ML19305B837

From kanterella
Jump to navigation Jump to search
Forwards LER 80-001/01T-0
ML19305B837
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/14/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305B838 List:
References
NUDOCS 8003200461
Download: ML19305B837 (1)


Text

  • 5 . 2: , C F.C II ' L _. I ' - C ' T

716 Edney Building MAR 141980 Mr. Janes P. O'Reilly, Director U.S. Nuclear Regulatory Con.uission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, GeorSi a 30333

Dear Mr. O'2ailly:

TCINESSEE V.'.LLEY AUTECRITY - SEQUOY/Ji NUCLEAR PL/JIT UNIT 1 - DOC;;2T NO. 50-327 - FACILITI OPERATING LICENSE DPR REPORT /0LE OCCUPdCl:CE REPCRT 3QRO-50-327/8001 The enclosed ro;. ort provides details concerning failure to estimate flowrate f rott. the service building c::haust during initial fuel loading. Tae report is subnitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.12.b.

Very truly yours, TCR!ESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Office of Management Information and Progrca Control U.S. Nuclear Regulatory Comdssion Washington, DC 20555 [

Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Cornission Washington, DC 20555 Mr. Bill Lavallee i Nuclear Safety Analysis Center '

Palo Alto, California 94303 i

Mr. W. T. Cottle, NRC Inspector, Sequoyah Aco2 s,

, ,1 _3 :.,e 2,: c -

//

8 0 03 20 0 Sf> (

_ .