{{#Wiki_filter:,                  --                            . .-.  .  .    , ._ _      -.    .    .    - -
{{#Wiki_filter:}}
VIHOINIA ELP.cruic ann l'ownsit COMPANY
                          -                    lt ren noso, Vs uom:A cacos April 12, 1994 U. S. Nuclear Regulatory Commission                          Serial No. 94 214
            - Attention: Document Control Desk                            NL&P/JMJ:jm]
Washington, D.C. 20555                                        Docket Nos. 50-338-50-339 License Nos. NPF-4
                                                                                        . NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of March 1994.
Very truly yours,                                                                            j hkb            *)1' M. L. Bowling, Manager Nuclear Licensing & Programs Enclosure 1
cc:      U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323                                                                  l l
Mr. R. D. McWhorter                                                                !
NRC Senior Resident inspector                                                    .I North Anna Power Station                                                          i 940418o340 940331 8                                                                        b DR ADOCK 0500                                                                              i
            .o
 
      .f VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:  March    YEAR:  1994 i
Approved:
Station Manager-        .
 
o    _ ._            . .,                ..            _ _ - .                                        .        .                    _ _ _ _          .
r_        _ - .
b iz          .
OPERATING DATA CEPC3V DOCKET NO.:          50 338 DATE: April 4, 199 CONTACT: G. E. Kane
                                                                                                                                    ' PHONE: (703) 894 2101 OPERATING STATUS
: 1. Un i t N ame s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h Anna 1
: 2. Reporting Period:................ ........ March 1994
        " 3 .' Licensed Thermal Power (MWt) ......... ...                                                2,893                                                                        .
4 Nameplate Rating (Gross MWe):.............                                                      947
: 5. Design Electrical Rating (Net MWe):.......                                                    907
: 6. Maximum Dependable Capacity (Gross MWe):..                                                948
: 7. Maximum Dependable Capacity (Net MWe):....                                                900
        - 6. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons _ N/A
: 9. Power level to which restricted, if any (Net MWe): _ N/A
: 10. Reasons for restrictions, if any                                              N/A fnis Month              Y-t D                Cumulative
: 11. Hours in Reporting                Period...........................                              ....        744.0              2,160.0            138,276.0
,        .12. Number of Hours Reactor was                          Critical.....................                            744.0              2,160.0            102,565.7
: 13. Reac t or Reserve Shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . .                              0.0                    0.0              6,826.8 14.. Hours Generator 0n-Line..................................                                                      744.0              2,160.0              99,600.9
: 15. Unit Reserve shutdown Hours.................... .........                                                        0.0                    0.0                  0.0
: 16. Gross Thermal Energy Generated (MWH)..................... 2,151,451.6                                                        6,246,637.4            264,698,873.8
: 17. Gross Elec t ri cal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . .                            710,057.0        2,059,317.0            ~86,974,674.0 -
: 18. Net E lec t rical Energy Genera ted (MWH) . . . . . . . . . . . . . . . . . . . .                          676,247.0        1,960,632.0            82,367,217.0
: 19. Unit Service          Factor......................................                                              100.0%                  100.0%.                72.0%
        - 20. Unit Availability                Factor.................................                                        100.0%                  100.0%                72.0%
: 21. Uni t capac i t y F actor (usi ng MDC Net ) . . . . . . . . . . . . . . . . . . . . .                          101.0%-                100.9%                66.7%
: 22. Unit Capacity Factor (using DER                              Net).....................                        100.2%                  100,1%              .65.7%
: 23. Forced Outage Rate.......................................                                                        0.0%                    0.0%                10.5%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Refueling, 09/09/94, 48 days
: 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
        - 26. Units in Test Status (Prior to Connercial Operation):
Forecast            Achieved 1NITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
NORTH ANNA POWER STATION UNIT NO.:            1 MONTH:      March
 
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date          Time                        Data March 01, 1994        0000        Began month with unit at 100% power, 954 MWe.
March 11, 1994        1124        Commenced unit ramp-down for TVFT.
1210        Unit stable at approximately 92% power, 880 MWe for TVFT.
1259        TVFT completed satisfactorily. Commenced unit ramp-up to 100% power.
1523        Unit stable at 100% power, 951 MWe, March 16, 1994        0430        Commenced unit ramp-down to allow removal of 1-FW-E-1B from service due to excessive steam leakage.
0515      . Unit stable at approximately 99% power,      929    i
                                      .MWe.
l I
1708        Repairs complete.      Commenced ramp-up to 100%      )
power.                                                !
1 1737        Unit stable at 100% power, 955 MWe.
i March 31, 1994        2400        Ended month with unit at 100% power, 956 MWe.
I
 
                                                                                          'l Page  1  of __1 UNIT SHUTDOWN AND POWER REDUCTIONS                          ,
Explanation Sheet Docket No.:        50-338 Report Month March        Unit Name:    NA-1 Year    1994        Date  April 4. 1994
 
==Contact:==
G. E. Kane
                *No entry this month .
                                                                                            )
1 l
:l 1
1
                                  ..    , , . -                            ~  ~
 
                                                                                                                                                  ~
UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                      ,
f
$                                                                                                                        DOCKET NO.: 50-338 UNIT NAME:      NA-1                .
DATE: April 4, 1994                  5 REPORT MONTH: March 1994                                  CONTACT: G. E. Kane                  i PHONE: (703) 894-2101                !
1                    2            3                          4                  5                                    i
    -'No.        Date          Type . Duration Reason        Method of  Licensee    System          Component-            Cause & Corrective (hrs)                Shutting      Event        Code:                Code              Action to                  ;
i                                                              Down Reactor Report #                                            Prevent Recurrence            ,
CNo entry this month.
t t
1 1: Type                2: Reason            ..
3: Method                            4:
F= Forced            A=P,quipment Failure (explain)                        1= Manual                          Exhibit F - Instructions S= Scheduled        .B= Maintenance-or Test                                  2= Manual Scram:                    for preparation of Data C= Refueling                                          3= Automatic Scram                  Entry Sheets for' Licensee D= Regulatory Restriction                            4= Continuations                    Event Report (LER) _ File E= Operator-Training & License Examination            5= Load Reduction                    (NUREG-0161) i-                                F= Administrative                                      9=Other
                              -G= Operational Error                                                                      5:
H=.Other (explain)-                                                                        Exhibit H - Same Source 2
l
_._._m    .        ...-..-e  .-        -
                                                      . - .            -                                -.4_.-            .        _      _      __.    ;
 
A OPERATING DATA REPORT DOCKET.NO.:      50 339 DATE: April 4, 1994 CONTACT:  G. E. Kane PHONE: (703) 894 2101 OPERATING STATUS
    ' 1,      Uni t N ame s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N or th Anna 2
: 2. Report ing Per i od: . . . . . . . . . . . . . . . . . . . . . . . . . March 1994
    . 3,      Licensed Thermal Power (MWt) .............                                          2893 t4.      Nameplate Rating (Gross MWe):.............                                            947
: 5. Design Electrical Rating (Net HWe) .......                                                907
,      6. Maximum Dependable capacity (Gross MWe):..                                            935
: 7. Maximum Dependable Capacity (Net MWe) ....                                            887 G. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ___N/A J
: 9. Power level to which restricted, if any (Net MWe): ___N/A
: 10. Reasons for restrictions, if any:                                                            N/A This Month              Y-trD        Cumulative
: 11. Hours i n R epor t i ng Pe r i od. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .          744.0              2,160.0        116,544.0
: 12. Number of Hours Reactor was Critical.....................                                              744.0              2,143.9        96,517.5
: 13. Reactor Reserve' Shutdown Hours...........................                                                0.0 -                16.1        6,429.3 114. Hours Generator 0n-Line..................................                                                744.0              2,130.5        95,447.9
: 15. Unit Reserve Shutdown Hours..............................                                                0.0                  0.0            0.0 j      16. Gross Therma l Energy Generat ed (MWH ) . . . . . . . . . . . . . . . . . . . . 2,151,891.3                          6,083,188.8- -258,308,S46.5
: 17. Gross Electrical Energy Generated (MWH).................                                            698,883.0          1,972,533.0    84,568,009.0
      '18. Net Electrical Energy Generated (MWH).................... 665,239.0                                                    1,876,595.0    80,926,296.0.    -l
: 19. Unit Service        Factor....................................                                .      100.0%                98.6%          81.9%'
20.' Unit Availability            Factor.................................                                  100.0%                98.6%.          81.9%      l
: 21. Unit capacity Factor (using MDC                            Net).....................                    100.8%              .97.9%            77.1%
: 22. Unit Capacity Factor (using DER Net). ..................                                                98.6%                95.8%          76.6%
,.      23. Forced Outage Rate............................                                        ....      .        0.0%                  1.4% .          5.3%'
P
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_N/A i
                                                                                                                                                                    .l
: 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A                                    j
: 26. Units in Test Status (Prior to Commercial Operation):                                                                                                      j Forecast          Achieved                                            .,
INIT!AL CRITICAL!TT                                                                                                    .1 INITIAL ELECTRICITY COMMERCIAL OPERATION I
 
I AVERAGE DAILY UNIT POWER LEVEL Docket No.:        50-339 Unit:              NA-2 Dates          April 4,  1994
 
==Contact:==
G. E. Kane Phone:        (703) 894-2101 MONTH:  March 1994 DAY      AVERAGE DAILY POWER            DAY      AVERAGE DAILY POWER LEVEL (MWe-Net)                          -LEVEL (MWe-Net) 1              894                    17                894 2              894                    18                894 3              894                    19                894 4              894                    20                894 5              894                    21                894 6              895                    22                894 7              894                    23                895 8              895                    24                894 9              895                    25                890 10              B_H_4                  26                895 11              893                    27                895-12              894                    28                895 13              894                    29                896 14              894                    30.                895 15              894                    31                895 16              894 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.      Compute to the nearest whole megawatt.
 
                            -NORTH ANNA POWER STATION UNIT NO.:            2 MONTH:            March
 
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date              Time                          Data March 01, 1994        0000      Began month with unit at 100% power, 942 MWe.
March 25, 1994        0915      Commenced unit ramp-down for TVFT.
0954      Unit stable at 93% power, 875 MWe-for TVFT.
1058      TVFT            completed    satisfactorily.
Commenced          unit  ramp-up to 100%
power.
1225      Unit stable at 100% power, 936 Mwe.
March 31, 1994        2400      Ended month with unit at 100% power,          .
941 MWe.                                    -)
1 1
l
 
            .                                                                                s Page        1  of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:    50-339                                '
Report Month March    Unit Name:  NA-2 Year:  1994    Date: April 4, 1994
 
==Contact:==
G. E. Kane
              *No entry this month.
b l-h  '
 
  -t e
            .                                                s    e nase                e I
e    e              otnl                c        y iaei                r v    c              tDcF                u 1        i      n              c i                o 0          t    e              ufL)              S 9    4 e1              c    r              ro      R 3    9n2              eor                  t    rE            e
              '329 a-                  rtu                  snoL                m
                - - 1K4                r    c              nof(                a 0A          9          one                _Ii                  S 5N      ,    8        CoR                        tst)
                    .4E                    i                  - atr1              -
                            )        ~&tt                      reo6
:    l      3              cn              F a e p1            H
:iG0                eAe                      ph e 0 OEr          7          s    v              teSR-              t NMp:        (          u    e              ir          G      i AAT-C:              a    r            _b p ytE            b TN                    C      P          - i      rnR          i E      :AE                                  hrteU              h KTETN                                    .
xonvN              x CITNO                                  :EfEE(                :E ONAOH                                  4                      5 DUDCP              5 t                            m n                          a      n e                          rso ne                        mcni od                        aSot po                        r  ic mC                        cctu g
    ~S                                o                        Siad N                              C                            tue O                                              dllanR I                          4                  oaami                r T                                m              huuotde C                                ee            tnntnah' U                              td              eaauoot D                                so            MMMACLO E                                yC                    = =====
R                              S                :123459                            m 4                            3 R                  9 E                  9            e    #
W                  1            et C                                snt P                  h c
ner D                  r evo                                n a
cEp                                o N                            i        e                          i A                  M            L      R                          t                -
re a
S i
n N                  H                  r                          i                e W                  T        3          o                            m O                  N          f      t                            a D                  O            ogc                                x T
U M
die na                            E H                  T            otR                  )            e S                  R          ht                      n            s O            tun                  i            n T                  P            ehw                  a            e l
a m
I                  E            MSo                  l            c              e N                  R                  D              p        ni U                                                      x        oL 2                          e      i n                    (  t    t&                  %
o                        s    c s                    ee      ig      r a
e rT u
rn or)-
ti R                    lr i o snern eivEi e
n                    a        Rai        a o                  , Fe          rtll
.                                    i )                        c    yT a a p ts ar tngr nanortoe rnx          w rh                    enitosi(
u(            nmelatit D              o p t e l a n a 'r sinuurire                          <
h 6
1                  a uif g e m eh                      m e          t  e q a e e pd pt p          n  REMRROAOO                          v.
y          o          = =======
T            m  :ABCDEFGH 2
s                                        w i
h            d                            -
e          t              e t
_                                                              l a          y        du D            r          ed t  ece n  prh                                  A e  yoc TFS                                    m o          ==                              _
o          N    :    FS                              m N-
* 1                                      _
l
          '                  , ,  !;        ;l                                      .}}

Revision as of 22:58, 30 March 2020

Monthly Operating Repts for Mar 1994 for North Anna Power Station Units 1 & 2.W/940412 Ltr
ML20065J626
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/31/1994
From: Bowling M, Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
94-214, NUDOCS 9404180340