MONTHLY OPERATING REPORT SALEM GENERATING STATION | MONTHLY OPERATING REPORT SALEM GENERATING STATION | ||
'\:~*c>z:;*>* --~-<(~2~)) | '\:~*c>z:;*>* --~-<(~2~)) | ||
....,,f../// I | ....,,f../// I((~\_\/. | ||
In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you. | In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you. | ||
(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to: | (Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to: | ||
Line 48: | Line 47: | ||
APPENDIX B | APPENDIX B | ||
,. J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ,. J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
- 272 | - 272 UNIT , Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr. | ||
UNIT , Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr. | |||
TELEPHONE 609-365-7000 X507 MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 813 17 773 1,076 869 2 18 3 545 19 950 527 901 4* 20 1,070 21 819 5 | TELEPHONE 609-365-7000 X507 MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 813 17 773 1,076 869 2 18 3 545 19 950 527 901 4* 20 1,070 21 819 5 | ||
583 985 6 22 7 900 23 793 981 24 1,.031 8 | 583 985 6 22 7 900 23 793 981 24 1,.031 8 | ||
Line 64: | Line 61: | ||
*:u-::b | *:u-::b | ||
* 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD: | * 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD: | ||
744 | 744 | ||
: 2. OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET): 1079 DESIGN ELECTRICAL RATING(MWe-Net): 1090 | : 2. OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET): 1079 DESIGN ELECTRICAL RATING(MWe-Net): 1090 | ||
Line 76: | Line 72: | ||
9. | 9. | ||
UNIT RESERVE SHt1I'OOWN HOURS * * * * * * * | UNIT RESERVE SHt1I'OOWN HOURS * * * * * * * | ||
* GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * * * | * GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * * | ||
* 2,040,089 9.,202~949 | |||
2,040,089 9.,202~949 | |||
* 9,251,646 | * 9,251,646 | ||
: 10. GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). * | : 10. GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). * | ||
Line 102: | Line 97: | ||
<Df.1ERCIAL OPERATION 12-20-76 6-30':""77 8-1-7.Rl- | <Df.1ERCIAL OPERATION 12-20-76 6-30':""77 8-1-7.Rl- | ||
APPENDIX D DOCKET NO. 50.,-272 | APPENDIX D DOCKET NO. 50.,-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr. | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 | |||
DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr. | |||
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump | TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump | ||
* 77-82 7-31-77 F o.o H 4 Strainers | * 77-82 7-31-77 F o.o H 4 Strainers | ||
Line 141: | Line 132: | ||
* 77-102 8-21-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainers | * 77-102 8-21-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainers | ||
* 77-103 8-21-77 F o.o H 4 Clean 13A Circulator Traveling Screens | * 77-103 8-21-77 F o.o H 4 Clean 13A Circulator Traveling Screens | ||
* 77*.-104 8-23-77 | * 77*.-104 8-23-77 F o.o H 4 Clean 12, 13 Condensate PUmp Strainers | ||
F o.o H 4 Clean 12, 13 Condensate PUmp Strainers | |||
* 77-105 8-23-77 F 0.0 A 4 13 Condensate Pump Upper Bearing Cooler Repair | * 77-105 8-23-77 F 0.0 A 4 13 Condensate Pump Upper Bearing Cooler Repair | ||
* 77-106 8-27-77 F o.o D 4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirnits | * 77-106 8-27-77 F o.o D 4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirnits |
Latest revision as of 07:06, 28 February 2020
ML19030A351 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 09/09/1977 |
From: | Heller H Public Service Electric & Gas Co |
To: | NRC/IE, Office of Nuclear Reactor Regulation |
References | |
Download: ML19030A351 (6) | |
Text
Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 so-~1~
September 9, 1977
,,*(\5'*;~0~r~~?2);**. .
Director *",**1*.:-- lrEc'[.1':~,o. . . .':~\
Off ice of Inspection and Enforcement " Sr.*1-; I v,* '-.\
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
,....,f.'I
.. :~*-~ U.s,
- ". l\
- t UqE.4 CoM R REGu
~ 19J7 \~:J
\~-* \
I
- --1
. . ._:'\ trto;_1 ~:s~10,f4roR"1 ;~;-: /
... 1 * ..<.lto!J I , '/
MONTHLY OPERATING REPORT SALEM GENERATING STATION
'\:~*c>z:;*>* --~-<(~2~))
....,,f../// I((~\_\/.
In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you.
(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:
- 1. Mr. James P. O'Reilly (1 Copy)
Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406
- 2. Director, Office of Management Information (2 Copd:es) and Program Control US Nuclear Regulatory Commission Washington, DC 20555 Prior to August, 1977 the maximum dependable capability of Sale~ #1 Unit was based upon a circulating water inlet temperature of 70 F.
The revised M.D.C. for this unit will be 1079 (MWe - NetI. The ba~is for this value is a circulating water inlet temperature of 77 F. which is the summer rating basis dictated by the P.J.M.
interconnection.
Manager
)/~~lem q #~'1#~? Generating Station Enc.
The Energy People
APPENDIX B
,. J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
- 272 UNIT , Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 813 17 773 1,076 869 2 18 3 545 19 950 527 901 4* 20 1,070 21 819 5
583 985 6 22 7 900 23 793 981 24 1,.031 8
9 938 25 1,072 10 1,.076 26 1,011 11 910 27 533 723 934 12 28 257 902 13 29 418 30 816 14 1,069 841 15 31 16 . 1,070 Pg. 2-4 8.1-7.RL-
APPENDIX C OPERA'.llNG DATA REPOroe
~ ~Tn 50-272
~* IV* - - - - - - - - - - -
UNIT Salem No. 1 DATE 9-8-77
- ""*** COOLE!'ED BY J.M. Zupko, Jr.
OPERATING STA'IUS TELEPHJNE
- 609-365-7000 X507
- u-::b
- 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD:
744
- 2. OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET): 1079 DESIGN ELECTRICAL RATING(MWe-Net): 1090
- 3. roiiER LEVEL TO WHICli RESTRICTED (IF ANY) ()!We-Net) :__N_o_n_e_ _ _ __
- 4. REASONS FOR RESI'RICTION (IF ANY) : .
THIS MJNI'H YR TO DATE CtMJLATIVE S. NteER OF HJURS REACTOR WAS CRITICAL
- 726. 7. 4,487.7 4,789.3
- 6. REACl'OR RESERVE SHDTOOWN HOURS * * * *
- o.o . o.o o.o
- 1. HOURS GENERATOR ON LINE * * * ....... 718.6 4,090~5 4,130.8 o.o o.o o.o 8.
9.
UNIT RESERVE SHt1I'OOWN HOURS * * * * * * *
- GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * *
- 2,040,089 9.,202~949
- 9,251,646
- 10. GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). *
- 661,150 2,944,090 2,947,320 ll. NET ELECTRICAL ENERGY GENERATED (MMi) * * *
- 628, 9.9.6 2,722,594 2,722,594
- 12. REACTOR SERVICE FACTOR * * * * * * * * ** 9.7.7 89.6 89.6
- 13. REACTOR AVAILABILIT'f FACI'OR * . . . . . . .. ---- 9.7.7 89..6 89..6
- 14. UNIT SERVICE FACTOR * * * *
- 96.6 87.7
- 15. UNIT AVAILABILIT'f FACTOR
- I * * * . . 96.7
- 87.7 87.7 UNIT CAPACITY' FACTOR(Using MDC)* * . . . . . 78.4 67.9 67.9 16.
67.2 67.2
- 77 .6
- 18. UNIT FORCED OUI'AGE RATE I I * *
- I I I *
- 3 *4 12. 7. 12.7
- 19. SHUl'OOWNS SamootED OVEl NEXT 6 MJNIRS(TYPE,DATE,.AND DURATJ;ON OF EAQ1): 9-17-77 Modification of IDil Pressure Turbine. Scheduled cight week outage.
- r.;. 20. IF SHCIT OOl'IN AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST6.\RTUP: _ N/A
_..;;.;:~----
- 21. UNITS IN 'l'E.:l""T ST.ATUS(PRIOR TO CCMifERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITf 9-30-76 12-11-76 INITIAL ELECTRICITY 11-01-76 12-25-76 Pg. :3-4
<Df.1ERCIAL OPERATION 12-20-76 6-30':""77 8-1-7.Rl-
APPENDIX D DOCKET NO. 50.,-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump
- 77-82 7-31-77 F o.o H 4 Strainers
- 77-83 8...-1-77 F o*o.o H 4 Clean llA Circulator Traveling Screens
- 77.,..94 9.,..1.,...77 F o.o H 4 Clean llB Circulator Traveling Screens
- 77-85 8.,-3-77 F o.o H 4 Clean Condensate Pump Strainers
- 77-86 9.,...3.,...77 F o.o H 4 Clean 13A Circulator Traveling Screens 77-87 8-3-77 F 9. 7 G -3 Personnel error during routine testing of S.S.P.S., Train A
- 77":"'88 9.,...s.,...77 F 0.0 H 4 Clean 11, 12 S.G. Feed Pump Strainers.
- 77.,..99 8.,-6-77 F o.o H 4 Clean 12A & 13A Circulator Traveling Screens
- 77-90 8-9-77 F o.o H 4 Clean 13 Condensate Pump Strainers
SUMMARY
- *LOAD REDUCTION.
Pg.4-4 8.1-7.R 1
APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ~alernNo.l DATE August 8, 1977 "
COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 19 77 METHdD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS
- 77-91 8-9-77 F o.o A 4 llB Circulator Traveling Screen Spray Header Repair 77-92 B-11-77 F 0.0 A 4 13 Condensate Pump Upper Bearing
- Cooler Repair 77-93 8-11-77 F 0.0 A . 4. 11 Condensate Pump Upper Bearing
- Replacement
- 77-94 B-13-77 F o.o H 4 Clean 13 Condensate Pump Strainer 77-95 8.-13-77 F 8.4 A 3 12 S.G. Hi Fl011/lD Level Trip -
12 S.G. Feed Pump Auto/Manual Station Failure.
77-96 8-13-77 F 7.3 A 3 IDose Cover to Turbine Trip Plate Mechanism Causing Turbine to Unlatch.
- 77-97 8-17-77 F o.o H 4 Clean Condensate Pump Strainers
- 77-98 B-17-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainer
- 77-99 8.,.-18-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainer
- 77-100 8-18-77 F o.o H 4 Clean Condensate Pump Strainers SUMM.'\RY: *LOAD REDUCTION.
Pg. 4 -4 8.1-7.R 1
APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME (3alern No. 1 DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS
- 77-101 8-20-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainers
- 77-102 8-21-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainers
- 77-103 8-21-77 F o.o H 4 Clean 13A Circulator Traveling Screens
- 77*.-104 8-23-77 F o.o H 4 Clean 12, 13 Condensate PUmp Strainers
- 77-105 8-23-77 F 0.0 A 4 13 Condensate Pump Upper Bearing Cooler Repair
- 77-106 8-27-77 F o.o D 4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirnits
- 77-107 8-28-77 F 0.0 H 4 Clean 12, 13 Condensate Pump Strainers
SUMMARY
- *LOAD REDUCTION.
Pg.4-4 8.1-7.R 1