ML20203K765: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20203K765
| number = ML20203K765
| issue date = 04/25/1986
| issue date = 04/25/1986
| title = Forwards Vol 3 of TVA Welding Project:Sequoyah Phase II Review & Programs Results, Per 860117 Ltr.Rept Completes Submittals
| title = Forwards Vol 3 of TVA Welding Project:Sequoyah Phase II Review & Programs Results, Per .Rept Completes Submittals
| author name = Gridley R
| author name = Gridley R
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8605010035
| document report number = NUDOCS 8605010035
| title reference date = 01-17-1986
| package number = ML20203K768
| package number = ML20203K768
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:TENNESSEE VALLEY AUTHORITY SN 157B Lookout Place April 25, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Dear Mr. Denton:==
 
In the Matter of                      )                        Docket Nos. 50-327 Tennessee Valley Authority            )                                    50-328 In.accordance with TVA's welding review program submitted by J. A.
Domer's {{letter dated|date=January 17, 1986|text=letter dated January 17, 1986}}, enclosed for your review is the remainder of the Sequoyah Nuclear Plant Phase II reports.
Please note that a Volume III binder was previously submitted to you on February 7, 1986 and the enclosed reports should be filed in that binder in accordance with the enclosed instruction sneet.
These reports complete our submittals for Sequoyah Nuclear Plant.
Reports on the results of program implementation for Hatts Bar,
.Bellefonte, and Browns Ferry Nuclear Plants will be submitted with appropriate binders as they are completed.
Please telephone R. H. Shell at FTS 858-2688, if you have any questions or comments on these reports.
Very truly yours, TENNESSEE VA LEY AUTHORITY R. L. Gridley, Director Nuclear Safet and Licensing Enclosures cc: U.S. Nuclear Regulatory Commission (Enclosures)
Region II Attention:  Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 b
      ..7 PDR .ADOCK O 4\
P An Equal Opportunity Employer
 
TVA WELDING PROJECT SEQUOYAH PHASE II REVIEH AND PROGRAMS RESULTS VOLUME 3 INSTRUCTION SHEET Remove                                                    Insert Table of Contents                                  Table of Contents (In Front of Section I Tab)                        (In Front of Section i Tao)
            --                                          Section I Introduction
            --                                          Section II Aptech Engg. Rept. 1 (Supplemental Information) I (Insert after Aptech Engg. l l
Report)                  !
!              --                                        Section III Bechtel Audit Report
                --                                        Section IV Sequoyah Helding Reinspection Report l                                                        Section IV Appendixes l
8 I
                --                                        Section V Sequoyah Program    (
Results Reports            ;
i
                --                                        Section V Appendises l                                -
l l
I t
l O                                                                                  h i
6 l}}

Latest revision as of 09:55, 7 December 2021

Forwards Vol 3 of TVA Welding Project:Sequoyah Phase II Review & Programs Results, Per .Rept Completes Submittals
ML20203K765
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/25/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20203K768 List:
References
NUDOCS 8605010035
Download: ML20203K765 (2)


Text

TENNESSEE VALLEY AUTHORITY SN 157B Lookout Place April 25, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 In.accordance with TVA's welding review program submitted by J. A.

Domer's letter dated January 17, 1986, enclosed for your review is the remainder of the Sequoyah Nuclear Plant Phase II reports.

Please note that a Volume III binder was previously submitted to you on February 7, 1986 and the enclosed reports should be filed in that binder in accordance with the enclosed instruction sneet.

These reports complete our submittals for Sequoyah Nuclear Plant.

Reports on the results of program implementation for Hatts Bar,

.Bellefonte, and Browns Ferry Nuclear Plants will be submitted with appropriate binders as they are completed.

Please telephone R. H. Shell at FTS 858-2688, if you have any questions or comments on these reports.

Very truly yours, TENNESSEE VA LEY AUTHORITY R. L. Gridley, Director Nuclear Safet and Licensing Enclosures cc: U.S. Nuclear Regulatory Commission (Enclosures)

Region II Attention: Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 b

..7 PDR .ADOCK O 4\

P An Equal Opportunity Employer

TVA WELDING PROJECT SEQUOYAH PHASE II REVIEH AND PROGRAMS RESULTS VOLUME 3 INSTRUCTION SHEET Remove Insert Table of Contents Table of Contents (In Front of Section I Tab) (In Front of Section i Tao)

-- Section I Introduction

-- Section II Aptech Engg. Rept. 1 (Supplemental Information) I (Insert after Aptech Engg. l l

Report)  !

! -- Section III Bechtel Audit Report

-- Section IV Sequoyah Helding Reinspection Report l Section IV Appendixes l

8 I

-- Section V Sequoyah Program (

Results Reports  ;

i

-- Section V Appendises l -

l l

I t

l O h i

6 l