 i PDR ADOCK 05000333 I p PDR l f)f ff

.. -_. . _ _ - _ . - - - - . ~ _ . - _ _ _ _ _ _ _ _ _ _ --.___._ _ .

f l D. Robare If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly l notify the NRC. You also should understand that the NRC may have cause to review this l determination in the future, for example, if the scope of a Freedom of Information Act request l includes yourinformation. In all review situations,if the NRC makes a determination adverse to l the above, you will be notified in advance of any public disclosure.

1 j If you have any questions regarding this matter, I may be reached at (301) 415-1470.

Sincerely, 14 Joseph F. Williams, Project Manager l Project Directorate 1-1 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket No. 50-333 cc: See next page l

t i

l l

i October 27,1998 D. Robare - I If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example,if the scope of a Freedom of Information Act request i includes your information.' in all review situations, if the NRC makes a determination adverse to '

- the above, you will be notified in advance of any public disclosure, if you have any questions regarding this matter, I may be reached at (301) 415-1470.

l Sincerely, I

I I i

Original signed by:

Joseph F. Williams, Project Manager l Project Directorate 1-1 l Division of Reactor Projects - 1/11 I

Office of Nuclear Reactor Regulation Docket No. 50 333 cc: See next page DISTRIBUTION:

IDocket Filei PUBLIC PDI-1 R/F J. Zwolinski S. Little J. Williams l M.P. Siemien, OGC (e-mail MPS)

C. Hehl, Region l l

DCCUMENT NAME: G:\FITZ\MA1764.PL To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with 1

attachment /enclosufe "N" = No copy m 0FFICE PM:P01 l h lE LA: POI 1 g()y l D:P01 1 , A l OGC //ih Ll NAME JWil t lapipfrst W SLittle # 58eJwe FA MPSiemien PI//

W OATE 10/.f/J98 10/8D/98 10/t1/98 10/19/98 Official Record Copy l

C _ , . . - _ _ _ _ _ . _ . _ _ .- , __. .

t  : ,

?

October 27,1998 s

D. Robare If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this i determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure, i

if you have any questions regarding this matter, I may be reached at (301) 415-1470. j Sincerely, i Original signed by: l Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - t/il l Office of Nuclear Reactor Regulation Docket No. 50-333 cc: See next page DISTRIBUTION:

Docket File PUBLIC PDI-1 R/F J. Zwolinski S. Little J. Williams M.P. Siemien, OGC (e-mail MPS)

C. Hehl, Region I i

1 DOCUMENT NAME: G:\FITZ\MA1764.PL To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attrchment/enclosufe "N" = No copy m OFFICE PM:P01 1 @ lE LA PO! 1 i()y l D:P01 1, A l OGC h4h l WAME JVi L tiaffpfrst W Slittt # SSejwa /PA MP$lemien Pl//

DATE 10/1/198 10/90/98 10/tA /98 10/ W /98 Official Record Copy l

4 ,

I 1 .

James Knubel James A. FitzPatrick Nuc{ ear

, Power Authority of the State Power Plant of New York cc:

l l

l Mr. Gerald C. Goldstein Mr. F. William Valentino, President Assistant General Counsel New York State Energy, Research, Power Authority of the State and Development Authority of New York Corporate Plaza West l 1633 Broadway 286 Washington Avenue Extension New York, NY 10019 Albany, NY 12203-6399 l Resident inspector's Office Mr. Richard L. P.?.tch, Director U. S. Nuclear Regulatory Commission Quality Assurance l

P.O. Box 136 Power Authority of the State Lycoming, NY 13093 of New York 1'23 Main Street Mr. Hany P. Salmon, Jr. White Plains, NY 10601 Vice President - Engineering Power Authority of the State Mr. Gerard Goering l of New York 28112 Bayview Drive 123 Main Street Red Wing, MN 55066 White Plains, NY 10601 Mr. James Gagliardo Ms. Charlene D. Faison Safety Review Committee Director Nuclear Licensing 708 Castlewood Avenue Power Authority of the State Arlington, TX 76012 of New York 123 Main Street Mr. Arthur Zaremba, Licensing Manager White Plains, NY 10601 James A. FitzPatrick Nuclear Power Plant l Supervisor P.O. Box 41 Town of Scriba Lycoming, NY 13093 Route 8, Box 382 Oswego, NY 13126 Mr. Paul Eddy New York State Dept. of Mr. Eugene W. Zeltmann Public Service President and Chief Operating 3 Empire State Plaza,10th Floor Officer Albany, NY 12223 Power Authority of the State of New York Michael J. Colomb 99 Washington Ave., Suite No. 2005 Site Executive Officer Albany, NY 12.210-2820 James A. FitzPatrick Nuclear Power Plant P.O. Box 41 Charles Donaldson, Esquire Lycoming, NY 13093 Assistant Attomey General New York Department of Law 120 Broadway l New York, NY 10271 l

l Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 l