ML19323D436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:_ - _ .          . _ _        __ __                                  - _ _ _ _ _ _
{{#Wiki_filter:_ - _ .          . _ _        __ __                                  - _ _ _ _ _ _
6
6
*
                                                                            ....-
                                   --._                        g. ---
                                   --._                        g. ---
                                                  -
                                                                  .
                                  --
                                         .-      =      :a;: - -
                                         .-      =      :a;: - -
1750 Chestnut Street Tower II May 13, 1980 Mr. James P. O'Railly, Director U.S. Muchar Regulatory Co-imaion Office of Inspection and Enforcement Engion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
1750 Chestnut Street Tower II May 13, 1980 Mr. James P. O'Railly, Director U.S. Muchar Regulatory Co-imaion Office of Inspection and Enforcement Engion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Line 32: Line 27:
TENNESSIE VALLEY AUTHORITY - SEQUOTAE NUCLEAR PLANT UNIT 1 - DOCEET NO. 50-327 - FACILITI OPERATING LICENSE DPR REPORvARLR OCCURRENCE REPORT SQRO-50-327/8038 The anetased report provides details concerning failure to perform surv=411--e requirement 4.4.7 within technical specification allotted time frequency. This report is submitted in accordance with Sequoyah unit 1 T=hi-=1 Specification 6.9.1.13.b.
TENNESSIE VALLEY AUTHORITY - SEQUOTAE NUCLEAR PLANT UNIT 1 - DOCEET NO. 50-327 - FACILITI OPERATING LICENSE DPR REPORvARLR OCCURRENCE REPORT SQRO-50-327/8038 The anetased report provides details concerning failure to perform surv=411--e requirement 4.4.7 within technical specification allotted time frequency. This report is submitted in accordance with Sequoyah unit 1 T=hi-=1 Specification 6.9.1.13.b.
Very truly yours, TRNMRRSEE VALLE! AUTHORITY l
Very truly yours, TRNMRRSEE VALLE! AUTHORITY l
                                                                                                              !
J. R. calhaun                                                                                            l Director of Nuclear Power                                                                                j 1
J. R. calhaun                                                                                            l Director of Nuclear Power                                                                                j 1
l Enclosure (3) cc (Enclosure):
l Enclosure (3) cc (Enclosure):

Latest revision as of 02:09, 1 February 2020

Forwards LER 80-038/03L-0
ML19323D436
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/13/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323D437 List:
References
NUDOCS 8005210559
Download: ML19323D436 (1)


Text

_ - _ . . _ _ __ __ - _ _ _ _ _ _

6

--._ g. ---

.- = :a;: - -

1750 Chestnut Street Tower II May 13, 1980 Mr. James P. O'Railly, Director U.S. Muchar Regulatory Co-imaion Office of Inspection and Enforcement Engion II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'% illy:

TENNESSIE VALLEY AUTHORITY - SEQUOTAE NUCLEAR PLANT UNIT 1 - DOCEET NO. 50-327 - FACILITI OPERATING LICENSE DPR REPORvARLR OCCURRENCE REPORT SQRO-50-327/8038 The anetased report provides details concerning failure to perform surv=411--e requirement 4.4.7 within technical specification allotted time frequency. This report is submitted in accordance with Sequoyah unit 1 T=hi-=1 Specification 6.9.1.13.b.

Very truly yours, TRNMRRSEE VALLE! AUTHORITY l

J. R. calhaun l Director of Nuclear Power j 1

l Enclosure (3) cc (Enclosure):

Director (3)

Office of Management Information and Program Control U.S. Nuclear Regulatory Commission WasM == ton, DC 20555 Director (40)

Office of Inspection and Enforcement U.S. Nuclear Regulatory I'a-insion Washington, DC 20555 Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, california 94303 lOO)  !

s Mr. W. T. Cottle, NRC Inspector, Sequoyah $

ll 1

1 I

8005210559

_ .- . -- . _ - - . -. __.