                                                    February 10, 1999
l
l
l
          Mr. Michael J. Colomb
          Site Executive Officer
:          New York Power Authority
t
          James A. FitzPatrick Nuclear Power Plant
!          P.O. Box 41
          Lycoming, New York 13093
          SUBJECT:        NRC INTEGRATED INSPECTION REPORT NO. 50-333/98-08
          Dear Mr. Colomb:
          This letter refers to the safety inspections conducted on November 22,1998, through
          January 10,1999, at the James A. FitzPatrick nuclear facility. The inspections were performed
          by the resident inspectors and regional specialists. The enclosed report presents the results of
          those inspections.
l
          During the inspection period you completed the refueling outage and returned the reactor to
          operation. Your conduct of these activities was generally characterized by safety-conscious
l          operations, sound engineering and maintenance practices, and careful radiological work
          controls. However, the evolution of draining the reactor cavity without any emergency core
          cooling systems (ECCS) operable, and the subsequent uncontrolled loss of 100 inches
          (15,000 gallons) of reactor water level due to reliance on a level indication that was undergoing
          maintenance, are examples of non-conservative planning and scheduling regarding readiness
          to respond to an inadvertent reactor vessel draindown. Once our concerns with the draining
          evolution were brought to your attention, you took appropriate action to stop the evolution and
          restore sufficient ECCS to an operable status prior to proceeding. The NRC is continuing to
l          review the events and willinform you of the results of our review.
          In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
          enclosures will be placed in the NRC Public Document Room. Should you have any questions          /
          regarding this report, please contact Mr. John Rogge at 610-337-5146.
                                                          Sincerely,
                                                            .
                                                                    ]-            -
                                                          John F. Rogge, Chief
                                                          Projects Branch 2
                                                          Division of Reactor Projects
          Docket No. 50-333
          License No. DPR-59
                                                  "
            9902170348 990210
            PDR    ADOCK 05000333
I            G                        PDR        ,
l-                                          0FFICIAL RECORD COPY                                    IE:01
l
l
 
      . . .        --.__ _ _ _. _ _ _ ..- _ _.. _ _ . - . _ .. _ _                      . _ . _ . - _ . - _ _ . _ . . - . . _ . _
  A                                                                                                                                l
                                                                                                                                    t
                                                                                                                                    !
    '
                                                                                                                                    i
                                                                                                                                    I
            MichaelJ.' Colomb                                            -2
            ' Enclosure Inspection Report 50-333/98-08 L                                                                            !
            cc w/ encl:
            C. D.' Rappleyea, Chairman and Chief Executive Officer
            E. Zeltmann, President and Chief Operating Officer
            R. Hiney, Executive Vice President for Project Operations
            J. Knubel, Chief Nuclear Officer and Senior Vice President .                                                            .
                                                                                                                                      I
            H. P. Salmon, Jr., Vice President of Engineering                  .
            W. Josiger, Vice President - Engineering and Project Management
            J. Kelly, Director ' Regulatory Affairs and Special Projects
                                        -
            T. Dougherty, Vice President . Nuclear Engineering
            R. Deasy, Vice President - Appraisal and Compliance Services
              R. Patch, Direc'o: - Quality Assurance
            G. C. Goldstein, Assistant General Counsel
            C. D. Faison, Director, Nuclear Licensing, NYPA
          . K. Peters, Licensing Manager                            .      .  _
                                                                                    .
            T. Morra, Executive Chair, Four County Nuclear Safety Committee
            . Supervisor, Town of Scriba
            C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
              P. Eddy, Electric Division, Depaitment of Public Service, State of New York
            G. T. Goering,~ Consultant, New York Power Authority
            J. E. Gagliardo, Consultant, New York Power Authority
              E. S. Beckjord, Consultant, New York Power Authority .
              F. William Valentino, President, Nrw York State Energy Research '
                and Development Authority
            J. Spath, Program Director, New York State Energy Research
                and Development Authority -
                                                                                                                                      1
i
                                                  1                                                                                  :
I'                                                                                                                                  .l
>
I
!.
r
?
;
                                                                                                                                      i
!
,
                    .-                                    . .      .  .          .  ..                  .
 
    .- .        - _ - - . . .        . ..-.    .. . . .  - - - -    .  .-          ~ - . - - -  .-
e.                                                                                                      !
l
!                                                                                                      i
'
  .                                                                                                    ,
I                                                                                                      l
l          MichaelJ. Colomb                                    3-
l          Distribution w/ encl:
l          H. Miller, RA/J. Wiggins, DRA (1)
l          Nuclear Safety information Center (NSIC)'
'
          PUBLIC -
!.        NRC Resident inspector
          Region 1 Docket Room (with concurrences)
          J. Rogge, DRP
l
'
        . R. Barkley, DRP
          R. Junod, DRP
L          Distribution w/ encl: (VIA E-MAIL)                                                          {
          G. Shear, RI EDO Coordinator                                                                ;
          S. Bajwa, NRR
          J. Williams, NRR                                                                            l
                                                                                                        i
          M. Campion, RI
          . Inspection Program Branch, NRR (IPAS)                                                      {
                                                                                                        l
        ~ R. Correia, NRR                                                                              '
          DOCDESK
                                                                                                        !
.
                                                                                                        I
l
                                                                                                        i
                                                                                                  -
!                                                                                                      l
l
l
l          DOCUMENT NAME: G:\ BRANCH 2A\FITZ9808.WPD
          To receive a copy of this document, indicate in the box: "C" = Copy without
          attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
            _
              OFFICE          Rl/DRP        , l  Rl/DRP _        l
l            NAME            RRasmussen //A/    JRogge W
i            DATE            02/ 6/99:          02/6 /99
                                  6
:                                                OFFICIAL RECORD COPY
,
}}
}}

Latest revision as of 21:04, 31 December 2020

Forwards Insp Rept 50-333/98-08 on 981123-990110.No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices
ML20203E923
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/10/1999
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20203E927 List:
References
50-333-98-08, 50-333-98-8, NUDOCS 9902170348
Download: ML20203E923 (3)


See also: IR 05000333/1998008

Text

-_. - . -_ - --- _ . - _ _ - .

9

! t

h

February 10, 1999

l

l

l

Mr. Michael J. Colomb

Site Executive Officer

New York Power Authority

t

James A. FitzPatrick Nuclear Power Plant

! P.O. Box 41

Lycoming, New York 13093

SUBJECT: NRC INTEGRATED INSPECTION REPORT NO. 50-333/98-08

Dear Mr. Colomb:

This letter refers to the safety inspections conducted on November 22,1998, through

January 10,1999, at the James A. FitzPatrick nuclear facility. The inspections were performed

by the resident inspectors and regional specialists. The enclosed report presents the results of

those inspections.

l

During the inspection period you completed the refueling outage and returned the reactor to

operation. Your conduct of these activities was generally characterized by safety-conscious

l operations, sound engineering and maintenance practices, and careful radiological work

controls. However, the evolution of draining the reactor cavity without any emergency core

cooling systems (ECCS) operable, and the subsequent uncontrolled loss of 100 inches

(15,000 gallons) of reactor water level due to reliance on a level indication that was undergoing

maintenance, are examples of non-conservative planning and scheduling regarding readiness

to respond to an inadvertent reactor vessel draindown. Once our concerns with the draining

evolution were brought to your attention, you took appropriate action to stop the evolution and

restore sufficient ECCS to an operable status prior to proceeding. The NRC is continuing to

l review the events and willinform you of the results of our review.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room. Should you have any questions /

regarding this report, please contact Mr. John Rogge at 610-337-5146.

Sincerely,

.

]- -

John F. Rogge, Chief

Projects Branch 2

Division of Reactor Projects

Docket No. 50-333

License No. DPR-59

"

9902170348 990210

PDR ADOCK 05000333

I G PDR ,

l- 0FFICIAL RECORD COPY IE:01

l

l

. . . --.__ _ _ _. _ _ _ ..- _ _.. _ _ . - . _ .. _ _ . _ . _ . - _ . - _ _ . _ . . - . . _ . _

A l

t

!

'

i

I

MichaelJ.' Colomb -2

' Enclosure Inspection Report 50-333/98-08 L  !

cc w/ encl:

C. D.' Rappleyea, Chairman and Chief Executive Officer

E. Zeltmann, President and Chief Operating Officer

R. Hiney, Executive Vice President for Project Operations

J. Knubel, Chief Nuclear Officer and Senior Vice President . .

I

H. P. Salmon, Jr., Vice President of Engineering .

W. Josiger, Vice President - Engineering and Project Management

J. Kelly, Director ' Regulatory Affairs and Special Projects

-

T. Dougherty, Vice President . Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Direc'o: - Quality Assurance

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

. K. Peters, Licensing Manager . . _

.

T. Morra, Executive Chair, Four County Nuclear Safety Committee

. Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

P. Eddy, Electric Division, Depaitment of Public Service, State of New York

G. T. Goering,~ Consultant, New York Power Authority

J. E. Gagliardo, Consultant, New York Power Authority

E. S. Beckjord, Consultant, New York Power Authority .

F. William Valentino, President, Nrw York State Energy Research '

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority -

1

i

1  :

I' .l

>

I

!.

r

?

i

!

,

.- . . . . . .. .

.- . - _ - - . . . . ..-. .. . . . - - - - . .- ~ - . - - - .-

e.  !

l

! i

'

. ,

I l

l MichaelJ. Colomb 3-

l Distribution w/ encl:

l H. Miller, RA/J. Wiggins, DRA (1)

l Nuclear Safety information Center (NSIC)'

'

PUBLIC -

!. NRC Resident inspector

Region 1 Docket Room (with concurrences)

J. Rogge, DRP

l

'

. R. Barkley, DRP

R. Junod, DRP

L Distribution w/ encl: (VIA E-MAIL) {

G. Shear, RI EDO Coordinator  ;

S. Bajwa, NRR

J. Williams, NRR l

i

M. Campion, RI

. Inspection Program Branch, NRR (IPAS) {

l

~ R. Correia, NRR '

DOCDESK

!

.

I

l

i

-

! l

l

l

l DOCUMENT NAME: G:\ BRANCH 2A\FITZ9808.WPD

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

_

OFFICE Rl/DRP , l Rl/DRP _ l

l NAME RRasmussen //A/ JRogge W

i DATE 02/ 6/99: 02/6 /99

6

OFFICIAL RECORD COPY

,