{{#Wiki_filter:..                                                                3-
{{#Wiki_filter:..                                                                3-SOUTH CAROLINA ELECTRIC & gas COMPANY post orrics som re.
        '
  .' '
      .
SOUTH CAROLINA ELECTRIC & gas COMPANY post orrics som re.
COLUMBIA,$OUTH CAROLINA 29218 E. H. Ca rw s, J a.
COLUMBIA,$OUTH CAROLINA 29218 E. H. Ca rw s, J a.
v.c . eu ..                                  July 3, 1980
v.c . eu ..                                  July 3, 1980
Line 35: Line 31:
South Carolina Electric & Gas Company, acting for itself and as agent for South Carolina Public Service Authority, hereby submits five (5) copies of
South Carolina Electric & Gas Company, acting for itself and as agent for South Carolina Public Service Authority, hereby submits five (5) copies of
                 " Responses to Requests for Additional Information - Settlement of Service Water Intake Structure." This information is being submitted in response to additional NRC questions on the service water intake structure as enclosed with NRC letter dated June 23 980, concerning " Summary of Meeting Held on June 13, 1980 with South Car ina                  lectric & Gas Company."
                 " Responses to Requests for Additional Information - Settlement of Service Water Intake Structure." This information is being submitted in response to additional NRC questions on the service water intake structure as enclosed with NRC letter dated June 23 980, concerning " Summary of Meeting Held on June 13, 1980 with South Car ina                  lectric & Gas Company."
e        ruly yours,
e        ruly yours, E. H. Crews, Jr.
                                                                                -
RBW:EHC:jw cc:      H. T. Babb G. H. Fischer W. C. Mescher W. S. Murphy W. A. Williams, Jr.
                                                                            -
E. H. Crews, Jr.
RBW:EHC:jw cc:      H. T. Babb G. H. Fischer W. C. Mescher
'
W. S. Murphy W. A. Williams, Jr.
T. B. Conner, Jr.
T. B. Conner, Jr.
B. A. Bursey NPCF/Dixon l                        File                                                              00}
B. A. Bursey NPCF/Dixon l                        File                                                              00}
                                                                                           . S l                                                                                          ll1
                                                                                           . S l                                                                                          ll1 l
!
v-.. ~ e s2                                    R
l v-.. ~ e s2                                    R


4
4 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SETTLEMENT OF SERVICE WATER INTAKE STRUCTURE V. C. SUMMER UNIT 1                                i SOUTH CAROLINA ELECTRIC & GAS CO.
                              ,. . _ -
                                                                              .
          . .. ,
      .
        '.      .
  '
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SETTLEMENT OF SERVICE WATER INTAKE STRUCTURE V. C. SUMMER UNIT 1                                i SOUTH CAROLINA ELECTRIC & GAS CO.
Question 1:
Question 1:
Evaluate the existing structure to determine safety margin against NRC SRP 3.8.4.
Evaluate the existing structure to determine safety margin against NRC SRP 3.8.4.
Line 65: Line 48:
                   ' tie aad SSE result in the most critical section having a strength of 150%
                   ' tie aad SSE result in the most critical section having a strength of 150%
l l                and 230% respectively in excess of those required.
l l                and 230% respectively in excess of those required.
I
I As.far as the longitudinal direction of the SWIS is concerned, the original design of the SWIS included longitudinal reinforcing steel for 6.stribution of cracks. associated with thermal and shrinkage effects. The original design did not include consideration of the magnitude of differential settlement that
,
As.far as the longitudinal direction of the SWIS is concerned, the original design of the SWIS included longitudinal reinforcing steel for 6.stribution of cracks. associated with thermal and shrinkage effects. The original design did not include consideration of the magnitude of differential settlement that


_
      .
        * *
   ~ '
   ~ '
* Response to Question 1 (Continued):
* Response to Question 1 (Continued):
Line 82: Line 60:
===Response===
===Response===
Transverse relative displacements of at least 2    ft. (wall thickness) would be needed to cause a net opening which might impair functionability of the SWIS. This event would require a shear mechanism capable of transverse rupture of the SWIS and the West Embankment.      Such extensive movement would
Transverse relative displacements of at least 2    ft. (wall thickness) would be needed to cause a net opening which might impair functionability of the SWIS. This event would require a shear mechanism capable of transverse rupture of the SWIS and the West Embankment.      Such extensive movement would
,
           -require a seismic event far in excess of the magnitude postulated for the l
           -require a seismic event far in excess of the magnitude postulated for the l
site.
site.
                            ,


    .
_c;c        ..      _.c 2. .: - -
_c;c        ..      _.c 2. .: - -
                                                        -
                                                            -        -                -
                                                                                                   +
                                                                                                   +
                                                                                                                      -                      -
   .  , ..;-
   .  , ..;-
,'' '      '
_3 Response to Question 2 (Continued):
_3 Response to Question 2 (Continued):
In the longLtudinal direction, the calculated maximum crack width using the Newmark method during an SSE event is 0.16 inches.                                Based on an average effective cohesion of 875 psf for the West Babankment fill, it is concluded i
In the longLtudinal direction, the calculated maximum crack width using the Newmark method during an SSE event is 0.16 inches.                                Based on an average effective cohesion of 875 psf for the West Babankment fill, it is concluded i
'
that a soil with a shear strength of that magnitude will easily bridge over the postulated maximum crack width of 0.5 inch with negligible infiltration                                                                        j of soil into the structure, even during a seismic event. Therefore, the                                                                            ;
that a soil with a shear strength of that magnitude will easily bridge over
,
the postulated maximum crack width of 0.5 inch with negligible infiltration                                                                        j of soil into the structure, even during a seismic event. Therefore, the                                                                            ;
function of.the existing structure will not be impaired.
function of.the existing structure will not be impaired.
Quertion 3:
Quertion 3:
Line 107: Line 75:
;
;
force or deflections. Justify why such criteria is adequate J
force or deflections. Justify why such criteria is adequate J
for seismic load. Provide any examples where such criteria has j                                  been used (ASME, ACI, or AISC, etc.) possibly in nucleat                                          ,. lant
for seismic load. Provide any examples where such criteria has j                                  been used (ASME, ACI, or AISC, etc.) possibly in nucleat                                          ,. lant design.
'
design.
.


===Response===
===Response===
Line 125: Line 90:
w        -  n-,-    - , , , , , , + ,  ,-,.<w--v      ,,-c.., , , ,- _ . . , ,v-.. ,,,._.p,.  , ., ,,_..,,- ..
w        -  n-,-    - , , , , , , + ,  ,-,.<w--v      ,,-c.., , , ,- _ . . , ,v-.. ,,,._.p,.  , ., ,,_..,,- ..


                                >
.
      . '. . .
  '
    .        .
4 Response to Question 3 (Continued):
4 Response to Question 3 (Continued):
direction is the development of gross separations and cracks to the extent that surrounding soil could enter the SWIS and either impair flow or create voids in the surrounding embankment. Based on evaluation of the shear strength of the soil, a through thickness crack width of 1/2 inch will not impair function of the SWIS.
direction is the development of gross separations and cracks to the extent that surrounding soil could enter the SWIS and either impair flow or create voids in the surrounding embankment. Based on evaluation of the shear strength of the soil, a through thickness crack width of 1/2 inch will not impair function of the SWIS.
Line 140: Line 100:
===Response===
===Response===
South Carolina Electric & Gas submitted the criteria to be applied to the bi-annual survey data to the USNRC on June 6, 1980. If that criteria is exceeded, the USNRC will be notified and an engineering evaluation will be performed. The principal concern of the engineering evaluation will be to ascertain that the extent of cracking at that time has not resultad in cir-cumstances which would lead to an impairment of function.
South Carolina Electric & Gas submitted the criteria to be applied to the bi-annual survey data to the USNRC on June 6, 1980. If that criteria is exceeded, the USNRC will be notified and an engineering evaluation will be performed. The principal concern of the engineering evaluation will be to ascertain that the extent of cracking at that time has not resultad in cir-cumstances which would lead to an impairment of function.
Dependent upon the conclusions of the evaluation, the following actions
Dependent upon the conclusions of the evaluation, the following actions may be taken:
                                                                                  '
may be taken:
:
                                                                                                '
a)- Increased frequency of surveys for continuing review.
a)- Increased frequency of surveys for continuing review.
b) Other tests or inspections that may be deemed necessary.
b) Other tests or inspections that may be deemed necessary.


                                       ._ ~.
                                       ._ ~.
    *        *
            -
   ;  .
   ;  .
         . -    . .                                      -S-                                    >
         . -    . .                                      -S-                                    >
Ouestion 5:
Ouestion 5:
If there were through thickness cracks, determine the differential hydrostatic pressure between inside and outside the structure with pumps in operation.
If there were through thickness cracks, determine the differential hydrostatic pressure between inside and outside the structure with pumps in operation.
"


===Response===
===Response===
In the event of an accident condition with two pumps in operation at high speed, the flow velocity in the SWIS is 0.42 ft./sec. The corresponding pressure differential between inside and outside the SWIS, due to the pumping operation, is essentially zero,
In the event of an accident condition with two pumps in operation at high speed, the flow velocity in the SWIS is 0.42 ft./sec. The corresponding pressure differential between inside and outside the SWIS, due to the pumping operation, is essentially zero,
                                                     ._.        -                    . - .  .-}}
                                                     ._.        -                    . - .  .-}}

Revision as of 04:53, 1 February 2020

Forwards Addl Info Re Svc Water Intake Structure in Response to NRC 800623 Request.All Load Combinations & Loads Specified for Reinforced Concrete Strength Design Satisfied
ML19320C139
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/03/1980
From: Crews E
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8007160252
Download: ML19320C139 (6)


Text

.. 3-SOUTH CAROLINA ELECTRIC & gas COMPANY post orrics som re.

COLUMBIA,$OUTH CAROLINA 29218 E. H. Ca rw s, J a.

v.c . eu .. July 3, 1980

c. u. .v. ...c...v.oevio

. . cac'."*

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50-395 Additional NRC Questons -

Service Water Intake Structure

Dear Mr. Denton:

South Carolina Electric & Gas Company, acting for itself and as agent for South Carolina Public Service Authority, hereby submits five (5) copies of

" Responses to Requests for Additional Information - Settlement of Service Water Intake Structure." This information is being submitted in response to additional NRC questions on the service water intake structure as enclosed with NRC letter dated June 23 980, concerning " Summary of Meeting Held on June 13, 1980 with South Car ina lectric & Gas Company."

e ruly yours, E. H. Crews, Jr.

RBW:EHC:jw cc: H. T. Babb G. H. Fischer W. C. Mescher W. S. Murphy W. A. Williams, Jr.

T. B. Conner, Jr.

B. A. Bursey NPCF/Dixon l File 00}

. S l ll1 l

v-.. ~ e s2 R

4 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SETTLEMENT OF SERVICE WATER INTAKE STRUCTURE V. C. SUMMER UNIT 1 i SOUTH CAROLINA ELECTRIC & GAS CO.

Question 1:

Evaluate the existing structure to determine safety margin against NRC SRP 3.8.4.

Response

The Service Water Intake Structure (SWIS) is designed as a two dimensional structure in the transverse direction. The loads are primarily sustained by sections normal to the longitudinal axis. All load combinations and loads specified in Standard Review Plan (SRP) 3.8.4 for reinforced concrete strength design were satisfied.

The controlling load combination included dead, hydrostatic, and soil pressure loads for the unique condition of the SWIS being dewatered, via stop logs, and the Service Water Pond being completely filled. Provisions for stop logs have been made at the intake end of the SWIS and at the entrance to the pump chamber.

A comparison of factored internal forces and moments to the acceptance limits of SRP 3.8.4 results in the most critical section having a strength which is 20% in excess of that required. The load combinations which include t

' tie aad SSE result in the most critical section having a strength of 150%

l l and 230% respectively in excess of those required.

I As.far as the longitudinal direction of the SWIS is concerned, the original design of the SWIS included longitudinal reinforcing steel for 6.stribution of cracks. associated with thermal and shrinkage effects. The original design did not include consideration of the magnitude of differential settlement that

~ '

  • Response to Question 1 (Continued):

occurred. Since the unanticipated settlement has occurred, and the cracks have been grouted, the longitudinal reinforcing steel now serves exactly the same purpose as originally intended.

As described in the Response to Question 3, the longitudinal direction could crack due to a seismic event. It is conservatively calculated using Newmark's theory that the actual maximum crack width that could occur due to an SSE is 0.16 inches. The safety margin in the longitudinal direction can only be based upon the degree of cracking and its effect on safe function of the SWIS. In response to Question 3, we have determined that the SWIS will functica satisfactorily with a crack vidth of 1/2 inch. The 1/2 inch is a lower bound number, but neverthelest could be used to determine a safety margin by comparing it with the actual calculated crack width of 0.15 inches.

On this basis, the safety margin of the structure in the longitudinal direction can be said to be at least 3.0.

Question 2:

If there were longitudinal separation and transverse relative displacement, evaluate the functionability of the existing structure, with a conservative assumption on the extent of through structure cracking.

Response

Transverse relative displacements of at least 2 ft. (wall thickness) would be needed to cause a net opening which might impair functionability of the SWIS. This event would require a shear mechanism capable of transverse rupture of the SWIS and the West Embankment. Such extensive movement would

-require a seismic event far in excess of the magnitude postulated for the l

site.

_c;c .. _.c 2. .: - -

+

. , ..;-

_3 Response to Question 2 (Continued):

In the longLtudinal direction, the calculated maximum crack width using the Newmark method during an SSE event is 0.16 inches. Based on an average effective cohesion of 875 psf for the West Babankment fill, it is concluded i

that a soil with a shear strength of that magnitude will easily bridge over the postulated maximum crack width of 0.5 inch with negligible infiltration j of soil into the structure, even during a seismic event. Therefore, the  ;

function of.the existing structure will not be impaired.

Quertion 3:

L Describe the engineering evaluation criteria of the existing structure in the longitudinal direction. Such criteria should

., be given in terms of quantitative values of stress, strain,

force or deflections. Justify why such criteria is adequate J

for seismic load. Provide any examples where such criteria has j been used (ASME, ACI, or AISC, etc.) possibly in nucleat ,. lant design.

Response

The unpredicted differential settlement of the SWIS created transverse cracking and possibly yielding of reinforcement in the longitudinal direction.

Settlement is now considered stabilized, and the cracks have been grouted. The

! ;L*!S3 as it currently exists, is capable of performing its intended function.

! This conclusion is supported by the fact 'that the primary lor de (Dead, Hydro-i static, Soil Pressure and Seismic) described in the Response to Question 1, are all resisted in the transverse dircetion.

i i ACI 318.cnd ACI 349 do not include quantitative stress, strain, force or

, ' deflection criteria of a secondary nature that would be applicable to the

. longitudinal direction of the'SWIS. This means that acceprence criteria for the longitudinal direction must be based.directly upon the conditions which can lead to no" loss of function. A loss of function in the longitudinal l

. .e

, ,n- --

w - n-,- - , , , , , , + , ,-,.<w--v ,,-c.., , , ,- _ . . , ,v-.. ,,,._.p,. , ., ,,_..,,- ..

4 Response to Question 3 (Continued):

direction is the development of gross separations and cracks to the extent that surrounding soil could enter the SWIS and either impair flow or create voids in the surrounding embankment. Based on evaluation of the shear strength of the soil, a through thickness crack width of 1/2 inch will not impair function of the SWIS.

The seismic load in the longitudinal direction is of a secondary nature and is self-limiting. The SWIS would move with the embankment based on the assumption of Newmark's equation for buried structures. Since the embankment is qualified seismically, the tunnel will remain functional during and af ter the seismic event.

Question 4:

Describe the action that would be taken if the acceptance ,

criteria were to be exceeded (settlement monitoring).

Response

South Carolina Electric & Gas submitted the criteria to be applied to the bi-annual survey data to the USNRC on June 6, 1980. If that criteria is exceeded, the USNRC will be notified and an engineering evaluation will be performed. The principal concern of the engineering evaluation will be to ascertain that the extent of cracking at that time has not resultad in cir-cumstances which would lead to an impairment of function.

Dependent upon the conclusions of the evaluation, the following actions may be taken:

a)- Increased frequency of surveys for continuing review.

b) Other tests or inspections that may be deemed necessary.

._ ~.

.

. - . . -S- >

Ouestion 5:

If there were through thickness cracks, determine the differential hydrostatic pressure between inside and outside the structure with pumps in operation.

Response

In the event of an accident condition with two pumps in operation at high speed, the flow velocity in the SWIS is 0.42 ft./sec. The corresponding pressure differential between inside and outside the SWIS, due to the pumping operation, is essentially zero,

._. - . - . .-