BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2021001 AND 05000455/2021001
 
==Dear Mr. Rhoades:==
On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On April 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. H. Welt, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2021001 and 05000455/2021001 Enterprise Identifier: I-2021-001-0017 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 01, 2021 to March 31, 2021 Inspectors: D. Betancourt-Roldan, Senior Resident Inspector C. Thompson, Illinois Emergency Management Agency J. Weigandt, Resident Inspector Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=PLANT STATUS=
 
Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
 
Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.
 
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
 
===Impending Severe Weather Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from an impending winter storm on January 25 through January 26, 2021.
 
==71111.04 - Equipment Alignment==
 
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) 1A safety injection (SI) prior to B test on February 10, 2021
: (2) 2B emergency diesel generator (EDG) during 2A semi-annual test as set forth in Work Order (WO) 5081391 on March 10, 2021
: (3) 2A EDG prior to 2B EDG work on March 22, 2021 Complete Walkdown Sample (IP Section 03.02) (1 Partial)
    (1)  (Partial)
The inspectors evaluated system configurations during a complete walkdown of the Unit 2 auxiliary feedwater (AF) system on February 3 and March 26, 2021.
 
==71111.05 - Fire Protection==
 
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
: (1) Unit 1 Division 12 Miscellaneous Electrical Equipment Room (MEER) and Battery Room, Fire Zones (FZs) 5.4-2, 5.5-2, and 5.6-2 on March 10, 2021
: (2) 1B EDG Room, FZ 18.1-1 on March 4, 2021
: (3) Unit 2 Division MEER, FZ 5.4-2 on March 17, 2021
 
===Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)===
: (1) The inspectors evaluated the on-site fire brigade training and performance during an          unannounced fire drill on January 30, 2021.
 
==71111.07A - Heat Sink Performance==
 
===Annual Review (IP Section 03.01) (1 Sample)===
The inspectors evaluated readiness and performance of:
: (1) Component cooling heat exchanger tube plugging on February 16, 2021
 
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during implementation of Engineering Change (EC) 632575, Unit 1 "Tref" adjustment on March 3, 2021. The inspectors also observed operator performance in the Control Room during 0BOSR MP-1 max VAR testing under Work Order 5029908 on March 11, 2021.
 
===Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)===
: (1) The inspectors observed and evaluated a licensed operator training requalification            scenario on February 15, 2021.
 
==71111.12 - Maintenance Effectiveness==
 
===Maintenance Effectiveness (IP Section 03.01) (2 Samples)===
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
: (1) Issues with Unit 2 power oscillations as documented in Action Request (AR) 04396745 on January 25, 2021
: (2) Control Room heating ventilation and air conditioning (VC) system on February 10, 2021
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
 
===Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
: (1) 1B residual heat removal (RH) work window on February 10, 2021
: (2) 1A SI work window as set forth in WO 5067292 on March 3, 2021
: (3) Work risk during the week of March 15, 2021
: (4) Work risk during the week of March 29, 2021
 
==71111.15 - Operability Determinations and Functionality Assessments==
 
===Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
: (1) The 2B diesel generator tripped during start for monthly run as documented in AR 4397062 on January 21, 2021
: (2) VC damper issue as documented in AR 4399739 on January 20, 2021
: (3) 0B essential service water (SX) cooling tower fan oil press alarm as documented in AR 4403121 on February 19, 2021
: (4) Unit 2 Power Distribution Monitoring System/Plant Process Computer problem as documented in AR 4407267 on March 13, 2021
: (5) 1FW009A, Main feedwater isolation valve hydraulic pump cycling as documented in AR 441170 on March 26, 2021
 
==71111.18 - Plant Modifications==
 
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(2 Samples)
The inspectors evaluated the following temporary or permanent modifications:
: (1) 1A EDG JW Clr leak repair clamp as documented in ARs 4393165 and 4389788 on February 3, 2021
: (2) Revise Unit 1 Reactor Coolant System (RCS) Program Reference Temperature from 587.0 deg F to 586.5 deg F in the Ovation' Digital Control System as documented in WO 5093368 and EC 632575 on March 3, 2021
 
==71111.19 - Post-Maintenance Testing==
 
===Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
: (1) 1A containment spray (CS) post-maintenance test (PMT) following maintenance as set forth in WO 04966365 on February 3, 2021
: (2) 2A CS PMT per 2BOSR 5.5.8.CS.5-1c as set forth in WO 5115336 on February 26, 2021
: (3) 1A SI pump bearing and seal work and test per 1BOSR 5.5.8.SI.5-1a as set forth in WO 5112994 on March 4, 2021
: (4) 0B Fire Pump PMT following maintenance as set forth in WO 5136033 on March 26, 2021
==71111.22 - Surveillance Testing==
 
The inspectors evaluated the following surveillance tests:
 
===Surveillance Tests (other) (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=3}}
: (1) 1BOSR 7.5.4-2, 1B AF monthly test as set forth in WO 5118865 on February 19, 2021
: (2) Surveillance Frequency Change, (STI BY-20-004), Revise valve alignment verification from monthly to quarterly on March 3, 2021
: (3) 2BOSR 8.1.2-1, 2A Diesel Generator Test as set forth in WO 5115341, on
 
===February 3, 2021 Inservice Testing (IP Section 03.01) (1 Sample)===
: (1) Group A inservice test (IST) for 2RH01PB on January 23, 2021
 
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated an emergency preparedness (EP) drill on
 
===February 9, 2021.
 
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===
The inspectors evaluated:
: (1) The inspectors observed and evaluated a DEP scenario on February 19,
 
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01) ===
{{IP sample|IP=IP 71151|count=2}}
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02)
(2 Samples)
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
 
===IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)===
: (1) Unit 1 (January 1, 2020 - December 31, 2020)
: (2) Unit 2 (January 1, 2020 - December 31, 2020)
 
==71152 - Problem Identification and Resolution==
 
===Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Use of plant barrier impairment (PBI) permits during maintenance activities on February 10,
 
==INSPECTION RESULTS==
Observation: Use of Plant Barrier Impairment Permits During Maintenance                71152 Activities On February 10, 2021, during the NRC performed a walkdown of protected equipment associated with a 1B RH cubicle cooler work window (WO 4952630). During this walkdown the NRC noted the Unit 1 containment spray (CS) pump area door, 0DSD245, was wide open and unattended. Upon identification the inspectors notified the shift of the condition. The inspectors proceeded to review the PBI program documents and noted that they only allowed the door to be open 1 inch or less due to ventilation requirements.
 
The inspectors reviewed the Corrective Action Program (CAP) causal evaluation performed by the licensee for the initial as found condition. The evaluation stated that two additional doors (0DSD847, and 0DSD253) had also been blocked open effectively linking the 1A CS room, 1B CS room and 1B RH room. Based on existing and expected pressures, the evaluation concluded that there was reasonable assurance that the auxiliary building ventilation was operable. Additionally, the evaluation on the human performance aspect concluded that the lack of briefing the specific PBI requirements to the assigned individuals prevented the identification and correction of the condition. Based on an inadequate brief or turnover, the responsible individuals did not understand that the door could not be propped full open due to ventilation requirements. The inspector identified that the failure to follow the plant barrier impairment program when blocking open doors 0DSD245, 0DSD847, and 0DSD253 was a performance deficiency, but that it was of minor significance since it did not affect the availability, capability or reliability of safety systems.
 
To further understand if there where general issues with PBIs the inspectors looked in the CAP system and found that over the course of a month, three instances of inadequate use of PBIs were entered in the CAP as listed below:
2/2/2021: AR 04399590, New PBI required for 1A CS pump work window 2/17/2021: AR 04403035, NRC identified item on PBI 3/9/2021: AR 04407661, Incorrect PBI permit generated for 2A RH work window Based on the information above the inspector saw that there was a potential that Byron staff may not be fully aware that there are more PBI requirements than just performing a fire watch. The observation was shared with the site who is addressing this item as part of their planned corrective actions.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On April 7, 2021, the inspectors presented the integrated inspection results to Mr. H. Welt, Acting Site Vice President, and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation    Description or Title                                  Revision or
Procedure                                                                                          Date
71111.01  Corrective Action 04393161      Degraded Piping                                        12/31/2020
Documents
Procedures        OP-AA-108-111- Severe Weather and Natural Disaster Guidelines        22
1001
71111.04  Procedures        BOP AF-M2A    Aux. Feedwater System Train "A" Valve Lineup          7
BOP DG-E2A    Diesel Generator Train "A" Electrical Lineup          3
BOP DG-M2A    Train "A" Diesel Generator System Valve Lineup        10
BOP DG-M2B    Train "B" Diesel Generator System Valve Lineup        9
BOP SI-M1A    Train "A" Safety Injection Valve Lineup                2
71111.05  Corrective Action 2392278        Battery in Use Light Did Not Illuminate                10/07/2014
Documents        2392279        Battery in Use Light Did Not Illuminate                10/07/2014
4102915        2PA39J Battery Trouble Light Lit                      02/11/2018
Corrective Action 4398693        NRC Identified, Non TRM Fire Door Not Latching        01/28/2021
Documents        4406643        NRC ID- 0DSD606 (0B SX M/U PP DO Tank Room) Does      03/04/2021
Resulting from                  Not Lock
Inspection
Drawings          6E-2-4030FP43  Fire Detection Control Cabinets 2PA39J & 2PA49J        D
6E-2-4171      Elevation Fire Detection Control Cabinet 2PA39J        P
6E-2-4186      Elevation Fire Detection Control Cabinet 2PA49J        S
Fire Plans        FZ 18.1-1      1B DG & Switchgear Room Air Shaft                      2
PFP #201      Fire Area/Zone: FZ 18.6-0, Service Bldg. 401'-0" ELEV. 3
Ground Floor
PFP #48        FZ 5.4-2, Aux. Bldg. 451' Div. 22 MEER                3
PFP #50        FZ 5.5-2, Aux. Bldg. 451' U2 AEER                      4
Miscellaneous    21-04-MMD FLS  Fire Drill Scenario No. 21-04                          12/30/2020
Office
Procedures        BAP 1100-10T  Fire Drill Planning Checklist                          0
OP-AA-201-003  Fire Drill Performance                                18
Self-Assessments  A-Shift-21-04  Fire Drill Record                                      02/01/2021
71111.07A  Engineering      BYR97-467      Component Cooling Heat Exchanger Tube Plugging        7
Evaluations                      Evaluation
Inspection Type              Designation  Description or Title                                        Revision or
Procedure                                                                                              Date
71111.11Q Miscellaneous                    LORT Scenario                                              02/25/2021
71111.12  Corrective Action 04396726      0VC Make Up Fan Trip                                        01/19/2021
Documents        04396745      Unit 2 RX Power Oscillating Since Last Outage              01/19/2021
71111.13  Corrective Action 4403035      NRC Identified Item on PBI                                  02/17/2021
Documents
Resulting from
Inspection
Miscellaneous    UFSAR 9.4.5.1 Auxiliary Building HVAC                                    13
Procedures        BAP 1100-3A3  Pre-Evaluated Plant Barrier Matrix                          43
CC-AA-201    Plant Barrier Control Program                              13
71111.15  Corrective Action 04397062      2B DG Tripped During Monthly Start                          01/21/2021
Documents        4399739      Fire Damper oVC187Y Electro-Thermal Links Blown,            02/02/2021
Damper Open
4403121      0B SX CT Fan Oil Pressure Alarm                            02/19/2021
4407267      U2 PDMS/PPC Problem Alarm                                  03/13/2021
Operability      441170        1FW009A, Main Feedwater Isolation Valve Hydraulic Pump      03/26/2021
Evaluations                    Was Cycling
Procedures        OP-AA-108-115 Operability Determinations                                  24
71111.18  Engineering      632575        FCN-CAEO-40544: Decrease of Full Load Tref from 587 deg    03/03/2021
Changes                        F to 586.5 deg F
Work Orders      5093368      Revise Unit 1 RCS Program Reference Temperature in          03/03/2021
Ovation
71111.19  Corrective Action 4411158      0B Diesel Fire Pump Battery #2, Cell#1 Low Specific Gravity 03/24/2021
Documents
Corrective Action 4406587      NRC ID: Boric Acid Build up on 0PI-FC006                    03/04/2021
Documents
Resulting from
Inspection
Procedures        2BOSR        Comprehensive Inservice Testing (IST) Requirements for      10
5.5.8.CS.5-1c Containment Spray Pump 2CS01PA
Work Orders      4966365      1A CS PMT Following Maintenance                            02/03/2021
5109618      0BOSR 10.B.2-1, Diesel Fire Pump Battery Monthly            03/26/2021
Surveillance
5115336      (NEIL) - 2CS01PA Comprehensive IST RQMTS for                02/19/2021
Inspection Type              Designation    Description or Title                                      Revision or
Procedure                                                                                            Date
Containment Spray
26616        0BOSR 10.B.6-1, Diesel Fire Pump Monthly Surveillance    03/26/2021
5136033        Unexpected Auto Start of 0B Fire Pump                    03/25/2021
71111.22  Miscellaneous    STI BY-20-004  Revise Valve Alignment Verification Monthly Surveillance  03/01/2021
from Monthly to Quarterly
Procedures        1BOSR 7.5.4-2  Diesel Driven Auxiliary Feedwater Pump Monthly            32
Surveillance
2BOSR          Group A Inservice Testing (IST) Requirements for Residual 12
5.5.8.RH.5-2a  Heat Removal Pump 2RH01PB
Work Orders      5098934        (NEIL) - 2RH01PB Group A IST Requirements for RH Pump    01/22/2021
5115341        LR-2BOSR 8.1.2-1, 2A D/G Monthly Surveillance            02/03/2021
5118865        1BOSR 7.5.4-2, 1B AF PP Run                              02/18/2021
71151      Miscellaneous                    Unplanned Power Changes Data from Logs (01/01/2020 -
2/31/2020)
71152      Corrective Action 4234300        Specific Gravity is Low on the 0D Dsl Drv FP Batt #2      03/29/2019
Documents        4399590        New PBI Required for 1A CS Pump Work Window              02/02/2021
4407661        Incorrect PBI Permit Generated for 2A RH PP Work Window  03/09/2021
Miscellaneous    0BOL 10.g      LCOAR Fire Assemblies TRM LCO # 3.10.g for PBI 20-295    02/11/2021
and 296
OP-AA-201-007, "Sample" Fire Watch Inspection Log for 0DSD245/0DSD847    02/11/2021
PBI 20-295    CC-AA-201-F-01, Plant Barrier Impairment Permit for      02/11/2021
0DSD245
11
}}
}}

Revision as of 11:22, 9 September 2021

Integrated Inspection Report 05000454/2021001 and 05000455/2021001
ML21110A129
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/20/2021
From: Hironori Peterson
Region 3 Branch 3
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021001
Download: ML21110A129 (13)


Text

April 20, 2021

SUBJECT:

BYRON STATION - INTEGRATED INSPECTION REPORT 05000454/2021001 AND 05000455/2021001

Dear Mr. Rhoades:

On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Byron Station. On April 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. H. Welt, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 05000454 and 05000455 License Nos. NPF-37 and NPF-66

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000454 and 05000455 License Numbers: NPF-37 and NPF-66 Report Numbers: 05000454/2021001 and 05000455/2021001 Enterprise Identifier: I-2021-001-0017 Licensee: Exelon Generation Company, LLC Facility: Byron Station Location: Byron, IL Inspection Dates: January 01, 2021 to March 31, 2021 Inspectors: D. Betancourt-Roldan, Senior Resident Inspector C. Thompson, Illinois Emergency Management Agency J. Weigandt, Resident Inspector Approved By: Hironori Peterson, Chief Branch 3 Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Byron Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

Unit 2 began the inspection period operating at full power. With the exception of minor reductions in power to support scheduled testing activities or small load changes requested by the transmission dispatcher, the unit remained at or near full power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from an impending winter storm on January 25 through January 26, 2021.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) 1A safety injection (SI) prior to B test on February 10, 2021
(2) 2B emergency diesel generator (EDG) during 2A semi-annual test as set forth in Work Order (WO) 5081391 on March 10, 2021
(3) 2A EDG prior to 2B EDG work on March 22, 2021 Complete Walkdown Sample (IP Section 03.02) (1 Partial)

(1) (Partial)

The inspectors evaluated system configurations during a complete walkdown of the Unit 2 auxiliary feedwater (AF) system on February 3 and March 26, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 Division 12 Miscellaneous Electrical Equipment Room (MEER) and Battery Room, Fire Zones (FZs) 5.4-2, 5.5-2, and 5.6-2 on March 10, 2021
(2) 1B EDG Room, FZ 18.1-1 on March 4, 2021
(3) Unit 2 Division MEER, FZ 5.4-2 on March 17, 2021

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on January 30, 2021.

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Component cooling heat exchanger tube plugging on February 16, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during implementation of Engineering Change (EC) 632575, Unit 1 "Tref" adjustment on March 3, 2021. The inspectors also observed operator performance in the Control Room during 0BOSR MP-1 max VAR testing under Work Order 5029908 on March 11, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a licensed operator training requalification scenario on February 15, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Issues with Unit 2 power oscillations as documented in Action Request (AR) 04396745 on January 25, 2021
(2) Control Room heating ventilation and air conditioning (VC) system on February 10, 2021

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) 1B residual heat removal (RH) work window on February 10, 2021
(2) 1A SI work window as set forth in WO 5067292 on March 3, 2021
(3) Work risk during the week of March 15, 2021
(4) Work risk during the week of March 29, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) The 2B diesel generator tripped during start for monthly run as documented in AR 4397062 on January 21, 2021
(2) VC damper issue as documented in AR 4399739 on January 20, 2021
(3) 0B essential service water (SX) cooling tower fan oil press alarm as documented in AR 4403121 on February 19, 2021
(4) Unit 2 Power Distribution Monitoring System/Plant Process Computer problem as documented in AR 4407267 on March 13, 2021
(5) 1FW009A, Main feedwater isolation valve hydraulic pump cycling as documented in AR 441170441170on March 26, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) 1A EDG JW Clr leak repair clamp as documented in ARs 4393165 and 4389788 on February 3, 2021
(2) Revise Unit 1 Reactor Coolant System (RCS) Program Reference Temperature from 587.0 deg F to 586.5 deg F in the Ovation' Digital Control System as documented in WO 5093368 and EC 632575 on March 3, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) 1A containment spray (CS) post-maintenance test (PMT) following maintenance as set forth in WO 04966365 on February 3, 2021
(2) 2A CS PMT per 2BOSR 5.5.8.CS.5-1c as set forth in WO 5115336 on February 26, 2021
(3) 1A SI pump bearing and seal work and test per 1BOSR 5.5.8.SI.5-1a as set forth in WO 5112994 on March 4, 2021
(4) 0B Fire Pump PMT following maintenance as set forth in WO 5136033 on March 26, 2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) 1BOSR 7.5.4-2, 1B AF monthly test as set forth in WO 5118865 on February 19, 2021
(2) Surveillance Frequency Change, (STI BY-20-004), Revise valve alignment verification from monthly to quarterly on March 3, 2021
(3) 2BOSR 8.1.2-1, 2A Diesel Generator Test as set forth in WO 5115341, on

February 3, 2021 Inservice Testing (IP Section 03.01) (1 Sample)

(1) Group A inservice test (IST) for 2RH01PB on January 23, 2021

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1 Sample)

(1) The inspectors observed and evaluated an emergency preparedness (EP) drill on

===February 9, 2021.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)===

The inspectors evaluated:

(1) The inspectors observed and evaluated a DEP scenario on February 19,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01) ===

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02)

(2 Samples)

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)

(1) Unit 1 (January 1, 2020 - December 31, 2020)
(2) Unit 2 (January 1, 2020 - December 31, 2020)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Use of plant barrier impairment (PBI) permits during maintenance activities on February 10,

INSPECTION RESULTS

Observation: Use of Plant Barrier Impairment Permits During Maintenance 71152 Activities On February 10, 2021, during the NRC performed a walkdown of protected equipment associated with a 1B RH cubicle cooler work window (WO 4952630). During this walkdown the NRC noted the Unit 1 containment spray (CS) pump area door, 0DSD245, was wide open and unattended. Upon identification the inspectors notified the shift of the condition. The inspectors proceeded to review the PBI program documents and noted that they only allowed the door to be open 1 inch or less due to ventilation requirements.

The inspectors reviewed the Corrective Action Program (CAP) causal evaluation performed by the licensee for the initial as found condition. The evaluation stated that two additional doors (0DSD847, and 0DSD253) had also been blocked open effectively linking the 1A CS room, 1B CS room and 1B RH room. Based on existing and expected pressures, the evaluation concluded that there was reasonable assurance that the auxiliary building ventilation was operable. Additionally, the evaluation on the human performance aspect concluded that the lack of briefing the specific PBI requirements to the assigned individuals prevented the identification and correction of the condition. Based on an inadequate brief or turnover, the responsible individuals did not understand that the door could not be propped full open due to ventilation requirements. The inspector identified that the failure to follow the plant barrier impairment program when blocking open doors 0DSD245, 0DSD847, and 0DSD253 was a performance deficiency, but that it was of minor significance since it did not affect the availability, capability or reliability of safety systems.

To further understand if there where general issues with PBIs the inspectors looked in the CAP system and found that over the course of a month, three instances of inadequate use of PBIs were entered in the CAP as listed below:

2/2/2021: AR 04399590, New PBI required for 1A CS pump work window 2/17/2021: AR 04403035, NRC identified item on PBI 3/9/2021: AR 04407661, Incorrect PBI permit generated for 2A RH work window Based on the information above the inspector saw that there was a potential that Byron staff may not be fully aware that there are more PBI requirements than just performing a fire watch. The observation was shared with the site who is addressing this item as part of their planned corrective actions.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 7, 2021, the inspectors presented the integrated inspection results to Mr. H. Welt, Acting Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Corrective Action 04393161 Degraded Piping 12/31/2020

Documents

Procedures OP-AA-108-111- Severe Weather and Natural Disaster Guidelines 22

1001

71111.04 Procedures BOP AF-M2A Aux. Feedwater System Train "A" Valve Lineup 7

BOP DG-E2A Diesel Generator Train "A" Electrical Lineup 3

BOP DG-M2A Train "A" Diesel Generator System Valve Lineup 10

BOP DG-M2B Train "B" Diesel Generator System Valve Lineup 9

BOP SI-M1A Train "A" Safety Injection Valve Lineup 2

71111.05 Corrective Action 2392278 Battery in Use Light Did Not Illuminate 10/07/2014

Documents 2392279 Battery in Use Light Did Not Illuminate 10/07/2014

4102915 2PA39J Battery Trouble Light Lit 02/11/2018

Corrective Action 4398693 NRC Identified, Non TRM Fire Door Not Latching 01/28/2021

Documents 4406643 NRC ID- 0DSD606 (0B SX M/U PP DO Tank Room) Does 03/04/2021

Resulting from Not Lock

Inspection

Drawings 6E-2-4030FP43 Fire Detection Control Cabinets 2PA39J & 2PA49J D

6E-2-4171 Elevation Fire Detection Control Cabinet 2PA39J P

6E-2-4186 Elevation Fire Detection Control Cabinet 2PA49J S

Fire Plans FZ 18.1-1 1B DG & Switchgear Room Air Shaft 2

PFP #201 Fire Area/Zone: FZ 18.6-0, Service Bldg. 401'-0" ELEV. 3

Ground Floor

PFP #48 FZ 5.4-2, Aux. Bldg. 451' Div. 22 MEER 3

PFP #50 FZ 5.5-2, Aux. Bldg. 451' U2 AEER 4

Miscellaneous 21-04-MMD FLS Fire Drill Scenario No. 21-04 12/30/2020

Office

Procedures BAP 1100-10T Fire Drill Planning Checklist 0

OP-AA-201-003 Fire Drill Performance 18

Self-Assessments A-Shift-21-04 Fire Drill Record 02/01/2021

71111.07A Engineering BYR97-467 Component Cooling Heat Exchanger Tube Plugging 7

Evaluations Evaluation

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.11Q Miscellaneous LORT Scenario 02/25/2021

71111.12 Corrective Action 04396726 0VC Make Up Fan Trip 01/19/2021

Documents 04396745 Unit 2 RX Power Oscillating Since Last Outage 01/19/2021

71111.13 Corrective Action 4403035 NRC Identified Item on PBI 02/17/2021

Documents

Resulting from

Inspection

Miscellaneous UFSAR 9.4.5.1 Auxiliary Building HVAC 13

Procedures BAP 1100-3A3 Pre-Evaluated Plant Barrier Matrix 43

CC-AA-201 Plant Barrier Control Program 13

71111.15 Corrective Action 04397062 2B DG Tripped During Monthly Start 01/21/2021

Documents 4399739 Fire Damper oVC187Y Electro-Thermal Links Blown, 02/02/2021

Damper Open

4403121 0B SX CT Fan Oil Pressure Alarm 02/19/2021

4407267 U2 PDMS/PPC Problem Alarm 03/13/2021

Operability 441170 1FW009A, Main Feedwater Isolation Valve Hydraulic Pump 03/26/2021

Evaluations Was Cycling

Procedures OP-AA-108-115 Operability Determinations 24

71111.18 Engineering 632575 FCN-CAEO-40544: Decrease of Full Load Tref from 587 deg 03/03/2021

Changes F to 586.5 deg F

Work Orders 5093368 Revise Unit 1 RCS Program Reference Temperature in 03/03/2021

Ovation

71111.19 Corrective Action 4411158 0B Diesel Fire Pump Battery #2, Cell#1 Low Specific Gravity 03/24/2021

Documents

Corrective Action 4406587 NRC ID: Boric Acid Build up on 0PI-FC006 03/04/2021

Documents

Resulting from

Inspection

Procedures 2BOSR Comprehensive Inservice Testing (IST) Requirements for 10

5.5.8.CS.5-1c Containment Spray Pump 2CS01PA

Work Orders 4966365 1A CS PMT Following Maintenance 02/03/2021

5109618 0BOSR 10.B.2-1, Diesel Fire Pump Battery Monthly 03/26/2021

Surveillance

5115336 (NEIL) - 2CS01PA Comprehensive IST RQMTS for 02/19/2021

Inspection Type Designation Description or Title Revision or

Procedure Date

Containment Spray

26616 0BOSR 10.B.6-1, Diesel Fire Pump Monthly Surveillance 03/26/2021

5136033 Unexpected Auto Start of 0B Fire Pump 03/25/2021

71111.22 Miscellaneous STI BY-20-004 Revise Valve Alignment Verification Monthly Surveillance 03/01/2021

from Monthly to Quarterly

Procedures 1BOSR 7.5.4-2 Diesel Driven Auxiliary Feedwater Pump Monthly 32

Surveillance

2BOSR Group A Inservice Testing (IST) Requirements for Residual 12

5.5.8.RH.5-2a Heat Removal Pump 2RH01PB

Work Orders 5098934 (NEIL) - 2RH01PB Group A IST Requirements for RH Pump 01/22/2021

5115341 LR-2BOSR 8.1.2-1, 2A D/G Monthly Surveillance 02/03/2021

5118865 1BOSR 7.5.4-2, 1B AF PP Run 02/18/2021

71151 Miscellaneous Unplanned Power Changes Data from Logs (01/01/2020 -

2/31/2020)

71152 Corrective Action 4234300 Specific Gravity is Low on the 0D Dsl Drv FP Batt #2 03/29/2019

Documents 4399590 New PBI Required for 1A CS Pump Work Window 02/02/2021

4407661 Incorrect PBI Permit Generated for 2A RH PP Work Window 03/09/2021

Miscellaneous 0BOL 10.g LCOAR Fire Assemblies TRM LCO # 3.10.g for PBI 20-295 02/11/2021

and 296

OP-AA-201-007, "Sample" Fire Watch Inspection Log for 0DSD245/0DSD847 02/11/2021

PBI 20-295 CC-AA-201-F-01, Plant Barrier Impairment Permit for 02/11/2021

0DSD245

11