Line 30: Line 30:
Very truly 'Jours, TENNESSEE VALLET AUTHORITY
Very truly 'Jours, TENNESSEE VALLET AUTHORITY
                                                               /
                                                               /
                                                            ,
                                                           .      . Mills, Managar Nuclear Regulation and Safety Subscribed and sworn to before me this . 7/ day of Decemberj 1979.                                            ]ffj }4)
                                                           .      . Mills, Managar Nuclear Regulation and Safety Subscribed and sworn to before me this . 7/ day of Decemberj 1979.                                            ]ffj }4)
Notary PublicN / / L O Ui[hX/ )
Notary PublicN / / L O Ui[hX/ )
My Commi ia        pires //'/    b                                                g
My Commi ia        pires //'/    b                                                g 8001020      t Enclosur as (41)
        '
8001020      t Enclosur as (41)
An Equal Opportunity Employer        h}}
An Equal Opportunity Employer        h}}

Latest revision as of 23:58, 1 February 2020

Forwards Status of Transmission Line Rights-of-Way Reclamation & Revegetation Since Completion of Transmission Line Const & Preoperational Sound Levels.
ML19257A204
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/27/1979
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Sells D
Office of Nuclear Reactor Regulation
Shared Package
ML19257A205 List:
References
NUDOCS 8001020465
Download: ML19257A204 (1)


Text

i, g'.

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 DEC 2 71979 Director of Nuclear Reactor Regulation Attention: Mr. Donald E. Sells, Chief Environmental Projects Branch No. 2 Division of Site, Safety, and Environmental Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Sells:

In the Matter of the Application of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 As a result of discussions between TVA and the NRC staff, we have prepared the following reports which are enclosed.

1. A report on the status of the Sequoyah transmission line rights of way reclamation and revegetation since the completion of transmission line construction.
2. A sound survey that represents preoperational sound levels, as well as predictive sound levels fer operation.

Although baseline sound levels are relatively high, sound from the transformers and cooling towers will sometimes be audible offsite. We do not believe the inclusion of a study and operational sound levels in the environmental technical specifications will provide any benefit.

In addition, there have been no formal noise complaints during the construction phase of the Sequoyah Nuclear Plant.

We will be glad to discuss the status of these reports further if necessary.

Very truly 'Jours, TENNESSEE VALLET AUTHORITY

/

. . Mills, Managar Nuclear Regulation and Safety Subscribed and sworn to before me this . 7/ day of Decemberj 1979. ]ffj }4)

Notary PublicN / / L O Ui[hX/ )

My Commi ia pires //'/ b g 8001020 t Enclosur as (41)

An Equal Opportunity Employer h