ML18227A399
| ML18227A399 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/03/1976 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227A399 (14) | |
Text
NRC FORM 195 U.S. NUCLEAR REQULATORV COMMISSION g-7G)
NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-250 FILE NUMBER MONTHLY REPORT SUNRC USNRC FRDNI:
Flordia Power 5 Light Co.
t1iami, Fla.
A.D. Schmidt DATE OF DOCUMENT 3-5-76 DATE RECEIVED 3-9-76 OLETTER
@ORIGINAL OCOPV ONOTORI2ED 53 UN C LASS IF I E 0 PROP INPUT FORM NUMBER OF COPIES RECEIVED LETTER TRANS THE FOLL(NING:
MO)THLY REPORT FOR Februar 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY'HISREPORT TO BE USED IN PREPARI',~
"OOK BY PLANS & OPERATICI.S.
~~1>,'T~gt'P PLANT NAME Turkey Point II 3 Im 4 MIPC 01 CYS FOR ACT ON FOR ACTION/INFORMATION S
B 3-10-76 E
L INTERNALD ISTRl BUTION BRANCH CHIEF L
~
Lear EXTERNALDISTRIBUTION CONTROL NUMBER 2394 NRC FORM 195 (2 7G) f ~
'h
C P
~
~<<~
MAR 9 tspg +
g-"s.'oy ~
o~i a,';g r
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT Turke Point Unit. No.
3 DATE 3
1976 COMPLETED BY V. T.'hilson TELEPHONE 1
MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) h
.17 671 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3 678 18 19
..20 671 669
'669 5
'27 6
672 7
428 8
667 9
682 10 684 680 21'2 23 24 25 26
.'7 619'12 13 14 15 668 678 677 675 673
"" 28 29 NOTE:
503 683 Average Daily Power Level greater than 666 Mwe due to cooler condenser. cooling water.
'h ~
E.g I
, ~
I
~
~
APPENDIX C OPERATING DATA REPORT REPORT MONTH Februar 1976 DOCKET NO.
50
- UNIT,
- 'DATE March 250 3,
1976 COMPLETED BY V. T.
Chilspn TELEPHONE (305) 552 3830 OPERATING STATUS GROSS HOURS IN REPORTING PERIOD: 696. 0 THROUGH 2400 76 02 29 2 ~
CURRENTLY AUTHOAZZEf) P4WER LEVEL (MWt):
MAX. DEPEND.
CAPACITY (MWe-Net):
3.
POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net):.
NONE 4 ~
REASONS FOR RESTRICTION (ZF ANY):
THIS MONTH YEAR TO DATE 5
NUMBER OF HOURS REACTOR WAS CRITICAL.....
566.2 19294.1 CUMULATIVE 22,574.2 6 ~
REACTOR RESERVE SHUTDOWN HOURS....
~ ~.. ~. 7 HOURS GENERATOR ON LINE............
547.2 15.4 1 260.8'8.6 21 630.8 9.
GROSS THERMAL ENERGY GENERATED (K&)..... 1 177,919 2 718 254 40 030 514 12+
-REACTOR SERVICE FACTOR...................
81.4 13 'EACTOR AVAILABILITYFACTOR. ~
~
~
~
81.4 14 UNIT SERVICE FACTOR.
~..
78.6 15+
UNIT AVAILABILITYFACTOR........-
78.6 16.
UNIT CAPACITY FACTOR (Using MDC).........
7 17.
UNIT CAPACITY FACTOR (Using Design MWe)..
74.7 18'NIT FORCED OUTAGE RATE...
~........ ~. ~.
0.0 89.9
- 90. 9 87.6 87.6 83.7 0.3
'79.5 79,6 76.2 76.5 62.0 3.6 19 ~
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE g DATE g AND DURATION OF EACH)
NONE 20'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST CINITIAL CRITICALITY INITIALELECTRICITY CONfKRCIAL OPERATION ACHIEVED
II I
(1)
BMSON A
EQUIPMENT FAZLURE (EXPLAIN)
B-viAINT OR TEST C:
REFUFLING D:
PNGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPEFATIONAL ERROR (EXPLAIN)
H:
OTHER (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 250
~ DATE.
March 3 1976 COMPLETED. BY V. T.
Chilson TELEPHONE (305) 552 3830 UNIT NAME Turke Point Unit No.
3 (2)
METHOD
~ EQUAL 2:
3:
AUTOI1ATIC SCRAM 4
OTHER (EXPLAIN)
NO.
DATE 05 76-02-07 06 76-02-21 TYPE F:
FORCED S:
SCHEDULED S
DURATIOiV
. (HOURS) 148.8 REASON (1)
'A METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS COi<M>NTS Load on Unit No.
3 was reduced to approximately 250 MWe (46
% R.P.) to locate and repair condenser tube leak.
Corrective action waa to 'repair tube leak. (Non-Nuclear Nyaya)
Unit No.
3 was removed from service to locate and repair tube leak in steam generator No. 3B.
There were no significant quantities of rddioactive materials released as a result of this small leak.
Corrective action was to plug leaking tube.
(Nuclear System) gnlontRF:
Unit No.
3 operated at approximately 100
% R.p. during month except for load reduction 'on February 7 and outage for steam generator No. 3.B'tube leak repair, February 21 to 28, 1976.-
s
APPENDIX B "AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
251 UNIT Turke Pox.nt Unzt No.
4 DATE March 3, 1976 COMPLETED BY V. T.
Chilson TELEPHQNE 305) 552 - 3830 MONTH February, 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 3 5
6 8
9 10 12 13 14 15 16 687 687 687 683 683 683 683 690 691 693 691 687 681 689 685 17 18 19 20 21 22 23 24 25 26 27 28 29 NOTE:
686 683 682 679 681 683 684 689 689 688 685 683 597 Average Daily Power Level greater than 666 MWe due to cooler condenser cooling water.
4 r
APPENDIX C OPERATING DATA REPORT DOCKET NO.
UNIT 50 251 Turke P 'n No.
4 I
REPORT MONTH Februar 1976 DATE March 3
1976 COMPLETED BY V. T.
Chilson TELEPHONE 305 552 3830 OPERATING STATUS 1
REPORTING PERIOD: 0001 76 02 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 2400, 76 02 29 2
CURRENT LEVEL (MWt):
2 200 MAX. DEPEND.
CAPACITY (MWe-Net):
666 DESIGN ELECTRICAL RATING (MWe-Net):
693 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NO
'4 ~
REASONS FOR RESTRICTION (ZF ANY):
696. 0 THIS MONTH YEAR TO DATE CUMULATIVE 6 ~
REACTOR RESERVE SHUTDOWN HOURS........... 7 HOURS GENERATOR ON LINE............... 117. 1
.9.
GROSS THERMAL ENERGY GENERATED (KGi).....
1 517 932 2 636 028 33 284 664 llew NET ELECTRZCAL ENERGY GENERATED (M'FJ)
~
12.
REACTOR SERVICE FACTOR......--
100.0 87.
13 'EACTOR AVAILABILITYFACTOR..............
0 14.
UNIT SERVICE FACTOR......
~ ~ ~
~
~..
~ ~ ~ ~. ~ ~
100.0 15'NIT AVAILABILITYFACTOR.......
~...
~.. ~.
16.
UNIT CAPACITY FACTOR (Using MDC).........
17.
UNIT CAPACITY FACTOR (Using Design MWe)..
18'NIT FORCED OUTAGE RATE. ~. ~.......
~ ~.'
I 84.6 85.6 82.2 67.
3.6 19 ~
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE ~
DATEg AND DURATION OF EACH)
Refueling, Maintenance, and Inspections April 19 through May 30, 1976.
20 ~ 'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)!
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
- NOTE:
UNIT CAPACITY FACTOR (Using MDC) greater than 100
% due to cooler condenser cooling water.
4.4~
~ w J
(1)
EQUIPMENT FAILURE (EXPLAIN),
B:
MAINT. OR TEST C
F ~FUELING D:
RE ULATORY RESTRICTION E:
OPEPATOR TRAINING AND LICENSE EXAMINATION F:
AD.'liNISTRATIVE G:
OPE?ATIONAL ERROR (EXPLAIN)
H:
OTHFR (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO ~
50 251
~ DATE March 3, 1976 COMPLETED. BY V T.
Chilson TELEPHONE (30~) 552 3830 UNIT NAME Turke Point Unit No.
4 f2)
Y~THOD 1:
."ANNUAL 2:
PANUAL SCRAM 3:
OTHFR (FXPLAIN)
NO.
08 DATE 76-02-29 TYPE F:
FORCED S:
SCHEDULED S
DURATION (HOURS) REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING PObER(2)
CORRECTIVE ACTIONS COP~ANTS Load on Unit No.
4 was reduced to approximately 200 MVe to perform periodic test of turbine main steam stop, reheat steam stop, and reheat intercept valves.
(Non-Nuclear System)
RURRRRY Unit No 4 o.perated at approximately 100