{{#Wiki_filter:.VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA PO',.'ER STATION MONTHLY OPERATING REPORT MONTH AUGUST YEAR 1979 SUBMITTED:
{{#Wiki_filter:.
h9 SUPERIfff010.BNT - OPERATIONS APPROVED: ')btj;37[3 lMANAGE 3 9 09 iMf/9
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA PO',.'ER STATION MONTHLY OPERATING REPORT MONTH AUGUST YEAR       1979 SUBMITTED:
_ _ _ _OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes 1. Unit Name:
h9 SUPERIfff010.BNT - OPERATIONS APPROVED:                     ')btj;37[3 l
August 1979
MANAGE 3 9 09 iMf/9
: 2. Reporting Period:
 
._.2775 3. Licensed Thermal Power (MWt):
OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1                               Notes
*947-4. Nameplate Rating (Gross MWe):
: 1. Unit Name:
907 5. Design Dectrical Rating (Net MWe):
: 2. Reporting Period: ._.
928 6. Maximum Dependable Capacity (Gross MWe):
August    1979
898 7. Maximum Dependable Capacity (Net MWe):
: 3. Licensed Thermal Power (MWt):
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
2775                                                *
s.N/A 9. Power Level To Which Restricted,if Any (Net MWe):
: 4. Nameplate Rating (Gross MWe):
N/A 10. Reasons For Restrictions.If Any:
947                                                  -
N/A.This Month Yr.-to-Date Cumulative 744 5,832 10,849 11. Hours in Reporting Period 744 4,896.2 9,943 12. Number Of Hours Reactor Was Critica]
907
0 11.8 11.8 13. Reactor Reserve Shutdown Hours
: 5. Design Dectrical Rating (Net MWe):
/44 4,819.2 9,470.9 14. Hours Generator On-Line 0 0 0 15. Unit Reserve Shutdowr. I:e::,, 16. Gross Thermal Energy Generated gMWH) 2,044,516 19,948,750 25.145.545
: 6. Maximum Dependable Capacity (Gross MWe):           928
: 17. Gross Electrical Energy Generated (MWH) 633,364 4,099,983 8,000,556_, 597,935 3,868,122 7,532,702 _
: 7. Maximum Dependable Capacity (Net MWe):
: 18. Net Electrical Energy Generated (MWH) 100 82.6 87.3 19. Unit Service Factor 100 82.6 37.3 20. Unit Availability Factor
898
: 21. Unit Capacity Factor (Using MDC Net)-
: s. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
89.5 71_9 77_1 84 6 71 1 76 6 22. Unit Capacity Factor (Using DER Net) 0 16.4 M 23. Unit Forced Outage Rate
N/A
'24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):
: 9. Power Level To Which Restricted,if Any (Net MWe):           N/A
Refueling; September, October, November and December:
: 10. Reasons For Restrictions.If Any:                 N/A This Month           Yr.-to-Date         Cumulative 744                   5,832             10,849
12' weeks A 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 11. Hours in Reporting Period 744                   4,896.2             9,943
: 26. Units in Test Status (Prior to Commercial Operation):
: 12. Number Of Hours Reactor Was Critica]
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (P'/77 )y g*/'}  
0                           11.8               11.8
, _ _ _ . . _
: 13. Reactor Reserve Shutdown Hours
_AVERAGE DAILY UNIT POWER LEVEL
: 14. Hours Generator On-Line
.~DOCKET NO.
                                                            /44                   4,819.2             9,470.9
UNIT NA 1 09-04-79 DATE COMPLETED BY
: 15. Unit Reserve Shutdowr. I:e::,,                         0                          0                  0
'I P'f, h n TELEPHONE 703-894-5151 AUGUST 1979 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)(MWe-Net)810 811 , ,7 793 2 806 gg 807 3 39 793 808 20 807 4 805 5 21 80 f'6 805 22 Al l'04 815 7 23 803 815 8 24 803 816 9 25 801 010 10 26 802 812 gy 7 803 12 12 28 804 785 13 29 806 774 34 30 15 805 757 33 808 16 4 INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
: 16. Gross Thermal Energy Generated gMWH)             2,044,516             19,948,750           25.145.545
(9/77)OIfti280  
: 17. Gross Electrical Energy Generated (MWH) 633,364       _,
-.....0-8 I CKET NO.
4,099,983             8,000,556
UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl-39/9 DATE _ b 1*_4'
: 18. Net Electrical Energy Generated (MWH) 597,935             3,868,122             7,532,702 _
-0CRf#I REPORT A10 Nill August 1979 C0hlPEE IED I8Y EUTIIONE 703-894-5151 x-304
: 19. Unit Service Factor 100                         82.6               87.3 100                         82.6               37.3
.,.$ E 3 E I.icensee[ t, Cause & Corrective
: 20. Unit Availability Factor
,, No.D.ite Q 3g i ms&Event g7 gU 3 Action so b y6 5 y@g lleport #01 O Prevent itecurrence o e O 3 Ol-FOR THE PE RIOD ALGUST 1 THI OUGH AUGUST 31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS.THE UNIT IS PRES ENTLY SCI EDULED TO BE SHUTDOWN ON SEPl EMBER 15, 1979 FOR A 12 WEEK MAINT ENANCE AND REFUELING OUTAGE. d th~f. *'0'N 2-.p i 2 3 4 F: Forted Reason: hlethod: Exhibit C -Instructions S Scheduled A Equipment Failure (Explain), 1 -hf anual for Preparation of Data II.htaintenance of Test 2-klan ual Scra m.
: 21. Unit Capacity Factor (Using MDC Net)-                     89.5                     71_9               77_1
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
: 22. Unit Capacity Factor (Using DER Net)                     84 6                      71 1                76 6
Twent Report (LEl.) File (NURI:G-D Regulatory Restriction 4-Other (Explain) 0161),, E Operator Training & l.icense Examination F Administrative 5 G-Operational I iror (Explain)
: 23. Unit Forced Outage Rate                                 0                            16.4 M
Eshibit 1 - Same Source to/77)1 Other (Explain) i}}
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):
Refueling;       September, October, November and December:                     12' weeks A
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                     Forecast             Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y   g*/'}               P'/77 )
 
AVERAGE DAILY UNIT POWER LEVEL
                                                                                                          ~
DOCKET NO.
UNIT     NA 1 DATE      09-04-79 COMPLETED BY           'I P   'f, h n TELEPHONE         703-894-5151 MONTH        AUGUST 1979 DAY       AVERAGE DAILY POWER LEVEL                             DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 810                                                       811
  ,                                                             ,7 2                       806                                   gg                   793 3
807                                   39                   793 4                        808                                   20                   807 5
805                                   21                   80 f' 6                       805                                   22                   Al l 04                                                       815 7                                                             23 8                        803                                   24                  815 9                        803 25 816 10 801                                                       010 26 gy                        802                                                       812 7
803                                                         12 12                                                             28 13 804                                                       785 29 34 806                                                       774 30 15                       805                                   33                  757 16 808 4
INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
OIfti280
 
I CKET NO.           0-   8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl-       39/9 REPORT A10 Nill      August 1979                          DATE _ b C0hlPEE IED I8Y    -        1*_4' 0CRf#I EUTIIONE           703-894-5151 x-304
                        ,       .$ E     3         E         I.icensee       [ t,           ,,            Cause & Corrective No.         D.ite     Q       3g         i   ms&             Event         g7           gU 3                 Action so b         y6       5     ey@g         lleport #       01 O O
o                Prevent itecurrence 3
O l
FOR THE     PE RIOD ALGUST         1   THI OUGH AUGUST         31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS.               THE UNIT IS         PRES   ENTLY SCI EDULED TO   BE SHUTDOWN ON SEPl EMBER 15,           1979     FOR     A 12 WEEK           MAINT ENANCE AND REFUELING OUTAGE. d
                                                                                                  ~
th
: f. *'
0' N
2                                                                                                       -
  .p i                   2                                                   3                                 4 F: Forted           Reason:                                                 hlethod:                       Exhibit C -Instructions S Scheduled         A Equipment Failure (Explain),                         1 -hf anual                     for Preparation of Data II.htaintenance of Test                                 2-klan ual Scra m.             Entry Sheets for Licensee C-Refueling                                             3 Automatic Scram.             Twent Report (LEl.) File (NURI:G-D Regulatory Restriction                               4-Other (Explain)               0161)       ,,
E Operator Training & l.icense Examination F Administrative                                                                   5 G-Operational I iror (Explain)                                                         Eshibit 1 - Same Source to/77)                 1 Other (Explain) i}}

Latest revision as of 07:06, 2 February 2020

Monthly Operating Rept for Aug 1979
ML19208A756
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/04/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19208A752 List:
References
NUDOCS 7909170419
Download: ML19208A756 (3)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA PO',.'ER STATION MONTHLY OPERATING REPORT MONTH AUGUST YEAR 1979 SUBMITTED:

h9 SUPERIfff010.BNT - OPERATIONS APPROVED: ')btj;37[3 l

MANAGE 3 9 09 iMf/9

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 09-04-79 COMPLETED BY W R N dison TELEPHONE 703-894-5151 OPERATING STATUS North Anna, Unit 1 Notes

1. Unit Name:
2. Reporting Period: ._.

August 1979

3. Licensed Thermal Power (MWt):

2775 *

4. Nameplate Rating (Gross MWe):

947 -

907

5. Design Dectrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 928
7. Maximum Dependable Capacity (Net MWe):

898

s. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A This Month Yr.-to-Date Cumulative 744 5,832 10,849
11. Hours in Reporting Period 744 4,896.2 9,943
12. Number Of Hours Reactor Was Critica]

0 11.8 11.8

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line

/44 4,819.2 9,470.9

15. Unit Reserve Shutdowr. I:e::,, 0 0 0
16. Gross Thermal Energy Generated gMWH) 2,044,516 19,948,750 25.145.545
17. Gross Electrical Energy Generated (MWH) 633,364 _,

4,099,983 8,000,556

18. Net Electrical Energy Generated (MWH) 597,935 3,868,122 7,532,702 _
19. Unit Service Factor 100 82.6 87.3 100 82.6 37.3
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)- 89.5 71_9 77_1
22. Unit Capacity Factor (Using DER Net) 84 6 71 1 76 6
23. Unit Forced Outage Rate 0 16.4 M
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Dur, tion of Esel.):

Refueling; September, October, November and December: 12' weeks A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COstM ERCIAL OPER ATION (y g*/'} P'/77 )

AVERAGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

UNIT NA 1 DATE 09-04-79 COMPLETED BY 'I P 'f, h n TELEPHONE 703-894-5151 MONTH AUGUST 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 810 811

, ,7 2 806 gg 793 3

807 39 793 4 808 20 807 5

805 21 80 f' 6 805 22 Al l 04 815 7 23 8 803 24 815 9 803 25 816 10 801 010 26 gy 802 812 7

803 12 12 28 13 804 785 29 34 806 774 30 15 805 33 757 16 808 4

INSTRUCTIONS On tius format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

OIfti280

I CKET NO. 0- 8 UNIT SilUIDOWNS ANI) POWER REDUCTIONS MPl- 39/9 REPORT A10 Nill August 1979 DATE _ b C0hlPEE IED I8Y - 1*_4' 0CRf#I EUTIIONE 703-894-5151 x-304

, .$ E 3 E I.icensee [ t, ,, Cause & Corrective No. D.ite Q 3g i ms& Event g7 gU 3 Action so b y6 5 ey@g lleport # 01 O O

o Prevent itecurrence 3

O l

FOR THE PE RIOD ALGUST 1 THI OUGH AUGUST 31, 1 979, THEf'E WERE NO UNIT SHUTDOWNS OR SIGNIFIC ANT 10WER F EDUCT IONS. THE UNIT IS PRES ENTLY SCI EDULED TO BE SHUTDOWN ON SEPl EMBER 15, 1979 FOR A 12 WEEK MAINT ENANCE AND REFUELING OUTAGE. d

~

th

f. *'

0' N

2 -

.p i 2 3 4 F: Forted Reason: hlethod: Exhibit C -Instructions S Scheduled A Equipment Failure (Explain), 1 -hf anual for Preparation of Data II.htaintenance of Test 2-klan ual Scra m. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Twent Report (LEl.) File (NURI:G-D Regulatory Restriction 4-Other (Explain) 0161) ,,

E Operator Training & l.icense Examination F Administrative 5 G-Operational I iror (Explain) Eshibit 1 - Same Source to/77) 1 Other (Explain) i