ML20205D769: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:l | ||
- | |||
\ | |||
l | |||
p*% UNITED STATES | |||
j | |||
- | |||
0 4 NUCLEAR REGULATORY COMMISSION I | |||
5 S | |||
E j REGloN IV | |||
<, ,8 611 RYAH PLAZA DRIVE, SulTE 400 | |||
'* ARLINGTON, TEXAS 76011-8064 | |||
,, g | |||
MAR 2 61999 | |||
Randall K. Edington, Vice President - Operations i | |||
River Bend Station | |||
- | |||
Entergy Operations, Inc. | |||
P.O. Box 220 .) | |||
St. Francisville, Louisiana 70775 | |||
' | |||
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-02 | |||
Dear Mr. Edington: | |||
This refers to the inspection conducted on January 24 through March 6,1999, at th'e River | |||
Bend Station facility. The en::losed report presents the scope and results of this inspection. | |||
During the 6-week period covered by this inspection, your conduct of activities at River Bend | |||
Station was generally characterized by safety-conscious operations, sound engineering and 1 | |||
maintenance practices, and careful radiological work controls. Based on the results of this ) | |||
inspection, the NRC has determined that one violation of NRC requirements occurred. This i | |||
violation is being treated as a noncited violation , consistent with Appendix C of the { | |||
Enforcement Policy. The NCV is described in the subject inspection report. | |||
) | |||
If you contest the violation or severity level of the noncited violation, you should provide a | |||
response within 30 days of the date of this inspection report, with the basis for your denial, to | |||
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555- ' | |||
0001, with copies to the Regional Administrator, Region IV, and the Director, Offico of ; | |||
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. l | |||
( | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its | |||
enclosure will be placed in the NRC Public Document Room (PDR). | |||
l | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them 1 | |||
with you. | |||
Sincerely, j | |||
' | |||
& S. 7/& g C ' | |||
Charles S. Marschall, Chief I | |||
Project Branch C | |||
Division of Reactor Projects | |||
Docket No.: 50-458 | |||
License No.: NPF-47 ) | |||
I' | |||
, | |||
9904020297 990326 | |||
PDR ADOCK 05000458 l | |||
G PDR J | |||
! | |||
.. - - - - - | |||
- . - - | |||
- | |||
I | |||
- | |||
. | |||
' | |||
MAR 2 61999 | |||
- | |||
, | |||
' Entergy Operations, Inc. | |||
; | |||
-2-- | |||
,. | |||
. | |||
. Enclosure: | |||
NRC Inspection Report No. | |||
' 50-458/99-02 ~ | |||
cc w/ enclosure: | |||
' Executive Vice President and , | |||
' | |||
Chief Operating Officer- | |||
Entergy Operations, Inc. | |||
P.O. Box 31995 | |||
' Jackson, Mississippi 39286-1995 | |||
' | |||
Vice President - | |||
Operations Support | |||
' Entergy Operations,'inc. | |||
P.OL. Box 31995 ' | |||
Jackson, Mississippi 39286-1995 | |||
General Manager ! | |||
' | |||
Plant Operations | |||
River Bend Station | |||
Entergy Operations, Inc. | |||
' P.O. Box 220" | |||
St. Francisville, Louisiana 70775 | |||
~' | |||
. | |||
Director - Nuclear Safety ' | |||
River Bend Station' | |||
; Entergy Operations, Inc. | |||
P.O. Box 220 - | |||
St; Francisville, Louisiana 70775 ; | |||
I' | |||
Wise, Carter, Child & Caraway | |||
P.O. Box 651 - | |||
Jackson, Mississippi 39205 - | |||
Mark J. Wettehahn Esq. | |||
' Winston & Strawn | |||
1401 L Street, N W. 4 | |||
, Washington, D.C. 20005-3502 | |||
Manager - Licensing. l | |||
River Bend Station i | |||
Entergy Operations, Inc. | |||
P.O. Box 220 ; | |||
St. Francisville, Louisiana 70775 l | |||
1 | |||
, | |||
r. | |||
] | |||
- | |||
j | |||
i | |||
!' | |||
. | |||
Entergy Operations,'Inc. -3- 1 | |||
The Honorable Richard P. leyoub | |||
Attorney General | |||
Department of Justice l | |||
State of Louisiana ~~ | |||
l | |||
P.O. Box 94005 | |||
Baton Rouge, Louisiana 70804-9005 | |||
H. Anne Plettinger | |||
l | |||
j | |||
3456 Villa Rose Drive i | |||
Baton Rouge, Louisiana 70806 l | |||
President of West Feliciana j | |||
Police Jury j | |||
P.O. Box 1921 | |||
~ | |||
i | |||
St. Francisville, Louisiana 70775 | |||
Ronald L. Wascom, Administrator | |||
Louisiana Department of Environmental Quality | |||
P.O. Box 82135 , | |||
Baton Rouge, Louisiana 70884 2135 l | |||
I | |||
1 | |||
I | |||
l | |||
l | |||
i | |||
1 | |||
! | |||
, | |||
, | |||
4. , | |||
- Entergy Operations, Inc. -4- | |||
:' E-Mail report to T. Frye (TJF) | |||
J E-Mail report to D. Lange (DJL)' _ . | |||
; E-Mail report to NRR Event Tracking System (IPAS) | |||
E-Mail report to Document Control Desk (DOCDESK) . | |||
E-Mail report to Richard Correia (RPC) | |||
E-Mail report to Frank Talbot (FXT) | |||
, | |||
bec to DCD (IE01), | |||
. _ | |||
. bec distrib'. by RIV: . | |||
' Regional Administrator l Resident inspector | |||
DRP Director - DRS-PSB | |||
DRS Director,- MIS System | |||
, . | |||
Branch Chief (DRP/C) RIV File | |||
- Project Engineer (DRP/C) | |||
Branch Chief (DRP/TSS) | |||
, | |||
) | |||
\ | |||
DOCUMENT N'AME: R:\_RB\RB902RP.GDR | |||
, | |||
To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy | |||
RIV:Rl:DRP/C SRI:DRP/C C:DRP/C | |||
NPGarrett ' ' /- GDReplogie L *- CSMarschall'E | |||
3/ ?-/99 3/ . * /99 3/ ' /99 | |||
< OFFICIAL RECORD COPY | |||
020039 | |||
1 | |||
. | |||
. | |||
Entergy Operations, Inc. -4- | |||
, E-Mail report to T. Frye (TJF) | |||
E-Mail report to D. Lange (DJL) | |||
E Mail report to NRR Event Tracking System (IFAS) | |||
- E-Mail report to Document Control Desk (DOCDESK) . | |||
E-Mail report to Richard Correia (RPC) | |||
E-Mail report to Frank Talbot (FXT) | |||
bec to DCD (IE01) | |||
~ bec distrib. by RIV: | |||
Regional Administrator' Resident inspector- | |||
'DRP Director DRS-PSB | |||
DRS Director MIS System - | |||
Branch Chief (DRP/C) RIV File | |||
Project Engineer (DRP/L) | |||
Branch Chief (DRP/TSS) | |||
I | |||
DOCUMENT NAME: R:(RB\RB902RP.GDR ) | |||
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy l | |||
RIV:RI:DRP/C SRI:DRP/C C:DRP/C | |||
NPGarrett @#/n GDReplogie f6ff/rn CSMarschallSh? | |||
" | |||
3/t(/99 3/2C/99 3/&/99 | |||
OFFICIAL RECORD COPY | |||
j | |||
a- I | |||
hm_ - | |||
}} | }} |
Latest revision as of 02:01, 30 December 2020
ML20205D769 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 03/26/1999 |
From: | Marschall C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Edington R ENTERGY OPERATIONS, INC. |
Shared Package | |
ML20205D773 | List: |
References | |
50-458-99-02, 50-458-99-2, NUDOCS 9904020297 | |
Download: ML20205D769 (5) | |
See also: IR 05000458/1999002
Text
l
-
\
l
p*% UNITED STATES
j
-
0 4 NUCLEAR REGULATORY COMMISSION I
5 S
E j REGloN IV
<, ,8 611 RYAH PLAZA DRIVE, SulTE 400
'* ARLINGTON, TEXAS 76011-8064
,, g
MAR 2 61999
Randall K. Edington, Vice President - Operations i
River Bend Station
-
Entergy Operations, Inc.
P.O. Box 220 .)
St. Francisville, Louisiana 70775
'
SUBJECT: NRC INSPECTION REPORT NO. 50-458/99-02
Dear Mr. Edington:
This refers to the inspection conducted on January 24 through March 6,1999, at th'e River
Bend Station facility. The en::losed report presents the scope and results of this inspection.
During the 6-week period covered by this inspection, your conduct of activities at River Bend
Station was generally characterized by safety-conscious operations, sound engineering and 1
maintenance practices, and careful radiological work controls. Based on the results of this )
inspection, the NRC has determined that one violation of NRC requirements occurred. This i
violation is being treated as a noncited violation , consistent with Appendix C of the {
Enforcement Policy. The NCV is described in the subject inspection report.
)
If you contest the violation or severity level of the noncited violation, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555- '
0001, with copies to the Regional Administrator, Region IV, and the Director, Offico of ;
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. l
(
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
l
Should you have any questions concerning this inspection, we will be pleased to discuss them 1
with you.
Sincerely, j
'
& S. 7/& g C '
Charles S. Marschall, Chief I
Project Branch C
Division of Reactor Projects
Docket No.: 50-458
License No.: NPF-47 )
I'
,
9904020297 990326
PDR ADOCK 05000458 l
G PDR J
!
.. - - - - -
- . - -
-
I
-
.
'
MAR 2 61999
-
,
' Entergy Operations, Inc.
-2--
,.
.
. Enclosure:
NRC Inspection Report No.
' 50-458/99-02 ~
cc w/ enclosure:
' Executive Vice President and ,
'
Chief Operating Officer-
Entergy Operations, Inc.
P.O. Box 31995
' Jackson, Mississippi 39286-1995
'
Vice President -
Operations Support
' Entergy Operations,'inc.
P.OL. Box 31995 '
Jackson, Mississippi 39286-1995
General Manager !
'
Plant Operations
River Bend Station
Entergy Operations, Inc.
' P.O. Box 220"
St. Francisville, Louisiana 70775
~'
.
Director - Nuclear Safety '
River Bend Station'
- Entergy Operations, Inc.
P.O. Box 220 -
St; Francisville, Louisiana 70775 ;
I'
Wise, Carter, Child & Caraway
P.O. Box 651 -
Jackson, Mississippi 39205 -
Mark J. Wettehahn Esq.
' Winston & Strawn
1401 L Street, N W. 4
, Washington, D.C. 20005-3502
Manager - Licensing. l
River Bend Station i
Entergy Operations, Inc.
P.O. Box 220 ;
St. Francisville, Louisiana 70775 l
1
,
r.
]
-
j
i
!'
.
Entergy Operations,'Inc. -3- 1
The Honorable Richard P. leyoub
Attorney General
Department of Justice l
State of Louisiana ~~
l
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
l
j
3456 Villa Rose Drive i
Baton Rouge, Louisiana 70806 l
President of West Feliciana j
Police Jury j
P.O. Box 1921
~
i
St. Francisville, Louisiana 70775
Ronald L. Wascom, Administrator
Louisiana Department of Environmental Quality
P.O. Box 82135 ,
Baton Rouge, Louisiana 70884 2135 l
I
1
I
l
l
i
1
!
,
,
4. ,
- Entergy Operations, Inc. -4-
- ' E-Mail report to T. Frye (TJF)
J E-Mail report to D. Lange (DJL)' _ .
- E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK) .
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
,
bec to DCD (IE01),
. _
. bec distrib'. by RIV: .
' Regional Administrator l Resident inspector
DRP Director - DRS-PSB
DRS Director,- MIS System
, .
Branch Chief (DRP/C) RIV File
- Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
,
)
\
DOCUMENT N'AME: R:\_RB\RB902RP.GDR
,
To receive copy of document, Indicete in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:Rl:DRP/C SRI:DRP/C C:DRP/C
NPGarrett ' ' /- GDReplogie L *- CSMarschall'E
3/ ?-/99 3/ . * /99 3/ ' /99
< OFFICIAL RECORD COPY
020039
1
.
.
Entergy Operations, Inc. -4-
, E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E Mail report to NRR Event Tracking System (IFAS)
- E-Mail report to Document Control Desk (DOCDESK) .
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
~ bec distrib. by RIV:
Regional Administrator' Resident inspector-
'DRP Director DRS-PSB
DRS Director MIS System -
Branch Chief (DRP/C) RIV File
Project Engineer (DRP/L)
Branch Chief (DRP/TSS)
I
DOCUMENT NAME: R:(RB\RB902RP.GDR )
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy l
RIV:RI:DRP/C SRI:DRP/C C:DRP/C
NPGarrett @#/n GDReplogie f6ff/rn CSMarschallSh?
"
3/t(/99 3/2C/99 3/&/99
OFFICIAL RECORD COPY
j
a- I
hm_ -