ML20065T058: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:T . | ||
SUSQUEHANNA STEAM ELECTRIC STAION . | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-387 | |||
= . ~ | |||
UNIT One | |||
, DATE Sept. 2, 1982 __ | |||
COMPLETED BY L.A. Kuczynski TELEPHONE (717) 542-2181 MONTH August, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 Zero 17 | |||
- Zero 2 Zero 13 Zero 3 Zero 19 f' / Zero . | |||
4 Zero 20 Zero 5 Zer 21 Zero 6 _ . _ , , _ | |||
Zero 22 Zero 7 .Zer Zero 23 8 . _ . | |||
Zero a _ | |||
Zero _ | |||
9 Zero - 25 Zero _ , _ | |||
10 Zero 26 Zero .- | |||
11 Zer Zero 27 12 Zer Zero 28 13 Zer Zero 29 14 Zero 30 Zero 15 . Zero 31 Zaro 16 Zero INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
~ | |||
(9/77) 8211020192 820914 | |||
, PDR ADOCK 05000387 R | |||
PDR | |||
e . | |||
g . | |||
OPERATING DATA REPORT DOCKET NO. 50-387 DATE Sept. 2, 1982 COMPLETED BY L. A. Kuczynski - | |||
TELEPHONE (717)542-2181 OPERATING STATUS | |||
~ | |||
: 1. Unit Name:Susquehanna Steam Electric Station Uniti Notes August, 1982 | |||
* MDC to ba determined- | |||
: 2. Reporting Period: | |||
3293 | |||
: 3. Licensed ThermalPower(MWt): | |||
: 4. Nameplate Rating (Gross MWe): 1280 x 0.9 = 1052 Fuel load completed | |||
: 5. Design Electrical Rating (Net MWe): 1052 - 41 = 1011 11:59 PM 8/8/82 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
/ / | |||
: 9. Power Level To Which Restricted,If Any (Net MWe): Zero | |||
: 10. Reasons For Restrictions.If Any: Unit in initial fuel load phase. License restriction to 5% thermal power (164.6 MWt). Turbine generator will not be synchronized at or below 5%. | |||
This Moet:: Y[ta.D.h c , ,, f, fl,,, | |||
I1. Hottrs In Reporting Period 0 0 0 f 2. N:imber Of Hours Reactor Was Critical 0 0 0 , | |||
: 3. Reactor Reserve Shutdown Hours 0 0 0 , | |||
: 14. Hours Generator On-Line 0 0 0 | |||
: 15. Unit Reserve Shutdown Hours 0 0 0 | |||
: 16. Gross Thermal Energy Generated'(MWH) 0 0 0 I". Gross Electrical Energy Generated (MWH) - | |||
0 ., | |||
0 0 | |||
: 18. Net Electrical Energy Generated (MWH) 0 0 0 | |||
: 19. Unit Service Factor N/A | |||
: 20. Unit Availability Factor N/A | |||
: 21. Unit Capacity Factor (Using MDC Net) N/A | |||
: 22. Unit Capacity Factor (Using DER Net) N/A | |||
: 23. Unit Forced Outage Rate N/A | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht: | |||
: 25. If Shut Down At End Of Report Period Estimated Date of Startup: 9/7/82 | |||
: 26. U. nits In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY 9/7/82 INITIAL ELECTRICITY 10/30/82 COMMERCIAL OPERATION 5/15/83 (4/77 ) | |||
( | |||
u I N | |||
/ o 7 | |||
7 SF: | |||
: n N | |||
) e .o SF c o hr e c de ud . | |||
el . | |||
d D | |||
a | |||
. t e | |||
2 I | |||
l | |||
- G- F- -E D. C B. AR - | |||
- e *go - | |||
OOAORRMEa tp dp ee aqs hemreg er i ale ufiu unin tpe o . | |||
(r ati s nt al innm c . | |||
Eoti xnr rot o rg ae $gEc pa ta Ty nn 3ge_ | |||
ct llir a a e F iEviR nr ene oa | |||
) r is fil o | |||
r nt gi r Tu e r | |||
( | |||
E &co t i | |||
s t( | |||
e 5 ;; 8m x E . | |||
pl c Ln i | |||
p x | |||
ai e l n n a j g,o 3' - | |||
s ni S | |||
) e E | |||
) @ g s. o= UU NS x o 5A" 2.r" . | |||
I Q | |||
a T S E U | |||
mi i l n R l l 1 | |||
a E UA t | |||
i o R P T N n | |||
pe vE i. | |||
L O D N oen e. | |||
c R OA r n s | |||
T WS t t e .* | |||
1 NT | |||
# e S E | |||
.0 A A f. | |||
N M i ; f !i | |||
_ I D E A P L i 432t .* c- u O CE OAMMt l | |||
e t g WT t | |||
ht uaah eo nn o 0? u s | |||
E R RI | |||
( | |||
r mluaal u d. t | |||
, R C Eat S E S pxic c r 1 DT 8c5. 9 UA aSa l ' . | |||
8 CT | |||
) | |||
icm nra. \' \ | |||
~ | |||
u3." , 2 TI I | |||
O m* ON | |||
. N S | |||
I r | |||
.? | |||
5 4 C | |||
P O E r C D x | |||
0EEfE o r x e | |||
u a T M h | |||
1 vn 6et h v | |||
e s E P UO i | |||
1 nr tyr Pi nae L L NC bi ) b ei t c | |||
& E PTE I | |||
TKE . | |||
t R Sp t Ri t | |||
E I | |||
ehaG per e cno oC l i | |||
DNT | |||
* ot eat - ut r O D AA N S r r oec r NBTM a | |||
m ( | |||
t siIon fns o t r | |||
e n t EYEE.O e Lr oru c i | |||
v S E e e ( | |||
o Lfc 7 .L S S 5 u RiDti | |||
) c eao 1 e S 0 r | |||
c Fnt 7 A p E - | |||
e is a n s | |||
) . t S 3 ele e ,!''l | |||
. 8 | |||
( 5 K U 7 N 4 u 2 n U 2 c , i | |||
- z t R 2 y 1 E 1 n 9 1 G. 8 s 8 1 k 2 i . | |||
\ | |||
J 1 l, 1 4 j | |||
e | |||
: s. . . | |||
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 9/7/82 Completed by L.A. Kuczynski Telephone (717) S42-2181 August 1982 Challanges to Main Steam Safety Relief Valves None. | |||
Changes to Offsite Dose Calculation Manual None. | |||
Major Changes to Radioactive Waste Treatment Systems The following changes were approved by the PORC during the month of August. | |||
: 1. Installation of permanent plant piping to facilitate hookup l of a vendor-supplied mobile radwaste processing system in-l side of the Radwaste Building. The piping added is connected to the liquid and solid radioactive waste treatment systems and l is provided in the event the plant systems are undergoing maintenance j or are inoperable. | |||
i | |||
: 2. Installation of a system which provides remote sampling capability i | |||
for solid radwaste batches prior to solidification of the batch. The system is intended to reduce personnel radiation exposures while performing sampling of the waste batch. | |||
l | |||
!}} |
Latest revision as of 02:52, 6 January 2021
ML20065T058 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 09/02/1982 |
From: | Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML20065T051 | List: |
References | |
NUDOCS 8211020192 | |
Download: ML20065T058 (4) | |
Text
T .
SUSQUEHANNA STEAM ELECTRIC STAION .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-387
= . ~
UNIT One
, DATE Sept. 2, 1982 __
COMPLETED BY L.A. Kuczynski TELEPHONE (717) 542-2181 MONTH August, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 Zero 17
- Zero 2 Zero 13 Zero 3 Zero 19 f' / Zero .
4 Zero 20 Zero 5 Zer 21 Zero 6 _ . _ , , _
Zero 22 Zero 7 .Zer Zero 23 8 . _ .
Zero a _
Zero _
9 Zero - 25 Zero _ , _
10 Zero 26 Zero .-
11 Zer Zero 27 12 Zer Zero 28 13 Zer Zero 29 14 Zero 30 Zero 15 . Zero 31 Zaro 16 Zero INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
~
(9/77) 8211020192 820914
, PDR ADOCK 05000387 R
e .
g .
OPERATING DATA REPORT DOCKET NO. 50-387 DATE Sept. 2, 1982 COMPLETED BY L. A. Kuczynski -
TELEPHONE (717)542-2181 OPERATING STATUS
~
- 1. Unit Name:Susquehanna Steam Electric Station Uniti Notes August, 1982
- MDC to ba determined-
- 2. Reporting Period:
3293
- 3. Licensed ThermalPower(MWt):
- 4. Nameplate Rating (Gross MWe): 1280 x 0.9 = 1052 Fuel load completed
- 5. Design Electrical Rating (Net MWe): 1052 - 41 = 1011 11:59 PM 8/8/82
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
/ /
- 9. Power Level To Which Restricted,If Any (Net MWe): Zero
- 10. Reasons For Restrictions.If Any: Unit in initial fuel load phase. License restriction to 5% thermal power (164.6 MWt). Turbine generator will not be synchronized at or below 5%.
This Moet:: Y[ta.D.h c , ,, f, fl,,,
I1. Hottrs In Reporting Period 0 0 0 f 2. N:imber Of Hours Reactor Was Critical 0 0 0 ,
- 3. Reactor Reserve Shutdown Hours 0 0 0 ,
- 14. Hours Generator On-Line 0 0 0
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated'(MWH) 0 0 0 I". Gross Electrical Energy Generated (MWH) -
0 .,
0 0
- 18. Net Electrical Energy Generated (MWH) 0 0 0
- 19. Unit Service Factor N/A
- 20. Unit Availability Factor N/A
- 21. Unit Capacity Factor (Using MDC Net) N/A
- 22. Unit Capacity Factor (Using DER Net) N/A
- 23. Unit Forced Outage Rate N/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: 9/7/82
- 26. U. nits In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY 9/7/82 INITIAL ELECTRICITY 10/30/82 COMMERCIAL OPERATION 5/15/83 (4/77 )
(
u I N
/ o 7
7 SF:
- n N
) e .o SF c o hr e c de ud .
el .
d D
a
. t e
2 I
l
- G- F- -E D. C B. AR -
- e *go -
OOAORRMEa tp dp ee aqs hemreg er i ale ufiu unin tpe o .
(r ati s nt al innm c .
Eoti xnr rot o rg ae $gEc pa ta Ty nn 3ge_
ct llir a a e F iEviR nr ene oa
) r is fil o
r nt gi r Tu e r
(
E &co t i
s t(
e 5 ;; 8m x E .
pl c Ln i
p x
ai e l n n a j g,o 3' -
s ni S
) e E
) @ g s. o= UU NS x o 5A" 2.r" .
I Q
a T S E U
mi i l n R l l 1
a E UA t
i o R P T N n
pe vE i.
L O D N oen e.
c R OA r n s
T WS t t e .*
1 NT
- e S E
.0 A A f.
N M i ; f !i
_ I D E A P L i 432t .* c- u O CE OAMMt l
e t g WT t
ht uaah eo nn o 0? u s
E R RI
(
r mluaal u d. t
, R C Eat S E S pxic c r 1 DT 8c5. 9 UA aSa l ' .
8 CT
)
icm nra. \' \
~
u3." , 2 TI I
O m* ON
. N S
I r
.?
5 4 C
P O E r C D x
0EEfE o r x e
u a T M h
1 vn 6et h v
e s E P UO i
1 nr tyr Pi nae L L NC bi ) b ei t c
& E PTE I
TKE .
t R Sp t Ri t
E I
ehaG per e cno oC l i
DNT
- ot eat - ut r O D AA N S r r oec r NBTM a
m (
t siIon fns o t r
e n t EYEE.O e Lr oru c i
v S E e e (
o Lfc 7 .L S S 5 u RiDti
) c eao 1 e S 0 r
c Fnt 7 A p E -
e is a n s
) . t S 3 ele e ,!l
. 8
( 5 K U 7 N 4 u 2 n U 2 c , i
- z t R 2 y 1 E 1 n 9 1 G. 8 s 8 1 k 2 i .
\
J 1 l, 1 4 j
e
- s. . .
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 9/7/82 Completed by L.A. Kuczynski Telephone (717) S42-2181 August 1982 Challanges to Main Steam Safety Relief Valves None.
Changes to Offsite Dose Calculation Manual None.
Major Changes to Radioactive Waste Treatment Systems The following changes were approved by the PORC during the month of August.
- 1. Installation of permanent plant piping to facilitate hookup l of a vendor-supplied mobile radwaste processing system in-l side of the Radwaste Building. The piping added is connected to the liquid and solid radioactive waste treatment systems and l is provided in the event the plant systems are undergoing maintenance j or are inoperable.
i
- 2. Installation of a system which provides remote sampling capability i
for solid radwaste batches prior to solidification of the batch. The system is intended to reduce personnel radiation exposures while performing sampling of the waste batch.
l
!