| LCR 89-12, Rev.1 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen: | | LCR 89-12, Rev.1 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen: |
| REVISED REQUEST FOR AMENDMENT l FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In a letter dated May 18, 1989, Public Service Electric and Gas Company (PSE&G) requested an amendment to Facility Operating License No. NPF-57. Technical Specifications (TS) Sections 3/4.2, B3/4.2, 5.3.1 and 5.3.2. The amendment request (LCR 89-12) was based upon guidance for removal of fuel cycle-specific operating limits from the TS as provided by NRC Generic Letter 88-16. Since the intent of the Generic Letter was to alleviate the burden on NRC and licensee resources associated with the processing of changes to cycle specific parameter limits that are developed according to NRC approved methodologies, PSE&G included, in that request, several changes to TS Der 2in Sections 5.3.1 and 5.3.2 which contain constraints on core 3isign configuration. | | REVISED REQUEST FOR AMENDMENT l FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In a {{letter dated|date=May 18, 1989|text=letter dated May 18, 1989}}, Public Service Electric and Gas Company (PSE&G) requested an amendment to Facility Operating License No. NPF-57. Technical Specifications (TS) Sections 3/4.2, B3/4.2, 5.3.1 and 5.3.2. The amendment request (LCR 89-12) was based upon guidance for removal of fuel cycle-specific operating limits from the TS as provided by NRC Generic Letter 88-16. Since the intent of the Generic Letter was to alleviate the burden on NRC and licensee resources associated with the processing of changes to cycle specific parameter limits that are developed according to NRC approved methodologies, PSE&G included, in that request, several changes to TS Der 2in Sections 5.3.1 and 5.3.2 which contain constraints on core 3isign configuration. |
| In subsequent discussions, NRC staff indicated that only changes directly covered by Generic Letter 88-16 should be in the change request dealing with removal of cycle-specific operating limits from the POWER DISTRIBUTION section of TS and that all other TS modifications should be submitted separately. Those portions of LCR 89-12 to which the NRC staff determined the Generic Letter does not directly apply are being submitted under a separate A go request. Tl fl The modifications in this request (LCR 89-12, Rev. 1) encompass the changes previously requested in LCR 89-12 and do not involve any additional technical issues. Our previously provided supporting information, analyses, and basis for a no significant hazards consideration determination remain applicable. Based upon the above, PSE&G believes that this revision to our amendment request, LCR 89-12, should not require additional public notice, s909010049 890B21 PDR ADOCK 050003S4 | | In subsequent discussions, NRC staff indicated that only changes directly covered by Generic Letter 88-16 should be in the change request dealing with removal of cycle-specific operating limits from the POWER DISTRIBUTION section of TS and that all other TS modifications should be submitted separately. Those portions of LCR 89-12 to which the NRC staff determined the Generic Letter does not directly apply are being submitted under a separate A go request. Tl fl The modifications in this request (LCR 89-12, Rev. 1) encompass the changes previously requested in LCR 89-12 and do not involve any additional technical issues. Our previously provided supporting information, analyses, and basis for a no significant hazards consideration determination remain applicable. Based upon the above, PSE&G believes that this revision to our amendment request, LCR 89-12, should not require additional public notice, s909010049 890B21 PDR ADOCK 050003S4 |
| -__-___n_____-_____pma__:_-_________-__-____________-_____-_--______ __ | | -__-___n_____-_____pma__:_-_________-__-____________-_____-_--______ __ |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML20196J4421999-07-0101 July 1999 Forwards Request for Addl Info Re Increase of Allowable Main Steam Isolation Valve (MSIV) Leak Rate & Deletion of MSIV Sealing Sys for Plant LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196F9441999-06-21021 June 1999 Forwards Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Two Violations of NRC Requirements Occurred Re Reactor Bldg Ventilation Setpoints & Control Rod Drop Analyses ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209C0621999-06-21021 June 1999 Forwards NPDES Discharge Monitoring Rept,May 1999, for Hcgs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML20195J1101999-06-0707 June 1999 Informs of Completion of Review of Providing Updated Status on Implementation of Commitments Made in Response to GL 89-13.Confirms Revs Made to Previous Commitments to Resolve Monitoring Pressure Drop Problem ML20195J1051999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Jw Clifford Will Be Section Chief for Hope Creek Generating Station ML20207F2681999-06-0303 June 1999 Responds to by Forwarding Gfes & NRC Written Exam Grades for List of Hope Creek Operators Submitted by DE Jackson.Absence of Gfes Grade Indicates That Operator Previously Issued RO or SRO License.Without Encl ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML20207D0201999-05-27027 May 1999 Discusses 990512 Meeting to Identify Insp Activities at Hope Creek Facility Over Next Six Months & Informs of Planned Insps in Order for Licensee to Have Opportunity to Prepare & Provide Region I with Feedback on Schedule Conflicts ML20195B9931999-05-20020 May 1999 Forwards NPDES Discharge Monitoring Rept,Apr 1999, for Hgcs.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML20207A3451999-05-20020 May 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20206Q6211999-05-14014 May 1999 Informs That on 990119 Licensee Provided NRC with Several Revised TS Bases Pages for Plant.Ts Bases Pages B 3/4 6-1 & B 3/4 6-2 Were Revised 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML20206P1931999-05-10010 May 1999 Provides Updated Status of Plant Implementation of Commitments to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment, Issued by NRC on 890718.Revised Commitments to Subject Gl,Listed 05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a1999-05-0404 May 1999 Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML20206D3301999-04-27027 April 1999 Submits Completion of Requested Actions for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept 05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl1999-04-0808 April 1999 Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek ML18106B1411999-03-30030 March 1999 Forwards Decommissioning Info on Behalf of Conectiv Nuclear Facility License Subsidiaries,Atlantic City Electric Co & Delmarva Power & Light Co,For Listed Nuclear Facilities 05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made1999-03-26026 March 1999 Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made LR-N990111, Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records1999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-354/98-302.Corrective Actions:Hope Creek Licensed Operator Training Completed Full Audit of 1998 Requalification Training Records LR-N990131, Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities1999-03-22022 March 1999 Documents Util Understanding of Info Contained in SER Re Amend 113 for HCGS Re Elimination of Restrictions Imposed by TS 3.0.4 for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N990132, Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 19971999-03-22022 March 1999 Forwards Revised TS Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 in 1997 LR-N990133, Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 1011999-03-22022 March 1999 Forwards marked-up TS Bases Page B 3/4 8-1d for LCR H98-11, That Was Submitted on 981216.Original Page Contained Editorial Errors That Had Been Incorporated Into Bases During Implementation of HCGS License Amends 100 & 101 ML18106B1071999-03-22022 March 1999 Forwards Annual Rept on Results of Individual Monitoring for Salem & Hope Creek Generating Stations,Iaw 10CFR20.2206.Info Provided on Encl Floppy Disk.Without Disk ML20206J4021999-03-10010 March 1999 Responds to NRC Oversight of Nuclear Plants Response to Y2K Bug.Consideration of More Aggressive Action to Forestall Any Y2K Problems,Requested LR-N990112, Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve1999-03-0505 March 1999 Requests Approval of ASME Code Case N-567,allowing Use of Replacement Valve for Containment Atmosphere Control Sys Valve That Was Constructed to Earlier Version of ASME Code than Existing Valve ML18106B0861999-03-0101 March 1999 Forwards Annual Repts for Salem & Hope Creek Generating Stations,Containing Data on Number of Station,Utility & Other Personnel Receiving Exposures Greater than 100 Mrem/ Year & Collective Exposures According to Work & Job 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H5391990-09-10010 September 1990 Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991 ML20059E6791990-09-0404 September 1990 Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21) ML20059E6821990-09-0404 September 1990 Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld ML20059D2531990-08-30030 August 1990 Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station ML20059E7021990-08-30030 August 1990 Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM ML18095A4391990-08-29029 August 1990 Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances ML20059D2191990-08-27027 August 1990 Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY ML20059C3051990-08-24024 August 1990 Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3 ML20059D2491990-08-24024 August 1990 Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies ML18095A3861990-07-30030 July 1990 Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML18095A3611990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML20055G1571990-07-17017 July 1990 Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program ML18095A3591990-07-13013 July 1990 Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items ML20055G4721990-07-11011 July 1990 Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion ML20055E5181990-07-0303 July 1990 Suppls Request for Noncode Temporary Repair of Svc Water Sys.Ultrasonic Exam of Area Surrounding Patch Will Include Samples,In Accessible Areas,Out to Diameter of 14 Inches ML18095A3301990-07-0202 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl ML18095A3231990-06-28028 June 1990 Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits ML18095A3211990-06-26026 June 1990 Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout ML20055D0351990-06-26026 June 1990 Forwards Addl Info Re Svc Water Sys Noncode Temporary Repair,Per 900621 Application.Util Will Perform Ultrasonic Testing of Pipe Wall Adjacent to Fillet Weld Repair & on Patch.Insps Will Be Performed at 90-day Intervals ML20044A6251990-06-21021 June 1990 Requests Approval of Temporary Noncode Repair of ASME Code Class III Piping Flaw.Flaw Located in 30-inch Diameter Moderate Energy Svc Water Line.Svc Water Sys Will Be Evaluated for Other Flaws,Per Generic Ltr 90-05 ML20043F3301990-05-31031 May 1990 Advises That Contrary to 891223 Commitment,Testing Procedures to Demonstrate Full Safety Function Flow for Certain Check Valves Have Not Been Revised.Failure to Comply to Commitment Due to Administrative Error ML20043B3631990-05-22022 May 1990 Forwards Revised Response to Request for Addl Info Re Bailey Solid State Logic Module (Sslm) Reliability for 1988 & 1989. Criteria Used to Monitor & Trend Bailey Model 862 Sslm Failure Rates Described in 900419 Ltr Modified ML20043B7231990-05-21021 May 1990 Forwards Revised Page 8 to Semiannual Radioactive Effluent Release Rept Forwarded on 900228.LER Being Prepared to Provide Details Re Liquid Radioactive Effluent Release Monitor Out of Svc for Greater than 30 Days ML18095A2261990-05-16016 May 1990 Forwards 1989 Annual Financial Repts of Pse&G,Atlantic City Electric Co,Delmarva Power & Light Co & Philadelphia Electric Co ML20043A1221990-05-14014 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 Rept for Hope Creek Generating Station,Unit 1 ML20042G6521990-05-10010 May 1990 Forwards Attachment 1,Plan Figure 4i for Incorporation Into Security Plan,Per 900212 Commitment.Encl Withheld (Ref 10CFR73.21) ML20042F9131990-05-0404 May 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Overfill Protection for Steam Generators in PWRs & Reactor Vessels in Bwrs.Operability of Overfill Protection Sys Assured by Performing Channel Checks Every 12 H ML18094B4451990-04-30030 April 1990 Responds to 900404 Request Re Station Blackout.Licensee Presently Reconstituting Station Blackout Project Team in Order to Fully Assess Third Party Audit Findings & Establish Scope & Schedule for Rework Activities ML20042F1271990-04-30030 April 1990 Advises of Change to Licensing Basis Commitment Re High/Low Pressure Interface Valves,Per 10CFR50.59.Util Intends to Restore Electric Power to Solenoid Operated Pilot Valves Associated W/High/Low Pressure Interfacing Sys ML20042F1311990-04-27027 April 1990 Provides Required Certification for Rev 2 to Updated FSAR for Hope Creek Generating Station.Through Administrative Oversight,Std Affidavit Transmitted in Lieu of Required Certification ML18094B4271990-04-17017 April 1990 Forwards Policy Statement on fitness-for-duty,in Response to Insp Repts 50-272/90-10,30-311/90-10 & 50-354/90-07.Policy Statement Will Be Disseminated to All Site Personnel as Attachment to Paychecks & Included as Part of Bid Spec ML18094B4071990-04-0909 April 1990 Forwards Corrected Pages to Rept Entitled, Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemp'S Ridley & Loggerhead Sea Turtles. Addl Mitigating Measures Will Be Incorporated to Minimize Effects on Turtle Species ML18094B3881990-04-0404 April 1990 Forwards Annual Rept for 1989 & Summary of Owners 1990 Projected Internal Cash Flow Statements ML18094B4051990-03-20020 March 1990 Provides List of Sources & Amounts of Financial Protection Carried on Plants,Per 10CFR50.54(w) ML18094B3641990-03-20020 March 1990 Responds to Generic Ltr 89-19 Re Overfill Protection for Steam Generators in PWRs & Reactors in Bwrs.Overfill Protection Sys Sufficiently Separate from Control Sys & Not Powered from Same Power Source ML20012D1361990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Violations Noted in Insp Rept 50-354/89-80.Corrective Actions:Periodic Mgt Evaluation of Procedure Writing Effort Will Be Conducted to Ensure That No Recurrence of Backlog Problems Occur ML20012B6391990-03-0808 March 1990 Provides Addl Info in Response to Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls,Including Comparison of Irradiation Embrittlement Predictions of Reg Guide 1.99,Revs 1 & 2 for Plant ML18094B3221990-02-28028 February 1990 Forwards Executed Amend 14 to Indemnity Agreement B-74 ML20006F3831990-02-16016 February 1990 Forwards 1989 Inservice Exam of Selected Class 1 & Class 2 Piping & Components at Hope Creek Generating Station & Sept/Oct 1989 Inservice Exam of Selected Class 1 & Class 2 Components at Hope Creek Generating Station. ML20011E6151990-02-12012 February 1990 Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21) ML18094B2861990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 Issuance ML20006B8721990-01-26026 January 1990 Forwards Progress Rept on Project to Upgrade Nuclear Site Physical Security Features.Encl Withheld (Ref 10CFR73.21) ML20006A8001990-01-19019 January 1990 Forwards Response to NRC 891220 Ltr Re Violations Noted in Plant Insps.Response Withheld (Ref 10CFR73.21) ML19354E7961990-01-19019 January 1990 Responds to NRC Bulletin 89-002 Re Anchor Darling Model S350W Swing Check Valves W/Type 410 Stainless Steel Internal Bolting.No Subj Anchor Darling Valves Installed at Facility. Valves of Similar Design Installed at Facility ML18094B2331990-01-0303 January 1990 Certifies Util Implementation of fitness-for-duty Program, Per 10CFR26.Training Element Required by Rule Completed on 891215.Chemical Testing for Required Substances Performed at Min Prescribed cut-off Levels,Except for Marijuana ML18094B2201989-12-27027 December 1989 Advises of Intent to Provide follow-up Response to Generic Ltr 89-10 by 900831 to Describe Status of Program, Recommendation Exceptions & Any Schedule Adjustments ML18094B2291989-12-27027 December 1989 Requests to Apply ASME Section XI Code Case N-460 to Facilities Re Reduction in Exam Coverage on Class 1 & 2 Welds.Fee Paid ML19332F3601989-12-0707 December 1989 Provides Clarification on Status of Rev 9 to Facility Odcm. Rev 10 Superceeds Rev 9 to ODCM Per 890320 Approval 1990-09-04
[Table view] |
Text
. - _ - _ - _ -
- p. *D '
)
Pubhe '3ervice Dectnc and Gas
. Company Steven E. Mittenberger - Public Service Electric and Gas Company P.O. Box 236. Hancocks Bridge, NJ C8038 609-339-4199 w.e r9emaem and chmt Nument Oficer August 21, 1989 NLR-N89160
Reference:
LCR 89-12, Rev.1 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:
REVISED REQUEST FOR AMENDMENT l FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 In a letter dated May 18, 1989, Public Service Electric and Gas Company (PSE&G) requested an amendment to Facility Operating License No. NPF-57. Technical Specifications (TS) Sections 3/4.2, B3/4.2, 5.3.1 and 5.3.2. The amendment request (LCR 89-12) was based upon guidance for removal of fuel cycle-specific operating limits from the TS as provided by NRC Generic Letter 88-16. Since the intent of the Generic Letter was to alleviate the burden on NRC and licensee resources associated with the processing of changes to cycle specific parameter limits that are developed according to NRC approved methodologies, PSE&G included, in that request, several changes to TS Der 2in Sections 5.3.1 and 5.3.2 which contain constraints on core 3isign configuration.
In subsequent discussions, NRC staff indicated that only changes directly covered by Generic Letter 88-16 should be in the change request dealing with removal of cycle-specific operating limits from the POWER DISTRIBUTION section of TS and that all other TS modifications should be submitted separately. Those portions of LCR 89-12 to which the NRC staff determined the Generic Letter does not directly apply are being submitted under a separate A go request. Tl fl The modifications in this request (LCR 89-12, Rev. 1) encompass the changes previously requested in LCR 89-12 and do not involve any additional technical issues. Our previously provided supporting information, analyses, and basis for a no significant hazards consideration determination remain applicable. Based upon the above, PSE&G believes that this revision to our amendment request, LCR 89-12, should not require additional public notice, s909010049 890B21 PDR ADOCK 050003S4
-__-___n_____-_____pma__:_-_________-__-____________-_____-_--______ __
~
Document Control Desk 08-21-89 NLR-N89160 Upon NRC approval of this proposed change, PSE&G requests that the amendment be made effective on the date of issuance, but j implementable within sixty days to provide sufficient time for any associated procedural modifications.
Pursuant to the requirements of 10CFR50.91(b) (1), PSE&G has provided a copy of this amendment request to the State of New Jersey and in accordance with 10CFR50.4 (b) (2) (ii) , this submittal l includes one (1) signed original and thirty-seven (37) copies.
Should you have any questions regarding this request, ve will be pleased to discuss them with you.
Sincerely,
, . m . / .t t.. /w L b ' A -
Attachments l Affidavit l
C Mr. W. T. Russell, Administrator USNRC Region I Mr. C. Y. Shiraki USNRC Licensing Project Manager Mr. G. W. Meyer USNRC Senior Resident Inspector Mr. K. Tosch, Chief, Bureau of Nuclear Engineering New Jersey Department of Environmental Protection l
-_____-________L
i1'
^
~
l_Q) ' f _I, 'l'_'
- ?k .p-w
[1 #; o b :..
l
-i l
REF: NLR-N89160' 'l I
l I . ..
l 1
P -' STATE OF NEW'. JERSEY
)-
!< 33, .i
)
. COUNTY OF. SALEM ) !
.j N
' Steven E. Miltenberger, being duly sworn according to law deposes
'T and says:
- l I am Vice President and Chief Nuclear Officer of Public Service l 1
Electric.and Gas Company, and as such, I find-the matters set y forth.in our letter.' dated August 21, 1989 ., concerning the Hope Creek Generating Station, are true to the best of my ,
knowledge, information and belief.
I l- 1 AE YhY"
/ j Subscribed}ndSwornto'beforeme 6 4 v # , 1989 this 1 / 57 day of J
O[to l
!!otary Public of New Jersey l i
i BLEElf N. OCNS WW NBLIC DF NEw Jggggy My Commission expires on y yCommission Empires J4 is y l
1
lu .
a 1 ATTACHNENT 1 L
l .
l PROPOSED CHANGE TO THE TECHNICAL SPECIFICATIONS L BOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 LCR 89-12, REV 1 l
! - I. DESCRIPTION OF THE PROPOSED CHAWGES l This; proposed License Change Request (LCR) would remove cycle-specific core operating limits from the Hope Creek Generating Station Technical Specifications.(TS). The Limiting Conditions for Operation (LCOs) for the-specific core-operating limits will still remain in the TS, but the actual values of the limits will appaar under separate cover, in a CORE OPERATING LIMITS REPORT generated by PSE&G. This document will be submitted upon
-issuance to the NRC and will be used by Hope Creek Operations throughout the applicable fuel cycle. The proposed changes are based on the guidance of Generic Letter 88-16, " Removal of Cycle-Specific Parameter Limits from Technical Specifications".
L The specific proposed changes are as follows:
Index. The index will be modified to include a new entry in the TS DEFINITION Section for the definition of the cycle-specific CORE OPERATING LIMITS REPORT. Entries for figures which show core operating limits will be deleted. An entry for the new REPORTING REQUIREMENTS associated with this report will be added. Renumbering of the items in the Index will also be done as required.
1.0 Definitions. A new definition will be added to define CORE OPERATING LIMITS REPORT which will be generated each cycle and referenced within i the Technical Specifications. Subsequent definitions will be renumbered i as required.
1 3/4.2.1 Average Planar Linear Heat Generation Rate. The LCO and surveillance requirements will be modified to remove all cycle-specific core operating limits and instead will reference the CORE OPERATING LIMITS REPORT.
3/4.2.3 Minimum Critical Power Ratio. The LCO and surveillance requirements will be modified to remove all cycle-specific core operating limits and instead will reference the CORE OPERATING LIMITS REPORT.
3/4.2.4 Linear Heat Generation Rate. The LCO and surveillance requirements will be modified to remove all cycle-specific core operating limits and instead will reference the CORE OPERATING LIMITS REPORT.
l l B3/4.2.1 and B3/4.2.3. The Bases for these sections will be revised to l remove references to core operating limit parameters which may change on l a cycle-specific basis or fuel limits which may form the input to another L core operating limit analysis which has been previously approved by the NRC. Any text removed from this section will appear in the CORE OPERATING LIMITS REPORT.
s 6.9.1 Routine Reports. A new reporting requirement will be added to this section which will require that the CORE OPERATING LIMITS REPORT be provided upon issuance to the NRC Document Control Desk, with copies to the Administrator, Region 1 and Resident Inspector.
II. REASON FOR THE PROPOSED CHANGES The major advantage of this amendment request is that routine changes to the thermal limits on the core operations can be made, using NRC approved methodology, without Technical Specification amendments. The current Technical Specifications require that the operating limits be submitted to the NRC in order to secure their approval prior to restart. This imposes a schedular constraint on the reload process by requiring finalization of the operating limits well in advance of restart to allow sufficient time for NRC review. This proposed change would remove an undue burden on NRC and PSE&G resources, as well as provide some schedular flexibility in the fuel cycle, by requiring only that the CORE OPERATING LIMITS REPORT be sent to the NRC upon issuance (i.e., prior to restart) . Changes to the Report may be made without prior NRC approval if they do not involve an Unreviewed Safety Question per 10CFR50.59 or a change to the Technical Specifications. Therefore, mid-cycle changes in core operating limits would also be made possible without the need for Technical Specification amendments from the NRC.
i III. JUSTIFICATION FOR THE PROPOSED CHANGES The NRC has encouraged licensees to propose Technical Specification changes that are consistent with the guidance provided in the enclosure to Generic Letter 88-16. This amendment request conforms to that guidance. Note that while Generic Letter 88-16 does not explicitly discuss changes to the BASES section, it is PSE&G's interpretation that such changes fall within the scope of " individual specifications" to which the Generic Letter refers.
In addition, it has been indicated that conforming amendments would be expeditiously reviewed by the NRC Licensing Project Manager for the facility.
The current core operating limit Technical Specifications assure that the l cycle-specific parameters are maintained within acceptable limits as defined I by the safety analyses. The corresponding BASES sections describe the regulatory and calculational bases of the core operating limits. Consistent j with Generic Letter 88-16, this amendment request proposes removal of cycle i specific parameters and cycle-specific aspects of their associated BASES sections. Since the information being removed from the Technical l Specifications is included in the CORE OPERATING LIMITS REPORT, which is l referenced by the Technical Specifications, implementation of this amendment !
request will not reduce the level of assurance provided by the existing '
Technical Specifications.
1 In summary, proposed specification 6.9.1.9 will require that the operating 1 limits be determined each cycle using NRC approved methodology. The l individual specifications in section 3/4 will retain the ACTION statements required in the event that any of the subject limits are exceeded.
Performance of surveillance to verify that the plant is operated within the subject limits will not be affected. Therefore, this amendment request is administrative in nature. i
_ __ _ ______________J
4 .
,~
IV. SIGNIFICANT HAZARDS CONSIDERATION EVALUATION The proposed changes to the HCGS Technical Specifications:
- 1. Do not involvt a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change will not affect the way that accidents will be evaluated. The accident analyses, and the associated core operating limits used as input to these analyses, will still be evaluated per General Electric Standard Application for Reactor Fuel (GESTAR II), which uses methods recognized and approved by the NRC. Operation of the core will still be governed by the Limiting Conditions for Operation (LCOs),
the requirements of which remain unchanged, but the limiting parameters for core operation in these LCOs will be reported in a separate document (CORE OPERATING LIMITS REPORT). Administratively controlling the limiting parameters in a separate document will not increase the probability of an accident occurring, nor increase the potential consequences of an accident, because the evaluation method is the same as that previously approved by the NRC.
Therefore, PSE&G has concluded that this amendment request does not involve a significant increase in the probability or consequences of an accident previously evaluated.
I
- 2. Do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Removing cycle-specific Technical Specifications in favor of placing them in the CORE OPERATING LIMITS REPORT and referencing them in the Technical Specifications does not involve any physical plant modifications per se, nor does it introduce any new operational configurations. It does, ;
however, offer the flexibility to refuel and restart and perform certain core design changes without cycle-specific Technical Specification amendments. These activities are still controlled by the Technical Specifications via reference to the CORE OPERATING LIMITS REPORT. NRC approved methodologies are still used to implement the changes, and plant specific evaluations pursuant to 10CFRSO.59 will be performed as )
required. !
Therefore, PSEGG has concluded that this amendment request does not )
introduce any new or different kind of accident from those previously i evaluated. l l
- 3. Do not involve a significant reduction in a margin of safety. ;
The development of core operating limits will still be done using the methods of GESTAR II, which have been previously approved by the NRC. !
These methods will set the limiting parameters for core operation such )
that the Safety Limits as defined by the Technical Specifications and i UFSAR safety analyses are not challenged. This proposed amendment will change the mechanism which reports these core operating limits. The i methodology for establishing the core operating limits has not been !
changed.
I l
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ D
l -o-Therefore, this amendment request does not involve a significant reduction in a margin of safety as defined in the basis for any Technical Specification.
V. CONCLUSION l As discussed above, PSE&G has concluded that the proposed changes to the HCGS Technical Specifications do not involve a significant hazards consideration since the changes: (i) do not involve a significar.t increase in the l probability or consequences of an accident previously evaluated, (ii) do not create the possibility of a new or different kind of accident from any previously evaluated, and (iii) do not involve a significant reduction in a margin of safety.