OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1                              Notes
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1                              Notes
: 1. Unit Name:
: 1. Unit Name:
Line 39: Line 38:
N/A
N/A
: 9. Power Level To Which Restricted,if Any (Net MWe):            N/A
: 9. Power Level To Which Restricted,if Any (Net MWe):            N/A
: 10. Reasons For Restrictions.If Any:                  N/A
: 10. Reasons For Restrictions.If Any:                  N/A This Month            Yr.-to-Date          Cumulative 744                    5,832              10,849
                                                                                                                    .
This Month            Yr.-to-Date          Cumulative 744                    5,832              10,849
: 11. Hours in Reporting Period 744                    4,896.2              9,943
: 11. Hours in Reporting Period 744                    4,896.2              9,943
: 12. Number Of Hours Reactor Was Critica]
: 12. Number Of Hours Reactor Was Critica]
Line 57: Line 54:
: 21. Unit Capacity Factor (Using MDC Net)-                      89.5                      71_9                77_1
: 21. Unit Capacity Factor (Using MDC Net)-                      89.5                      71_9                77_1
: 22. Unit Capacity Factor (Using DER Net)                      84 6                      71 1                76 6
: 22. Unit Capacity Factor (Using DER Net)                      84 6                      71 1                76 6
: 23. Unit Forced Outage Rate                                0                            16.4
: 23. Unit Forced Outage Rate                                0                            16.4 M
                                                                                                      '
M
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):
Refueling;        September, October, November and December:                      12' weeks A
Refueling;        September, October, November and December:                      12' weeks A
Line 65: Line 60:
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y  g*/'}              P'/77 )
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y  g*/'}              P'/77 )


                                  , _ _ _ . . _
_
AVERAGE DAILY UNIT POWER LEVEL
AVERAGE DAILY UNIT POWER LEVEL
                                                .
                                                                                                           ~
                                                                                                           ~
DOCKET NO.
DOCKET NO.
Line 74: Line 66:
   ,                                                            ,7 2                        806                                  gg                  793 3
   ,                                                            ,7 2                        806                                  gg                  793 3
807                                  39                  793 4                        808                                  20                  807 5
807                                  39                  793 4                        808                                  20                  807 5
805                                  21                  80 f' 6                        805                                  22                  Al l
805                                  21                  80 f' 6                        805                                  22                  Al l 04                                                      815 7                                                              23 8                        803                                  24                  815 9                        803 25 816 10 801                                                        010 26 gy                        802                                                        812 7
                                                  '
04                                                      815 7                                                              23 8                        803                                  24                  815 9                        803 25 816 10 801                                                        010 26 gy                        802                                                        812 7
803                                                          12 12                                                              28 13 804                                                        785 29 34 806                                                        774 30 15                        805                                  33                  757 16 808 4
803                                                          12 12                                                              28 13 804                                                        785 29 34 806                                                        774 30 15                        805                                  33                  757 16 808 4
INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Line 82: Line 72:
OIfti280
OIfti280


                                                                                        -
                                                                                                                                                      .
                                                                            .                                                                              .
                                                                                                                                                        ..
I CKET NO.            0-  8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl-      39/9 REPORT A10 Nill      August 1979                          DATE _ b C0hlPEE IED I8Y    -        1*_4' 0CRf#I EUTIIONE          703-894-5151 x-304
I CKET NO.            0-  8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl-      39/9 REPORT A10 Nill      August 1979                          DATE _ b C0hlPEE IED I8Y    -        1*_4' 0CRf#I EUTIIONE          703-894-5151 x-304
                                                      .
                         ,        .$ E      3        E        I.icensee        [ t,          ,,            Cause & Corrective No.        D.ite    Q        3g        i    ms&            Event        g7          gU 3                  Action so b        y6        5    ey@g          lleport #      01 O O
                         ,        .$ E      3        E        I.icensee        [ t,          ,,            Cause & Corrective No.        D.ite    Q        3g        i    ms&            Event        g7          gU 3                  Action so b        y6        5    ey@g          lleport #      01 O O
o                Prevent itecurrence 3
o                Prevent itecurrence 3
O
O l
                                                                                                                                                  -
FOR THE    PE  RIOD ALGUST          1  THI OUGH AUGUST        31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS.              THE UNIT IS        PRES  ENTLY SCI EDULED TO    BE SHUTDOWN ON SEPl EMBER 15,          1979    FOR    A 12 WEEK          MAINT ENANCE AND REFUELING OUTAGE. d
l FOR THE    PE  RIOD ALGUST          1  THI OUGH AUGUST        31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS.              THE UNIT IS        PRES  ENTLY SCI EDULED TO    BE SHUTDOWN ON SEPl EMBER 15,          1979    FOR    A 12 WEEK          MAINT ENANCE AND REFUELING OUTAGE. d
                                                                                                   ~
                                                                                                   ~
th
th

Latest revision as of 07:06, 2 February 2020

Monthly Operating Rept for Aug 1979
ML19208A756
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/04/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19208A752 List:
References
NUDOCS 7909170419
Download: ML19208A756 (3)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA PO',.'ER STATION MONTHLY OPERATING REPORT MONTH AUGUST YEAR 1979 SUBMITTED:

h9 SUPERIfff010.BNT - OPERATIONS APPROVED: ')btj;37[3 l

MANAGE 3 9 09 iMf/9

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes

1. Unit Name:
2. Reporting Period: ._.

August 1979

3. Licensed Thermal Power (MWt):

2775 *

4. Nameplate Rating (Gross MWe):

947 -

907

5. Design Dectrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 928
7. Maximum Dependable Capacity (Net MWe):

898

s. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A This Month Yr.-to-Date Cumulative 744 5,832 10,849
11. Hours in Reporting Period 744 4,896.2 9,943
12. Number Of Hours Reactor Was Critica]

0 11.8 11.8

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line

/44 4,819.2 9,470.9

15. Unit Reserve Shutdowr. I:e::,, 0 0 0
16. Gross Thermal Energy Generated gMWH) 2,044,516 19,948,750 25.145.545
17. Gross Electrical Energy Generated (MWH) 633,364 _,

4,099,983 8,000,556

18. Net Electrical Energy Generated (MWH) 597,935 3,868,122 7,532,702 _
19. Unit Service Factor 100 82.6 87.3 100 82.6 37.3
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)- 89.5 71_9 77_1
22. Unit Capacity Factor (Using DER Net) 84 6 71 1 76 6
23. Unit Forced Outage Rate 0 16.4 M
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):

Refueling; September, October, November and December: 12' weeks A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y g*/'} P'/77 )

AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

UNIT NA 1 DATE 09-04-79 COMPLETED BY 'I P 'f, h n TELEPHONE 703-894-5151 MONTH AUGUST 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 810 811

, ,7 2 806 gg 793 3

807 39 793 4 808 20 807 5

805 21 80 f' 6 805 22 Al l 04 815 7 23 8 803 24 815 9 803 25 816 10 801 010 26 gy 802 812 7

803 12 12 28 13 804 785 29 34 806 774 30 15 805 33 757 16 808 4

INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

OIfti280

I CKET NO. 0- 8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl- 39/9 REPORT A10 Nill August 1979 DATE _ b C0hlPEE IED I8Y - 1*_4' 0CRf#I EUTIIONE 703-894-5151 x-304

, .$ E 3 E I.icensee [ t, ,, Cause & Corrective No. D.ite Q 3g i ms& Event g7 gU 3 Action so b y6 5 ey@g lleport # 01 O O

o Prevent itecurrence 3

O l

FOR THE PE RIOD ALGUST 1 THI OUGH AUGUST 31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS. THE UNIT IS PRES ENTLY SCI EDULED TO BE SHUTDOWN ON SEPl EMBER 15, 1979 FOR A 12 WEEK MAINT ENANCE AND REFUELING OUTAGE. d

~

th

f. *'

0' N

2 -

.p i 2 3 4 F: Forted Reason: hlethod: Exhibit C -Instructions S Scheduled A Equipment Failure (Explain), 1 -hf anual for Preparation of Data II.htaintenance of Test 2-klan ual Scra m. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Twent Report (LEl.) File (NURI:G-D Regulatory Restriction 4-Other (Explain) 0161) ,,

E Operator Training & l.icense Examination F Administrative 5 G-Operational I iror (Explain) Eshibit 1 - Same Source to/77) 1 Other (Explain) i