ML19208A756: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 22: | Line 22: | ||
MANAGE 3 9 09 iMf/9 | MANAGE 3 9 09 iMf/9 | ||
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes | OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes | ||
: 1. Unit Name: | : 1. Unit Name: | ||
Line 39: | Line 38: | ||
N/A | N/A | ||
: 9. Power Level To Which Restricted,if Any (Net MWe): N/A | : 9. Power Level To Which Restricted,if Any (Net MWe): N/A | ||
: 10. Reasons For Restrictions.If Any: N/A | : 10. Reasons For Restrictions.If Any: N/A This Month Yr.-to-Date Cumulative 744 5,832 10,849 | ||
This Month Yr.-to-Date Cumulative 744 5,832 10,849 | |||
: 11. Hours in Reporting Period 744 4,896.2 9,943 | : 11. Hours in Reporting Period 744 4,896.2 9,943 | ||
: 12. Number Of Hours Reactor Was Critica] | : 12. Number Of Hours Reactor Was Critica] | ||
Line 57: | Line 54: | ||
: 21. Unit Capacity Factor (Using MDC Net)- 89.5 71_9 77_1 | : 21. Unit Capacity Factor (Using MDC Net)- 89.5 71_9 77_1 | ||
: 22. Unit Capacity Factor (Using DER Net) 84 6 71 1 76 6 | : 22. Unit Capacity Factor (Using DER Net) 84 6 71 1 76 6 | ||
: 23. Unit Forced Outage Rate 0 16.4 | : 23. Unit Forced Outage Rate 0 16.4 M | ||
M | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.): | : 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.): | ||
Refueling; September, October, November and December: 12' weeks A | Refueling; September, October, November and December: 12' weeks A | ||
Line 65: | Line 60: | ||
: 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y g*/'} P'/77 ) | : 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y g*/'} P'/77 ) | ||
AVERAGE DAILY UNIT POWER LEVEL | AVERAGE DAILY UNIT POWER LEVEL | ||
~ | ~ | ||
DOCKET NO. | DOCKET NO. | ||
Line 74: | Line 66: | ||
, ,7 2 806 gg 793 3 | , ,7 2 806 gg 793 3 | ||
807 39 793 4 808 20 807 5 | 807 39 793 4 808 20 807 5 | ||
805 21 80 f' 6 805 22 Al l | 805 21 80 f' 6 805 22 Al l 04 815 7 23 8 803 24 815 9 803 25 816 10 801 010 26 gy 802 812 7 | ||
04 815 7 23 8 803 24 815 9 803 25 816 10 801 010 26 gy 802 812 7 | |||
803 12 12 28 13 804 785 29 34 806 774 30 15 805 33 757 16 808 4 | 803 12 12 28 13 804 785 29 34 806 774 30 15 805 33 757 16 808 4 | ||
INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
Line 82: | Line 72: | ||
OIfti280 | OIfti280 | ||
I CKET NO. 0- 8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl- 39/9 REPORT A10 Nill August 1979 DATE _ b C0hlPEE IED I8Y - 1*_4' 0CRf#I EUTIIONE 703-894-5151 x-304 | I CKET NO. 0- 8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl- 39/9 REPORT A10 Nill August 1979 DATE _ b C0hlPEE IED I8Y - 1*_4' 0CRf#I EUTIIONE 703-894-5151 x-304 | ||
, .$ E 3 E I.icensee [ t, ,, Cause & Corrective No. D.ite Q 3g i ms& Event g7 gU 3 Action so b y6 5 ey@g lleport # 01 O O | , .$ E 3 E I.icensee [ t, ,, Cause & Corrective No. D.ite Q 3g i ms& Event g7 gU 3 Action so b y6 5 ey@g lleport # 01 O O | ||
o Prevent itecurrence 3 | o Prevent itecurrence 3 | ||
O | O l | ||
FOR THE PE RIOD ALGUST 1 THI OUGH AUGUST 31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS. THE UNIT IS PRES ENTLY SCI EDULED TO BE SHUTDOWN ON SEPl EMBER 15, 1979 FOR A 12 WEEK MAINT ENANCE AND REFUELING OUTAGE. d | |||
~ | ~ | ||
th | th |
Latest revision as of 07:06, 2 February 2020
ML19208A756 | |
Person / Time | |
---|---|
Site: | North Anna ![]() |
Issue date: | 09/04/1979 |
From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML19208A752 | List: |
References | |
NUDOCS 7909170419 | |
Download: ML19208A756 (3) | |
Text
.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA PO',.'ER STATION MONTHLY OPERATING REPORT MONTH AUGUST YEAR 1979 SUBMITTED:
h9 SUPERIfff010.BNT - OPERATIONS APPROVED: ')btj;37[3 l
MANAGE 3 9 09 iMf/9
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period: ._.
August 1979
- 3. Licensed Thermal Power (MWt):
2775 *
- 4. Nameplate Rating (Gross MWe):
947 -
907
- 5. Design Dectrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 928
- 7. Maximum Dependable Capacity (Net MWe):
898
- s. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe): N/A
- 10. Reasons For Restrictions.If Any: N/A This Month Yr.-to-Date Cumulative 744 5,832 10,849
- 11. Hours in Reporting Period 744 4,896.2 9,943
- 12. Number Of Hours Reactor Was Critica]
0 11.8 11.8
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
/44 4,819.2 9,470.9
- 15. Unit Reserve Shutdowr. I:e::,, 0 0 0
- 16. Gross Thermal Energy Generated gMWH) 2,044,516 19,948,750 25.145.545
- 17. Gross Electrical Energy Generated (MWH) 633,364 _,
4,099,983 8,000,556
- 18. Net Electrical Energy Generated (MWH) 597,935 3,868,122 7,532,702 _
- 19. Unit Service Factor 100 82.6 87.3 100 82.6 37.3
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net)- 89.5 71_9 77_1
- 22. Unit Capacity Factor (Using DER Net) 84 6 71 1 76 6
- 23. Unit Forced Outage Rate 0 16.4 M
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):
Refueling; September, October, November and December: 12' weeks A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y g*/'} P'/77 )
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
UNIT NA 1 DATE 09-04-79 COMPLETED BY 'I P 'f, h n TELEPHONE 703-894-5151 MONTH AUGUST 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 810 811
, ,7 2 806 gg 793 3
807 39 793 4 808 20 807 5
805 21 80 f' 6 805 22 Al l 04 815 7 23 8 803 24 815 9 803 25 816 10 801 010 26 gy 802 812 7
803 12 12 28 13 804 785 29 34 806 774 30 15 805 33 757 16 808 4
INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
OIfti280
I CKET NO. 0- 8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl- 39/9 REPORT A10 Nill August 1979 DATE _ b C0hlPEE IED I8Y - 1*_4' 0CRf#I EUTIIONE 703-894-5151 x-304
, .$ E 3 E I.icensee [ t, ,, Cause & Corrective No. D.ite Q 3g i ms& Event g7 gU 3 Action so b y6 5 ey@g lleport # 01 O O
o Prevent itecurrence 3
O l
FOR THE PE RIOD ALGUST 1 THI OUGH AUGUST 31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS. THE UNIT IS PRES ENTLY SCI EDULED TO BE SHUTDOWN ON SEPl EMBER 15, 1979 FOR A 12 WEEK MAINT ENANCE AND REFUELING OUTAGE. d
~
th
- f. *'
0' N
2 -
.p i 2 3 4 F: Forted Reason: hlethod: Exhibit C -Instructions S Scheduled A Equipment Failure (Explain), 1 -hf anual for Preparation of Data II.htaintenance of Test 2-klan ual Scra m. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Twent Report (LEl.) File (NURI:G-D Regulatory Restriction 4-Other (Explain) 0161) ,,
E Operator Training & l.icense Examination F Administrative 5 G-Operational I iror (Explain) Eshibit 1 - Same Source to/77) 1 Other (Explain) i