ML19305B837: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:* 5                      . 2: ,  C F.C II ' L _. I '        - C ' T''
{{#Wiki_filter:* 5                      . 2: ,  C F.C II ' L _. I '        - C ' T''
                                . .. ; -  _
                                              - , . -
_    .
    -
716 Edney Building MAR 141980 Mr. Janes P. O'Reilly, Director U.S. Nuclear Regulatory Con.uission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, GeorSi a 30333
716 Edney Building MAR 141980 Mr. Janes P. O'Reilly, Director U.S. Nuclear Regulatory Con.uission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, GeorSi a 30333
                                                                        .


==Dear Mr. O'2ailly:==
==Dear Mr. O'2ailly:==

Latest revision as of 23:12, 21 February 2020

Forwards LER 80-001/01T-0
ML19305B837
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/14/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305B838 List:
References
NUDOCS 8003200461
Download: ML19305B837 (1)


Text

  • 5 . 2: , C F.C II ' L _. I ' - C ' T

716 Edney Building MAR 141980 Mr. Janes P. O'Reilly, Director U.S. Nuclear Regulatory Con.uission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, GeorSi a 30333

Dear Mr. O'2ailly:

TCINESSEE V.'.LLEY AUTECRITY - SEQUOY/Ji NUCLEAR PL/JIT UNIT 1 - DOC;;2T NO. 50-327 - FACILITI OPERATING LICENSE DPR REPORT /0LE OCCUPdCl:CE REPCRT 3QRO-50-327/8001 The enclosed ro;. ort provides details concerning failure to estimate flowrate f rott. the service building c::haust during initial fuel loading. Tae report is subnitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.12.b.

Very truly yours, TCR!ESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of Management Information and Progrca Control U.S. Nuclear Regulatory Comdssion Washington, DC 20555 [

Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Cornission Washington, DC 20555 Mr. Bill Lavallee i Nuclear Safety Analysis Center '

Palo Alto, California 94303 i

Mr. W. T. Cottle, NRC Inspector, Sequoyah Aco2 s,

, ,1 _3 :.,e 2,: c -

//

8 0 03 20 0 Sf> (

_ .