Attached February, 1976, Operating Status Reports for Turkey Point Unit Nos. 3 & 4
ML18227A399
Person / Time
Site: Turkey Point  
Issue date: 03/03/1976
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A399 (14)


Text

NRC FORM 195 U.S. NUCLEAR REQULATORV COMMISSION g-7G)

NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-250 FILE NUMBER MONTHLY REPORT SUNRC USNRC FRDNI:

Flordia Power 5 Light Co.

t1iami, Fla.

A.D. Schmidt DATE OF DOCUMENT 3-5-76 DATE RECEIVED 3-9-76 OLETTER

@ORIGINAL OCOPV ONOTORI2ED 53 UN C LASS IF I E 0 PROP INPUT FORM NUMBER OF COPIES RECEIVED LETTER TRANS THE FOLL(NING:

MO)THLY REPORT FOR Februar 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY'HISREPORT TO BE USED IN PREPARI',~

"OOK BY PLANS & OPERATICI.S.

~~1>,'T~gt'P PLANT NAME Turkey Point II 3 Im 4 MIPC 01 CYS FOR ACT ON FOR ACTION/INFORMATION S

B 3-10-76 E

L INTERNALD ISTRl BUTION BRANCH CHIEF L

~

Lear EXTERNALDISTRIBUTION CONTROL NUMBER 2394 NRC FORM 195 (2 7G) f ~

'h

C P

~

~<<~

MAR 9 tspg +

g-"s.'oy ~

o~i a,';g r

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Turke Point Unit. No.

3 DATE 3

1976 COMPLETED BY V. T.'hilson TELEPHONE 1

MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) h

.17 671 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3 678 18 19

..20 671 669

'669 5

'27 6

672 7

428 8

667 9

682 10 684 680 21'2 23 24 25 26

.'7 619'12 13 14 15 668 678 677 675 673

"" 28 29 NOTE:

503 683 Average Daily Power Level greater than 666 Mwe due to cooler condenser. cooling water.

'h ~

E.g I

, ~

I

~

~

APPENDIX C OPERATING DATA REPORT REPORT MONTH Februar 1976 DOCKET NO.

50

UNIT,
  • 'DATE March 250 3,

1976 COMPLETED BY V. T.

Chilspn TELEPHONE (305) 552 3830 OPERATING STATUS GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400 76 02 29 2 ~

CURRENTLY AUTHOAZZEf) P4WER LEVEL (MWt):

MAX. DEPEND.

CAPACITY (MWe-Net):

3.

POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):.

NONE 4 ~

REASONS FOR RESTRICTION (ZF ANY):

THIS MONTH YEAR TO DATE 5

NUMBER OF HOURS REACTOR WAS CRITICAL.....

566.2 19294.1 CUMULATIVE 22,574.2 6 ~

REACTOR RESERVE SHUTDOWN HOURS....

~ ~.. ~. 7 HOURS GENERATOR ON LINE............

547.2 15.4 1 260.8'8.6 21 630.8 9.

GROSS THERMAL ENERGY GENERATED (K&)..... 1 177,919 2 718 254 40 030 514 12+

-REACTOR SERVICE FACTOR...................

81.4 13 'EACTOR AVAILABILITYFACTOR. ~

~

~

~

81.4 14 UNIT SERVICE FACTOR.

~..

78.6 15+

UNIT AVAILABILITYFACTOR........-

78.6 16.

UNIT CAPACITY FACTOR (Using MDC).........

7 17.

UNIT CAPACITY FACTOR (Using Design MWe)..

74.7 18'NIT FORCED OUTAGE RATE...

~........ ~. ~.

0.0 89.9

90. 9 87.6 87.6 83.7 0.3

'79.5 79,6 76.2 76.5 62.0 3.6 19 ~

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE g DATE g AND DURATION OF EACH)

NONE 20'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST CINITIAL CRITICALITY INITIALELECTRICITY CONfKRCIAL OPERATION ACHIEVED

II I

(1)

BMSON A

EQUIPMENT FAZLURE (EXPLAIN)

B-viAINT OR TEST C:

REFUFLING D:

PNGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION F:

ADMINISTRATIVE G:

OPEFATIONAL ERROR (EXPLAIN)

H:

OTHER (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 250

~ DATE.

March 3 1976 COMPLETED. BY V. T.

Chilson TELEPHONE (305) 552 3830 UNIT NAME Turke Point Unit No.

3 (2)

METHOD

~ EQUAL 2:

MANUAL SCRAM j

3:

AUTOI1ATIC SCRAM 4

OTHER (EXPLAIN)

NO.

DATE 05 76-02-07 06 76-02-21 TYPE F:

FORCED S:

SCHEDULED S

DURATIOiV

. (HOURS) 148.8 REASON (1)

'A METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS COi<M>NTS Load on Unit No.

3 was reduced to approximately 250 MWe (46

% R.P.) to locate and repair condenser tube leak.

Corrective action waa to 'repair tube leak. (Non-Nuclear Nyaya)

Unit No.

3 was removed from service to locate and repair tube leak in steam generator No. 3B.

There were no significant quantities of rddioactive materials released as a result of this small leak.

Corrective action was to plug leaking tube.

(Nuclear System) gnlontRF:

Unit No.

3 operated at approximately 100

% R.p. during month except for load reduction 'on February 7 and outage for steam generator No. 3.B'tube leak repair, February 21 to 28, 1976.-

s

APPENDIX B "AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

251 UNIT Turke Pox.nt Unzt No.

4 DATE March 3, 1976 COMPLETED BY V. T.

Chilson TELEPHQNE 305) 552 - 3830 MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3 5

6 8

9 10 12 13 14 15 16 687 687 687 683 683 683 683 690 691 693 691 687 681 689 685 17 18 19 20 21 22 23 24 25 26 27 28 29 NOTE:

686 683 682 679 681 683 684 689 689 688 685 683 597 Average Daily Power Level greater than 666 MWe due to cooler condenser cooling water.

4 r

APPENDIX C OPERATING DATA REPORT DOCKET NO.

UNIT 50 251 Turke P 'n No.

4 I

REPORT MONTH Februar 1976 DATE March 3

1976 COMPLETED BY V. T.

Chilson TELEPHONE 305 552 3830 OPERATING STATUS 1

REPORTING PERIOD: 0001 76 02 01 GROSS HOURS IN REPORTING PERIOD:

THROUGH 2400, 76 02 29 2

CURRENT LEVEL (MWt):

2 200 MAX. DEPEND.

CAPACITY (MWe-Net):

666 DESIGN ELECTRICAL RATING (MWe-Net):

693 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

NO

'4 ~

REASONS FOR RESTRICTION (ZF ANY):

696. 0 THIS MONTH YEAR TO DATE CUMULATIVE 6 ~

REACTOR RESERVE SHUTDOWN HOURS........... 7 HOURS GENERATOR ON LINE............... 117. 1

.9.

GROSS THERMAL ENERGY GENERATED (KGi).....

1 517 932 2 636 028 33 284 664 llew NET ELECTRZCAL ENERGY GENERATED (M'FJ)

~

12.

REACTOR SERVICE FACTOR......--

100.0 87.

13 'EACTOR AVAILABILITYFACTOR..............

0 14.

UNIT SERVICE FACTOR......

~ ~ ~

~

~..

~ ~ ~ ~. ~ ~

100.0 15'NIT AVAILABILITYFACTOR.......

~...

~.. ~.

16.

UNIT CAPACITY FACTOR (Using MDC).........

17.

UNIT CAPACITY FACTOR (Using Design MWe)..

18'NIT FORCED OUTAGE RATE. ~. ~.......

~ ~.'

I 84.6 85.6 82.2 67.

3.6 19 ~

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~

DATEg AND DURATION OF EACH)

Refueling, Maintenance, and Inspections April 19 through May 30, 1976.

20 ~ 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)!

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

  • NOTE:

UNIT CAPACITY FACTOR (Using MDC) greater than 100

% due to cooler condenser cooling water.

4.4~

~ w J

(1)

EQUIPMENT FAILURE (EXPLAIN),

B:

MAINT. OR TEST C

F ~FUELING D:

RE ULATORY RESTRICTION E:

OPEPATOR TRAINING AND LICENSE EXAMINATION F:

AD.'liNISTRATIVE G:

OPE?ATIONAL ERROR (EXPLAIN)

H:

OTHFR (EXPLAIN)

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~

50 251

~ DATE March 3, 1976 COMPLETED. BY V T.

Chilson TELEPHONE (30~) 552 3830 UNIT NAME Turke Point Unit No.

4 f2)

Y~THOD 1:

."ANNUAL 2:

PANUAL SCRAM 3:

AUTOMATIC SCRAM 4:

OTHFR (FXPLAIN)

NO.

08 DATE 76-02-29 TYPE F:

FORCED S:

SCHEDULED S

DURATION (HOURS) REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING PObER(2)

CORRECTIVE ACTIONS COP~ANTS Load on Unit No.

4 was reduced to approximately 200 MVe to perform periodic test of turbine main steam stop, reheat steam stop, and reheat intercept valves.

(Non-Nuclear System)

RURRRRY Unit No 4 o.perated at approximately 100

% R.p. daring month except for load redaction on pehruary 29, 1976 to perform periodic test of turbine valves.

(