ML18227A399: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 31: | Line 31: | ||
(MWe-Net) (MWe-Net) h | (MWe-Net) (MWe-Net) h | ||
.17 671 18 671 3 678 19 669 | .17 671 18 671 3 678 19 669 | ||
..20 '669 5 '27 21 6 672 '2 7 428 - 23 619'12 8 667 24 9 682 25 10 684 26 680 .'7 | ..20 '669 5 '27 21 6 672 '2 7 428 - 23 619'12 8 667 24 9 682 25 10 684 26 680 .'7 668 28 503 13 678 29 683 14 677 15 675 673 NOTE: Average Daily Power Level greater than 666 Mwe due to cooler condenser. cooling water. | ||
668 28 503 13 678 29 683 14 677 15 675 673 NOTE: Average Daily Power Level greater than 666 Mwe due to cooler condenser. cooling water. | |||
'h ~ | 'h ~ | ||
Line 40: | Line 38: | ||
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 250 UNIT, REPORT MONTH Februar , 1976 | APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 250 UNIT, REPORT MONTH Februar , 1976 | ||
'DATE March 3, 1976 COMPLETED BY V. T. Chilspn TELEPHONE (305) 552 3830 OPERATING STATUS GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400 76 02 29 2~ CURRENTLY AUTHOAZZEf) P4WER LEVEL (MWt): | 'DATE March 3, 1976 COMPLETED BY V. T. Chilspn TELEPHONE (305) 552 3830 OPERATING STATUS GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400 76 02 29 2~ CURRENTLY AUTHOAZZEf) P4WER LEVEL (MWt): | ||
MAX. DEPEND. CAPACITY (MWe-Net): | MAX. DEPEND. CAPACITY (MWe-Net): | ||
Line 47: | Line 44: | ||
7 REACTOR RESERVE SHUTDOWN HOURS GENERATOR ON LINE............ | 7 REACTOR RESERVE SHUTDOWN HOURS GENERATOR ON LINE............ | ||
~ ~ ~ | ~ ~ ~ | ||
547.2 1 260.8'8.6 15.4 21 630.8 | 547.2 1 260.8'8.6 15.4 21 630.8 | ||
: 9. GROSS THERMAL ENERGY GENERATED (K&)..... 1 177,919 2 718 254 40 030 514 12+ -REACTOR SERVICE FACTOR................... 81.4 89.9 '79.5 13 'EACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ 81.4 90. 9 79,6 14 UNIT SERVICE FACTOR. .... .. .. | : 9. GROSS THERMAL ENERGY GENERATED (K&)..... 1 177,919 2 718 254 40 030 514 12+ -REACTOR SERVICE FACTOR................... 81.4 89.9 '79.5 13 'EACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ 81.4 90. 9 79,6 14 UNIT SERVICE FACTOR. .... .. .. |
Latest revision as of 19:42, 2 February 2020
ML18227A399 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/03/1976 |
From: | Florida Power & Light Co |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML18227A399 (14) | |
Text
U.S. NUCLEAR REQULATORV COMMISSION DOCKET NUMBER NRC FORM 195 g-7G) 50-250 FILE NUMBER NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL MONTHLY REPORT FRDNI: Flordia Power 5 Light Co. DATE OF DOCUMENT SUNRC t1iami, Fla. 3-5-76 USNRC A.D. Schmidt DATE RECEIVED 3-9-76 OLETTER ONOTORI2ED PROP INPUT FORM NUMBER OF COPIES RECEIVED
@ORIGINAL 53 UN C LASS IF I E 0 OCOPV LETTER TRANS THE FOLL(NING: MO)THLY REPORT FOR Februar 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN PREPARI',~ ".; "OOK BY PLANS & OPERATICI.S.
~~1>,'T~gt'P PLANT NAME Turkey Point II 3 Im 4 FOR ACTION/INFORMATION S B 3-10-76 MIPC 01 CYS FOR ACT ON INTERNAL D IST Rl BUTION E L BRANCH CHIEF L ~ Lear EXTERNAL DISTRIBUTION CONTROL NUMBER 2394 NRC FORM 195 (2 7G) f ~ 'h
C P
~ ~ <<~
MAR 9 tspg + -'<
o~ig-"s.'oy a,';g
~
r APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turke Point Unit. No. 3 DATE 3 1976 COMPLETED BY V. T.'hilson TELEPHONE 1
MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .
(MWe-Net) (MWe-Net) h
.17 671 18 671 3 678 19 669
..20 '669 5 '27 21 6 672 '2 7 428 - 23 619'12 8 667 24 9 682 25 10 684 26 680 .'7 668 28 503 13 678 29 683 14 677 15 675 673 NOTE: Average Daily Power Level greater than 666 Mwe due to cooler condenser. cooling water.
'h ~
E.g I ,~ I
~ ~
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 250 UNIT, REPORT MONTH Februar , 1976
'DATE March 3, 1976 COMPLETED BY V. T. Chilspn TELEPHONE (305) 552 3830 OPERATING STATUS GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400 76 02 29 2~ CURRENTLY AUTHOAZZEf) P4WER LEVEL (MWt):
MAX. DEPEND. CAPACITY (MWe-Net):
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):. NONE 4~ REASONS FOR RESTRICTION (ZF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL..... 566.2 19294.1 22,574.2 HOURS.... .. 6~
7 REACTOR RESERVE SHUTDOWN HOURS GENERATOR ON LINE............
~ ~ ~
547.2 1 260.8'8.6 15.4 21 630.8
- 9. GROSS THERMAL ENERGY GENERATED (K&)..... 1 177,919 2 718 254 40 030 514 12+ -REACTOR SERVICE FACTOR................... 81.4 89.9 '79.5 13 'EACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ 81.4 90. 9 79,6 14 UNIT SERVICE FACTOR. .... .. ..
~ . 78.6 87.6 76.2 15+ UNIT AVAILABILITYFACTOR.... ....- . 78.6 87.6 76.5
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 7
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 74.7 83.7 62.0 18 'NIT FORCED OUTAGE RATE... ~ ...... .. ~ .~. 0.0 0.3 3.6 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE g DATE g AND DURATION OF EACH)
NONE 20 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
ACHIEVED
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST CINITIAL CRITICALITY INITIAL ELECTRICITY CONf KRCIAL OPERATION
II I
APPENDIX D DOCKET NO. 50 - 250 (1) BMSON UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turke Point Unit No. 3 A EQUIPMENT FAZLURE (EXPLAIN)
B- viAINT OR TEST ~ DATE. March 3 1976 C: REFUFLING D: PNGULATORY RESTRICTION COMPLETED. BY V. T. Chilson E: OPERATOR TRAINING AND LICENSE EXAMINATION TELEPHONE (305) 552 3830 F: ADMINISTRATIVE G: OPEFATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD METHOD OF
~ EQUAL TYPE SHUTTING DOWN 2: MANUAL SCRAM F: FORCED DURATIOiV THE REACTOR OR j 3: AUTOI1ATIC SCRAM NO. DATE S: SCHEDULED . (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COi<M>NTS 4 OTHER (EXPLAIN) 05 76-02-07 Load on Unit No. 3 was reduced to approximately 250 MWe (46 % R.P.) to locate and repair condenser tube leak.
Corrective action waa to 'repair tube leak. (Non-Nuclear Nyaya) 06 76-02-21 S 148.8 'A Unit No. 3 was removed from service to locate and repair tube leak in steam generator No. 3B. There were no significant quantities of rddioactive materials released as a result of this small leak. Corrective action was to plug leaking tube. (Nuclear System) gnlontRF: Unit No. 3 operated at approximately 100 % R.p. during month except for load reduction 'on February 7 and outage for steam generator No. 3.B'tube leak repair, February 21 to 28, 1976.-
s APPENDIX B "AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 251 UNIT Turke Pox.nt Unzt No. 4 DATE March 3, 1976 COMPLETED BY V. T. Chilson TELEPHQNE 305) 552 - 3830 MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 687 17 686 687 18 683 3 687 19 682 683 20 679 5 683 21 681 6 683 22 683 683 23 684 8 690 24 689 9 691 25 689 10 693 26 688 691 27 685 12 687 28 683 13 681 29 597 14 689 15 16 685 NOTE: Average Daily Power .
Level greater than 666 MWe due to cooler condenser cooling water.
4 r
APPENDIX C OPERATING DATA REPORT REPORT MONTH I
Februar 1976 DOCKET NO. 50 251 UNIT Turke DATE March 3 P 'n 1976 No. 4 COMPLETED BY V. T. Chilson TELEPHONE 305 552 3830 OPERATING STATUS 1 REPORTING PERIOD: 0001 76 02 01 GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400, 76 02 29 2 CURRENT LEVEL (MWt): 2 200 MAX. DEPEND. CAPACITY (MWe-Net): 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NO
'4 ~ REASONS FOR RESTRICTION (ZF ANY):
llew THIS MONTH YEAR TO DATE CUMULATIVE 6~ REACTOR RESERVE SHUTDOWN HOURS........... 117. 1 7 HOURS GENERATOR ON LINE...............
.9. GROSS THERMAL ENERGY GENERATED (KGi)..... 1 517 932 2 636 028 33 284 664 NET ELECTRZCAL ENERGY GENERATED (M'FJ) ~
- 12. REACTOR SERVICE FACTOR... ...-- - . .. 100.0 87.
13 'EACTOR AVAILABILITYFACTOR.............. 0
- 14. UNIT SERVICE FACTOR...... ~ ~ ~ ~ ~ .. ~ ~ ~ ~ . ~ ~ 100.0 84.6 15 'NIT AVAILABILITYFACTOR. ...... ~ ... ..
~ ~ .
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 85.6
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 82.2 67.
18 'NIT FORCED OUTAGE RATE. ~ . ~ ... .... .' ~ ~
I 3.6 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~ DATE g AND DURATION OF EACH)
Refueling, Maintenance, and Inspections April 19 through May 30, 1976.
20 ~ 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21 'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)! FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- NOTE: UNIT CAPACITY FACTOR (Using MDC) greater than 100 % due to cooler condenser cooling water.
4.4~
J
~ w
APPENDIX D DOCKET NO ~ 50 251 (1) UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turke Point Unit No. 4 EQUIPMENT FAILURE (EXPLAIN),
B: MAINT. OR TEST ~ DATE March 3, 1976 C F ~FUELING D: RE ULATORY RESTRICTION COMPLETED. BY V T. Chilson E: OPEPATOR TRAINING AND LICENSE EXAMINATION TELEPHONE (30~) 552 3830 F: AD.'liNISTRATIVE G: OPE?ATIONAL ERROR (EXPLAIN)
H: OTHFR (EXPLAIN)
."ANNUAL f 2) Y~THOD METHOD OF 1: TYPE SHUTTING DOWN 2: PANUAL SCRAM F: FORCED DURATION THE REACTOR OR 3: AUTOMATIC SCRAM NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING PObER(2) CORRECTIVE ACTIONS COP~ANTS 4: OTHFR (FXPLAIN) 08 76-02-29 S Load on Unit No. 4 was reduced to approximately 200 MVe to perform periodic test of turbine main steam stop, reheat steam stop, and reheat intercept valves.
(Non-Nuclear System)
RURRRRY Unit No 4 o.perated at approximately 100 % R.p. daring month except for load redaction on pehruary 29, 1976 to perform periodic test of turbine valves.
(