IR 05000482/2013004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/14/2013
| issue date = 11/14/2013
| title = IR 05000482-13-004; 07/01/2013 - 09/28/2013; Wolf Creek Generating Station, Integrated Resident and Regional Report; Fire Protection
| title = IR 05000482-13-004; 07/01/2013 - 09/28/2013; Wolf Creek Generating Station, Integrated Resident and Regional Report; Fire Protection
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Sunseri M W
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATE S NUC LEAR REGULATOR Y C OMMI SSI ON ber 14, 2013
[[Issue date::November 14, 2013]]


Matthew W. Sunseri, President and
==SUBJECT:==
 
WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2013004
Chief Executive Officer
 
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
 
SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2013004


==Dear Mr. Sunseri:==
==Dear Mr. Sunseri:==
On September 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an  
On September 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. On October 8, 2013, the NRC inspectors discussed the results of this inspection with Mr. M. Sunseri, President and Chief Executive Officer, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.


inspection at your Wolf Creek Generating Station. On October 8, 2013, the NRC inspectors discussed the results of this inspection with Mr. M. Sunseri, President and Chief Executive Officer, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.


NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements. Further, inspectors documented licensee-identified violations which were determined `to be of very low safety significance in this  
This finding involved a violation of NRC requirements. Further, inspectors documented licensee-identified violations which were determined `to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.


report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the non-cited violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Wolf Creek Generating Station.
 
If you contest the non-cited violations or significance of the NCVs , you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Wolf Creek Generating Station.


If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ David L. Proulx for
 
Neil O'Keefe, Chief
 
Project Branch B
 
Division of Reactor Projects


Docket Nos.: 50-482 License Nos: NPF-42  
Sincerely,
/RA/ David L. Proulx for Neil O'Keefe, Chief Project Branch B Division of Reactor Projects Docket Nos.: 50-482 License Nos: NPF-42


===Enclosure:===
===Enclosure:===
Inspection Report 05000482/2013004 w/  
Inspection Report 05000482/2013004 w/ Attachment: Supplemental Information
 
===Attachment:===
Supplemental Information cc w/ encl: Electronic Distribution
 
ML13318B072 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials NFO Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials NFO SRI:DRP/B RI:DRP/B C:DRS/EB1 C:DRS/EB2 C:DRS/OB C:DRS/PSB1 C Peabody C Hunt(Acting) TFarnholtz G. Miller V. Gaddy M. Haire /RA/ E /RA/ E /RA/ /RA/ /RA/ /RA/ DAH for 11/13/13 11/14/13 11/12/13 11/12/13 11/12/13 11/13/13 C:DRS/PSB2 C:DRS/TSB BC:DRP/B J. Drake RKellar N OKeefe /RA/ /RA/ /RA/ DProulx for 11/12/13 11/12/13 11/14/13 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000482 License: NPF 42 Report: 05000482/2013004 Licensee: Wolf Creek Nuclear Operating Corporation Facility: Wolf Creek Generating Station Location: 1550 Oxen Lane NE, Burlington, Kansas Dates: July 1 through September 28, 2013 Inspectors: C. Peabody, Senior Resident Inspector C. Hunt, Acting Resident Inspector R. Stroble, Resident Inspector J. Laughlin, Emergency Preparedness Inspector, NSIR


M. Williams, Reactor Inspector Approved By: Neil O'Keefe, Chief, Project Branch B Division of Reactor Projects  
REGION IV==
Docket: 05000482 License: NPF 42 Report: 05000482/2013004 Licensee: Wolf Creek Nuclear Operating Corporation Facility: Wolf Creek Generating Station Location: 1550 Oxen Lane NE, Burlington, Kansas Dates: July 1 through September 28, 2013 Inspectors: C. Peabody, Senior Resident Inspector C. Hunt, Acting Resident Inspector R. Stroble, Resident Inspector J. Laughlin, Emergency Preparedness Inspector, NSIR M. Williams, Reactor Inspector Approved By: Neil O'Keefe, Chief, Project Branch B Division of Reactor Projects-1-  Enclosure


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000482/2013004; 07/01 - 09/28/2013; WOLF CREEK GENERATING STATION, Integrated Resident and Regional Report;
IR 05000482/2013004; 07/01 - 09/28/2013; WOLF CREEK GENERATING STATION,


Fire Protection.
Integrated Resident and Regional Report; Fire Protection.


The report covered a 3-month period of inspection by resident inspectors and a region-based inspector. One Green non-cited violation of very low safety significance was identified. The significance of most findings is indicated by their color (Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, "Significance Determination Process.The cross-cutting aspect is determined using Inspection Manual Chapter 0310, "Components Within the Cross-Cutting Areas.Findings for which the significance determination process does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Proce ss," Revision 4, dated December 2006.
The report covered a 3-month period of inspection by resident inspectors and a region-based inspector. One Green non-cited violation of very low safety significance was identified. The significance of most findings is indicated by their color (Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, Significance Determination Process. The cross-cutting aspect is determined using Inspection Manual Chapter 0310, Components Within the Cross-Cutting Areas. Findings for which the significance determination process does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.


===A. NRC-Identified Findings and Self-Revealing Findings===
===NRC-Identified Findings and Self-Revealing Findings===


===Cornerstone: Initiating Events===
===Cornerstone: Initiating Events===
: '''Green.'''
: '''Green.'''
The inspectors identified a non-cited violation of Technical Specification 5.4.1.d, "Fire Protection Program Procedures," for the failure to analyze scaffolding for fire protection impairments and transient combustible loading. The cause of the finding was a procedure change that allowed for a grace period of one working day to complete a fire protection review of newly erected scaffolding. As a result, there was no longer a direct interface with the scaffold builders and fire protection engineers, which complicated scoping and tracking the required inspections. This violation was entered into the corrective action program as Condition Report 71910.
The inspectors identified a non-cited violation of Technical Specification 5.4.1.d, Fire Protection Program Procedures, for the failure to analyze scaffolding for fire protection impairments and transient combustible loading. The cause of the finding was a procedure change that allowed for a grace period of one working day to complete a fire protection review of newly erected scaffolding. As a result, there was no longer a direct interface with the scaffold builders and fire protection engineers, which complicated scoping and tracking the required inspections. This violation was entered into the corrective action program as Condition Report 71910.


Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, "Significance Determination for Findings at Power," which required screening using MC 0609, Appendix F, "Fire Protection Significance Determination Process.Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not affect the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established. [H.3(a)](Section 1R05.1.b)  
Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, Significance Determination for Findings at Power, which required screening using MC 0609, Appendix F, Fire Protection Significance Determination Process. Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not affect the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established. [H.3(a)](Section 1R05.1.b)


===B. Licensee-Identified Violations===
===Licensee-Identified Violations===


Violations of very low safety significance or Severity Level IV that were identified by the licensee have been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensee's corrective action program. These violations and associated corrective action tracking numbers are listed in Section 4OA7 of this report.
Violations of very low safety significance or Severity Level IV that were identified by the licensee have been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. These violations and associated corrective action tracking numbers are listed in Section 4OA7 of this report.


=PLANT STATUS=
=PLANT STATUS=
Line 88: Line 69:
Wolf Creek began the inspection period at 100 percent power. On September 11, 2013, Wolf Creek performed a technical specification-required shutdown due to a non-functional Class 1E air conditioning unit. Wolf Creek remained offline for the remainder of the inspection period.
Wolf Creek began the inspection period at 100 percent power. On September 11, 2013, Wolf Creek performed a technical specification-required shutdown due to a non-functional Class 1E air conditioning unit. Wolf Creek remained offline for the remainder of the inspection period.


REPORT DETAILS  
REPORT DETAILS


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity {{a|1R01}}
{{a|1R01}}
==1R01 Adverse Weather Protection==
==1R01 Adverse Weather Protection==
{{IP sample|IP=IP 71111.01}}
{{IP sample|IP=IP 71111.01}}
Line 98: Line 78:


====a. Inspection Scope====
====a. Inspection Scope====
Since thunderstorms with potential tornados and high winds were forecast in the vicinity of the facility for September 19, 2013, the inspectors reviewed the plant personnel's overall preparations and protection for the expected weather conditions. On September 19, 2013, the inspectors walked down the offsite power transformers, diesel generators, and Class 1E distribution systems because their safety-related functions could be affected or required as a result of high winds, tornado-generated missiles, or the loss of offsite power. The inspectors evaluated the plant staff's preparations against the site's procedures and determined that the staff's actions were adequate. During the inspection, the inspectors focused on plant design features and the licensee's procedures to respond to tornados and high winds. The inspectors also toured the plant grounds to look for any loose debris that could become missiles during a tornado. The inspectors evaluated operator staffing and accessibility of controls and indications for those systems required to control the plant. Additionally, the inspectors reviewed the Updated Safety Analysis Report (USAR) and performance requirements for the systems selected for inspection and verified that operator actions were appropriate as specified by plant-specific procedures. The inspectors also reviewed a sample of corrective action program items to verify that the licensee had identified adverse weather issues at an appropriate threshold and entered them into the corrective action program for resolution.
Since thunderstorms with potential tornados and high winds were forecast in the vicinity of the facility for September 19, 2013, the inspectors reviewed the plant personnels overall preparations and protection for the expected weather conditions. On September 19, 2013, the inspectors walked down the offsite power transformers, diesel generators, and Class 1E distribution systems because their safety-related functions could be affected or required as a result of high winds, tornado-generated missiles, or the loss of offsite power. The inspectors evaluated the plant staffs preparations against the sites procedures and determined that the staffs actions were adequate. During the inspection, the inspectors focused on plant design features and the licensees procedures to respond to tornados and high winds. The inspectors also toured the plant grounds to look for any loose debris that could become missiles during a tornado. The inspectors evaluated operator staffing and accessibility of controls and indications for those systems required to control the plant. Additionally, the inspectors reviewed the Updated Safety Analysis Report (USAR) and performance requirements for the systems selected for inspection and verified that operator actions were appropriate as specified by plant-specific procedures. The inspectors also reviewed a sample of corrective action program items to verify that the licensee had identified adverse weather issues at an appropriate threshold and entered them into the corrective action program for resolution.


These activities constitute completion of one sample of readiness for impending adverse weather conditions, as defined in Inspection Procedure 71111.01-05.
These activities constitute completion of one sample of readiness for impending adverse weather conditions, as defined in Inspection Procedure 71111.01-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R04}}
{{a|1R04}}
==1R04 Equipment Alignment==
==1R04 Equipment Alignment==
{{IP sample|IP=IP 71111.04}}
{{IP sample|IP=IP 71111.04}}
Line 113: Line 92:
* July 23, 2013, high pressure coolant injection system train B
* July 23, 2013, high pressure coolant injection system train B
* August 9, 2013, train A 120Vac Class 1E instrument power distribution
* August 9, 2013, train A 120Vac Class 1E instrument power distribution
* August 14, 2013, train B 125Vdc Class 1E power distribution The inspectors selected these systems based on their risk significance relative to the reactor safety cornerstones at the time they were inspected, while considering out of service time, inoperable or degraded conditions, recent system outages, and maintenance, modification, and testing. The inspectors attempted to identify any discrepancies that could affect the function of the system, and, therefore, potentially increase risk. The inspectors reviewed applicable operating procedures, system diagrams, USAR, technical specification requirements, administrative technical specifications, outstanding work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could  
* August 14, 2013, train B 125Vdc Class 1E power distribution The inspectors selected these systems based on their risk significance relative to the reactor safety cornerstones at the time they were inspected, while considering out of service time, inoperable or degraded conditions, recent system outages, and maintenance, modification, and testing. The inspectors attempted to identify any discrepancies that could affect the function of the system, and, therefore, potentially increase risk. The inspectors reviewed applicable operating procedures, system diagrams, USAR, technical specification requirements, administrative technical specifications, outstanding work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have rendered the systems incapable of performing their intended functions. The inspectors also inspected accessible portions of the systems to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no obvious deficiencies. The inspectors also verified that the licensee had properly identified and resolved equipment alignment problems that could cause initiating events or impact the capability of mitigating systems or barriers and entered them into the corrective action program with the appropriate significance characterization. Specific documents reviewed during this inspection are listed in the attachment.
 
have rendered the systems incapable of performing their intended functions. The inspectors also inspected accessible portions of the systems to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no obvious deficiencies. The inspectors also verified that the licensee had properly identified and resolved equipment alignment problems that could cause initiating events or impact the capability of mitigating systems or barriers and entered them into the corrective action program with the appropriate significance characterization. Specific documents reviewed during this inspection are listed in the attachment.


These activities constitute completion of three partial system walkdown samples as defined in Inspection Procedure 71111.04-05.
These activities constitute completion of three partial system walkdown samples as defined in Inspection Procedure 71111.04-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R05}}
{{a|1R05}}
==1R05 Fire Protection==
==1R05 Fire Protection==
{{IP sample|IP=IP 71111.05}}
{{IP sample|IP=IP 71111.05}}
Line 130: Line 106:
* July 2, 2013, essential service water pipe chase, southeast stairway to auxiliary building, and duct chase, fire areas C-1, C-2, and C-3.
* July 2, 2013, essential service water pipe chase, southeast stairway to auxiliary building, and duct chase, fire areas C-1, C-2, and C-3.
* July 24, 2013, train A emergency diesel generator room, fire area D-1
* July 24, 2013, train A emergency diesel generator room, fire area D-1
* July 24 2013 , train B emergency diesel generator room, fire area D-2
* July 24 2013, train B emergency diesel generator room, fire area D-2
* September 24, 2013, fire zone 16C, battery and switchgear room (2016' floor)
* September 24, 2013, fire zone 16C, battery and switchgear room (2016 floor)
The inspectors reviewed areas to assess if licensee personnel had implemented a fire protection program that adequately controlled combustibles and ignition sources within the plant; effectively maintained fire detection and suppression capability; maintained passive fire protection features in good material condition; and had implemented adequate compensatory measures for out of service, degraded or inoperable fire protection equipment, systems, or features, in accordance with the licensee's fire plan. The inspectors selected fire areas based on their overall contribution to internal fire risk as documented in the plant's Individual Plant Examination of External Events with later additional insights, their potential to affect equipment that could initiate or mitigate a plant transient, or their impact on the plant's ability to respond to a security event. Using the documents listed in the attachment, the inspectors verified that fire hoses and extinguishers were in their designated locations and available for immediate use; that fire detectors and sprinklers were unobstructed; that transient material loading was within the analyzed limits; and fire doors, dampers, and penetration seals appeared to be in satisfactory condition and verified that adequate compensatory measures were put in place by the licensee for out of service, degraded, or inoperable fire protection equipment systems or features. The inspectors also verified that minor issues identified during the inspection were entered into the licensee's corrective action program. Specific documents reviewed during this inspection are listed in the attachment.
The inspectors reviewed areas to assess if licensee personnel had implemented a fire protection program that adequately controlled combustibles and ignition sources within the plant; effectively maintained fire detection and suppression capability; maintained passive fire protection features in good material condition; and had implemented adequate compensatory measures for out of service, degraded or inoperable fire protection equipment, systems, or features, in accordance with the licensees fire plan.
 
The inspectors selected fire areas based on their overall contribution to internal fire risk as documented in the plants Individual Plant Examination of External Events with later additional insights, their potential to affect equipment that could initiate or mitigate a plant transient, or their impact on the plants ability to respond to a security event. Using the documents listed in the attachment, the inspectors verified that fire hoses and extinguishers were in their designated locations and available for immediate use; that fire detectors and sprinklers were unobstructed; that transient material loading was within the analyzed limits; and fire doors, dampers, and penetration seals appeared to be in satisfactory condition and verified that adequate compensatory measures were put in place by the licensee for out of service, degraded, or inoperable fire protection equipment systems or features. The inspectors also verified that minor issues identified during the inspection were entered into the licensees corrective action program.
 
Specific documents reviewed during this inspection are listed in the attachment.


These activities constitute completion of four quarterly fire-protection inspection samples, as defined in Inspection Procedure 71111.05-05.
These activities constitute completion of four quarterly fire-protection inspection samples, as defined in Inspection Procedure 71111.05-05.
Line 139: Line 119:


=====Introduction.=====
=====Introduction.=====
The inspectors identified a Green non-cited violation (NCV) of Technical Specification 5.4.1.d, "Fire Protection Program Procedures," for the failure to analyze erected scaffolding for fire protection equipment impairments and transient combustible loading.
The inspectors identified a Green non-cited violation (NCV) of Technical Specification 5.4.1.d, Fire Protection Program Procedures, for the failure to analyze erected scaffolding for fire protection equipment impairments and transient combustible loading.


=====Description.=====
=====Description.=====
On July 24, 2013, the inspectors performed a fire protection quarterly inspection in both the east and west diesel generator rooms using the Wolf Creek Fire Hazard Analysis procedure E-1F9905, Rev 4. According to the Fire Hazard Analysis, both of the diesel generator rooms were equipped with an automatic pre-action sprinkler system. Wolf Creek procedure AP-10-106, "Fire Preplans", Attachment B, also indicated that the sprinkler system provides suppression coverage for the entire diesel generator room in which it is located. While performing the inspection, the inspectors identified two scaffolds, scaffold 13-S134 in the west diesel generator room and 13-S100 in the east diesel generator room, that were directly beneath two sprinkler heads toward the north end of each respective room. The inspectors observed that no fire impairment permits were completed for the two scaffolds in question and then conferred with the work control senior reactor operator (SRO) to determine the applicable guidance for scaffolding built in the vicinity of fire protection systems. The work control SRO directed the inspector to AP-14A-003, "Scaffold Construction and Use". Section 6.4.33.5 of AP-14A-003 specifies that, scaffolding located in a fire protection sprinkler protected area is required to have a fire protection review if the scaffold deck length or width is 48 inches or greater, or the scaffold deck is within 36 inches of a fire protection sprinkler head. This review is required to determine the impact on the fire protection system itself as well as any administrative fire protection controls that may also be affected. The inspectors noted that the fire protection impact review tag described in attachment D of AP-14A-003 was attached to each scaffold and both tags indicated that a fire protection review was required based on a "Yes" response to question five, "Scaffold >48" wide and constructed in a sprinkler area, or within 36" of a sprinkler head". In addition to question five indicating the need for a fire protection review, the fire protection impact review tag for scaffold 13-S134 also required a fire protection review based on a "Yes" response for question four, "In safety-related areas, do cumulative scaffold combustibles within a 20 feet horizontal radius exceed 200 pounds?". Both fire protection impact review tags indicated that fire protection was notified based on a "Yes" response to question seven, "Fire protection notified?". Although the "constructor or evaluator" signature block was signed on both tags and dated May 10, 2013, and July 18, 2013, for 13-S100 and 13-S134, respectively, the inspectors noted that the signature block for the fire protection review on both tags was blank. The inspectors immediately discussed these observations with the work control SRO and a fire protection representative. When the inspectors informed the fire protection representative of the dates on the tags and the absence of a fire protection signature, the fire protection representative immediately proceeded to both scaffolds to perform the required assessment. Upon completing his review, the fire protection representative concluded that one hour compensatory fire watches were required in accordance with AP-10-103, "Fire Protection Impairment Control", Appendix D, Section D.1.3, for both scaffolds.
On July 24, 2013, the inspectors performed a fire protection quarterly inspection in both the east and west diesel generator rooms using the Wolf Creek Fire Hazard Analysis procedure E-1F9905, Rev 4. According to the Fire Hazard Analysis, both of the diesel generator rooms were equipped with an automatic pre-action sprinkler system. Wolf Creek procedure AP-10-106, Fire Preplans, Attachment B, also indicated that the sprinkler system provides suppression coverage for the entire diesel generator room in which it is located. While performing the inspection, the inspectors identified two scaffolds, scaffold 13-S134 in the west diesel generator room and 13-S100 in the east diesel generator room, that were directly beneath two sprinkler heads toward the north end of each respective room. The inspectors observed that no fire impairment permits were completed for the two scaffolds in question and then conferred with the work control senior reactor operator (SRO) to determine the applicable guidance for scaffolding built in the vicinity of fire protection systems. The work control SRO directed the inspector to AP-14A-003, Scaffold Construction and Use.
 
Section 6.4.33.5 of AP-14A-003 specifies that, scaffolding located in a fire protection sprinkler protected area is required to have a fire protection review if the scaffold deck length or width is 48 inches or greater, or the scaffold deck is within 36 inches of a fire protection sprinkler head. This review is required to determine the impact on the fire protection system itself as well as any administrative fire protection controls that may also be affected. The inspectors noted that the fire protection impact review tag described in attachment D of AP-14A-003 was attached to each scaffold and both tags indicated that a fire protection review was required based on a Yes response to question five, Scaffold >48 wide and constructed in a sprinkler area, or within 36 of a sprinkler head. In addition to question five indicating the need for a fire protection review, the fire protection impact review tag for scaffold 13-S134 also required a fire protection review based on a Yes response for question four, In safety-related areas, do cumulative scaffold combustibles within a 20 feet horizontal radius exceed 200 pounds?.
Both fire protection impact review tags indicated that fire protection was notified based on a Yes response to question seven, Fire protection notified?. Although the constructor or evaluator signature block was signed on both tags and dated May 10, 2013, and July 18, 2013, for 13-S100 and 13-S134, respectively, the inspectors noted that the signature block for the fire protection review on both tags was blank.
 
The inspectors immediately discussed these observations with the work control SRO and a fire protection representative. When the inspectors informed the fire protection representative of the dates on the tags and the absence of a fire protection signature, the fire protection representative immediately proceeded to both scaffolds to perform the required assessment.


Additionally, scaffold 13-S134 required a one hour compensatory watch for cumulative combustible material exceeding 200 pounds in accordance with AP-10-102, "Control of Combustible Material", Section 6.2.2.2 and 6.4.2.1. Condition Report 71910 was written in response to this issue. The inspectors discussed the apparent cause evaluation associated with Condition Report 71910 with the evaluators. The licensee indicated that the cause of the event was due to an administrative procedure change in 2008 which allowed for a grace period of one working day to conduct a fire protection review. Specifically, this no longer required a direct interface with the scaffold builders which complicated scoping and tracking the required inspections. The procedure was corrected to require the fire protection inspection immediately upon erection of scaffolding as corrective action.
Upon completing his review, the fire protection representative concluded that one hour compensatory fire watches were required in accordance with AP-10-103, Fire Protection Impairment Control, Appendix D, Section D.1.3, for both scaffolds.
 
Additionally, scaffold 13-S134 required a one hour compensatory watch for cumulative combustible material exceeding 200 pounds in accordance with AP-10-102, Control of Combustible Material, Section 6.2.2.2 and 6.4.2.1. Condition Report 71910 was written in response to this issue.
 
The inspectors discussed the apparent cause evaluation associated with Condition Report 71910 with the evaluators. The licensee indicated that the cause of the event was due to an administrative procedure change in 2008 which allowed for a grace period of one working day to conduct a fire protection review. Specifically, this no longer required a direct interface with the scaffold builders which complicated scoping and tracking the required inspections. The procedure was corrected to require the fire protection inspection immediately upon erection of scaffolding as corrective action.


=====Analysis.=====
=====Analysis.=====
Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, "Significance Determination for Findings at Power", which required screening using MC 0609, Appendix F, "Fire Protection Significance Determination Process.Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not impact the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established [H.3(a)].  
Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, Significance Determination for Findings at Power, which required screening using MC 0609, Appendix F, Fire Protection Significance Determination Process. Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not impact the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established [H.3(a)].


=====Enforcement.=====
=====Enforcement.=====
Wolf Creek Technical Specification 5.4.1.d requires that written procedures be established, implemented, and maintained covering fire protection program implementation. These procedures include AP-10-102, "Control of Combustible Material", AP-10-103, "Fire Protection Impairment Control", and AP-14A-003, "Scaffold Construction and Use". Procedure AP-14A-003, "Scaffold Construction and Use," Revision 20, required that scaffolding located in a fire protection sprinkler protected area having a scaffold deck length or width greater than 48", or having a scaffold deck within 36" of a fire protection sprinkler head, be reviewed by fire protection to assess its impact on fire protection systems and/or fire protection administrative control. Contrary to the above, from May 10, 2013, to July 24, 2013, not parallel scaffold 13-S100 in the east diesel generator room and from July 18, 2013, to July 24, 2013, scaffold 13-S134 in the west diesel generator room, did not receive a fire protection assessment. Procedure AP-10-103, "Fire Protection Impairment Control," Revision 27, required that any spray and/or sprinkler system that is non-functional, other than in the reactor containment, not in an area containing redundant equipment, shall have an established hourly fire watch to patrol the affected area. Contrary to the above, from May 10, 2013, to July 24, 2013, scaffold 13-S100 in the east diesel generator room, and from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the west diesel generator room, did not receive hourly fire watches. Procedure AP-10-102, "Control of Combustible Material," Revision 17, required a transient combustible materials permit for transient combustible scaffold materials if the scaffold is constructed in a safety-related area, and the cumulative amount of combustible scaffold material within a 20 foot horizontal radius of the scaffold location
Wolf Creek Technical Specification 5.4.1.d requires that written procedures be established, implemented, and maintained covering fire protection program implementation. These procedures include AP-10-102, Control of Combustible Material, AP-10-103, Fire Protection Impairment Control, and AP-14A-003, Scaffold Construction and Use.


exceeds two hundred pounds. Contrary to the above, from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the safety-relate west diesel generator room was within 20 feet of more than 200 cumulative pounds of combustible scaffolding material, but did not have an associated transient combustible material permit completed and hourly compensatory watches were not established for the affected area. This violation is being treated as an NCV, consistent with Section 2.3.2.a of the Enforcement Policy. The violation was entered into the licensee's corrective action program as Condition Report 71910. (NCV 05000482/2013004-01, "Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading.")
Procedure AP-14A-003, Scaffold Construction and Use, Revision 20, required that scaffolding located in a fire protection sprinkler protected area having a scaffold deck length or width greater than 48, or having a scaffold deck within 36 of a fire protection sprinkler head, be reviewed by fire protection to assess its impact on fire protection systems and/or fire protection administrative control. Contrary to the above, from May 10, 2013, to July 24, 2013, not parallel scaffold 13-S100 in the east diesel generator room and from July 18, 2013, to July 24, 2013, scaffold 13-S134 in the west diesel generator room, did not receive a fire protection assessment.
 
Procedure AP-10-103, Fire Protection Impairment Control, Revision 27, required that any spray and/or sprinkler system that is non-functional, other than in the reactor containment, not in an area containing redundant equipment, shall have an established hourly fire watch to patrol the affected area. Contrary to the above, from May 10, 2013, to July 24, 2013, scaffold 13-S100 in the east diesel generator room, and from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the west diesel generator room, did not receive hourly fire watches.
 
Procedure AP-10-102, Control of Combustible Material, Revision 17, required a transient combustible materials permit for transient combustible scaffold materials if the scaffold is constructed in a safety-related area, and the cumulative amount of combustible scaffold material within a 20 foot horizontal radius of the scaffold location exceeds two hundred pounds. Contrary to the above, from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the safety-relate west diesel generator room was within 20 feet of more than 200 cumulative pounds of combustible scaffolding material, but did not have an associated transient combustible material permit completed and hourly compensatory watches were not established for the affected area.
 
This violation is being treated as an NCV, consistent with Section 2.3.2.a of the Enforcement Policy. The violation was entered into the licensees corrective action program as Condition Report 71910. (NCV 05000482/2013004-01, Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading.)
{{a|1R06}}
{{a|1R06}}
==1R06 Flood Protection Measures==
==1R06 Flood Protection Measures==
Line 158: Line 153:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the USAR, the flooding analysis, and plant procedures to assess susceptibilities involving internal flooding; reviewed the corrective action program to determine if licensee personnel identified and corrected flooding problems; inspected  
The inspectors reviewed the USAR, the flooding analysis, and plant procedures to assess susceptibilities involving internal flooding; reviewed the corrective action program to determine if licensee personnel identified and corrected flooding problems; inspected underground bunkers/manholes to verify the adequacy of sump pumps, level alarm circuits, cable splices subject to submergence, and drainage for bunkers/manholes; and verified that operator actions for coping with flooding can reasonably achieve the desired outcomes. The inspectors also inspected the areas listed below to verify the adequacy of equipment seals located below the flood line, floor and wall penetration seals, watertight door seals, common drain lines and sumps, sump pumps, level alarms, and control circuits, and temporary or removable flood barriers. Specific documents reviewed during this inspection are listed in the attachment.
 
underground bunkers/manholes to verify the adequacy of sump pumps, level alarm circuits, cable splices subject to submergence, and drainage for bunkers/manholes; and verified that operator actions for coping with flooding can reasonably achieve the desired outcomes. The inspectors also inspected the areas listed below to verify the adequacy of equipment seals located below the flood line, floor and wall penetration seals, watertight door seals, common drain lines and sumps, sump pumps, level alarms, and control circuits, and temporary or removable flood barriers. Specific documents reviewed during this inspection are listed in the attachment.
* August 1, 2013, essential service water cable vault 5A (bunker/manhole)
* August 1, 2013, essential service water cable vault 5A (bunker/manhole)
* August 5, 2013, essential service water cable vault 1B (bunker/manhole)
* August 5, 2013, essential service water cable vault 1B (bunker/manhole)
* September 25, 2013, turbine building condensate pit, and pathways from the overflow of the pit during a postulated circulating water system pipe rupture to outside building and protection of overflow into safety-related spaces (flood protection walkdown)
* September 25, 2013, turbine building condensate pit, and pathways from the overflow of the pit during a postulated circulating water system pipe rupture to outside building and protection of overflow into safety-related spaces (flood protection walkdown)
* September 25, 2013, control room alarm panels for hi level alarms in condensate pit, and operator procedures for compensatory actions for securing circulating water pumps during postulated internal flooding from circulating water system pipe rupture (flood protection walkdown)
* September 25, 2013, control room alarm panels for hi level alarms in condensate pit, and operator procedures for compensatory actions for securing circulating water pumps during postulated internal flooding from circulating water system pipe rupture (flood protection walkdown)
These activities constitute completion of two flood protection measures inspection sample and two bunker/manhole samples, as defined in Inspection  
These activities constitute completion of two flood protection measures inspection sample and two bunker/manhole samples, as defined in Inspection Procedure 71111.06-05
 
Procedure 71111.06-05


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R11}}
{{a|1R11}}
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance==
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11}}
{{IP sample|IP=IP 71111.11}}
Line 177: Line 167:


====a. Inspection Scope====
====a. Inspection Scope====
On September 11, 2013, the inspectors observed a crew of licensed operators in the plant's simulator during requalification testing. The inspectors assessed the following areas:
On September 11, 2013, the inspectors observed a crew of licensed operators in the plants simulator during requalification testing. The inspectors assessed the following areas:
* Licensed operator performance
* Licensed operator performance
* The ability of the licensee to administer the evaluations
* The ability of the licensee to administer the evaluations
Line 190: Line 180:


====a. Inspection Scope====
====a. Inspection Scope====
On August 7, 2013, the inspectors observed the performance of on-shift licensed operators in the plant's main control room. At the time of the observations, the plant was in a period of heightened activity due to restoring non-safety electrical power following a lightning strike. This activity also occurred during essential service water and emergency diesel generator planned maintenance outages. The inspectors observed the operators' performance of the following activities:
On August 7, 2013, the inspectors observed the performance of on-shift licensed operators in the plants main control room. At the time of the observations, the plant was in a period of heightened activity due to restoring non-safety electrical power following a lightning strike. This activity also occurred during essential service water and emergency diesel generator planned maintenance outages. The inspectors observed the operators performance of the following activities:
* Shift Turnover and Reactivity Briefs
* Shift Turnover and Reactivity Briefs
* 13kV and 4kV Non-Class 1E Power Distribution Switching
* 13kV and 4kV Non-Class 1E Power Distribution Switching
* Essential Service Water Pump Testing
* Essential Service Water Pump Testing
* Emergency Diesel Generator Testing
* Emergency Diesel Generator Testing
* Chemical and Volume Control System routine boron dilutions to maintain power In addition, the inspectors assessed the operators' adherence to plant procedures, including AP 21-001, Conduct of Operations, and other operations department policies.
* Chemical and Volume Control System routine boron dilutions to maintain power In addition, the inspectors assessed the operators adherence to plant procedures, including AP 21-001, Conduct of Operations, and other operations department policies.


These activities constitute completion of one quarterly licensed-operator performance samples, as defined in Inspection Procedure 71111.11.
These activities constitute completion of one quarterly licensed-operator performance samples, as defined in Inspection Procedure 71111.11.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R13}}
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==
==1R13 Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13}}
{{IP sample|IP=IP 71111.13}}
Line 209: Line 198:
* July 29, 2013 - August 5, 2013, weekly risk assessment
* July 29, 2013 - August 5, 2013, weekly risk assessment
* August 26, 2013, emergent work - voids found in train A component cooling water system following pump maintenance
* August 26, 2013, emergent work - voids found in train A component cooling water system following pump maintenance
* September 5, 2013, emergent work - tu rbine driven auxiliary feedwater pump positioner fault during trip throttle valve testing
* September 5, 2013, emergent work - turbine driven auxiliary feedwater pump positioner fault during trip throttle valve testing
* September 11, 2013, emergent work - Class 1E air conditioning unit failure The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that licensee personnel performed risk assessments as required by 10 CFR 50.65(a)(4)and that the assessments were accurate and complete. When licensee personnel performed emergent work, the inspectors verified that the licensee personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work, discussed the results of the assessment with the licensee's probabilistic risk analyst or shift technical advisor, and verified plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met. Specific documents reviewed during this inspection are listed in the attachment.
* September 11, 2013, emergent work - Class 1E air conditioning unit failure The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that licensee personnel performed risk assessments as required by 10 CFR 50.65(a)(4)and that the assessments were accurate and complete. When licensee personnel performed emergent work, the inspectors verified that the licensee personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work, discussed the results of the assessment with the licensee's probabilistic risk analyst or shift technical advisor, and verified plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met. Specific documents reviewed during this inspection are listed in the attachment.


These activities constitute completion of four maintenance risk assessments and emergent work control inspection samples, as defined in Inspection  
These activities constitute completion of four maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13-05.
 
Procedure 71111.13-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R15}}
{{a|1R15}}
==1R15 Operability Evaluations and Functionality Assessments==
==1R15 Operability Evaluations and Functionality Assessments==
{{IP sample|IP=IP 71111.15}}
{{IP sample|IP=IP 71111.15}}
Line 228: Line 214:
* August 22, 2013, containment temperature indications instrument uncertainty
* August 22, 2013, containment temperature indications instrument uncertainty
* September 7, 2013, restoration of turbine-driven auxiliary feedwater pump following configuration change package to jumper out of governor valve motor thermal overload signal
* September 7, 2013, restoration of turbine-driven auxiliary feedwater pump following configuration change package to jumper out of governor valve motor thermal overload signal
* September 11, 2013, power block buildings seismic qualification The inspectors selected these operability and functionality assessments based on the risk significance of the associated components and systems along with other factors, such as engineering analysis and judgment, operating experience, and performance history. The inspectors evaluated the technical adequacy of the evaluations to ensure technical specification operability was properly justified and to verify the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and USAR to the licensee's evaluations to  
* September 11, 2013, power block buildings seismic qualification The inspectors selected these operability and functionality assessments based on the risk significance of the associated components and systems along with other factors, such as engineering analysis and judgment, operating experience, and performance history. The inspectors evaluated the technical adequacy of the evaluations to ensure technical specification operability was properly justified and to verify the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and USAR to the licensees evaluations to determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sampling of corrective action documents to verify that the licensee was identifying and correcting any deficiencies associated with operability evaluations. Specific documents reviewed during this inspection are listed in the attachment.
 
determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sampling of corrective action documents to verify that the licensee was identifying and correcting any deficiencies associated with operability evaluations. Specific documents reviewed during this inspection are listed in the attachment.


These activities constitute completion of five operability evaluations inspection samples, as defined in Inspection Procedure 71111.15-05.
These activities constitute completion of five operability evaluations inspection samples, as defined in Inspection Procedure 71111.15-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R19}}
{{a|1R19}}
==1R19 Post-Maintenance Testing==
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19}}
{{IP sample|IP=IP 71111.19}}
Line 244: Line 227:
* August 22, 2013, component cooling water pump A casing ultrasonic tests
* August 22, 2013, component cooling water pump A casing ultrasonic tests
* August 23, 2013, steam generator B pressure transmitter replacement
* August 23, 2013, steam generator B pressure transmitter replacement
* August 29, 2013, steam generator feedwater bypass flow control valve I/P converter replacements  
* August 29, 2013, steam generator feedwater bypass flow control valve I/P converter replacements The inspectors selected these activities based upon the structure, system, or component's ability to affect risk. The inspectors evaluated these activities for the following (as applicable):
 
The inspectors selected these activities based upon the structure, system, or component's ability to affect risk. The inspectors evaluated these activities for the following (as applicable):
* The effect of testing on the plant had been adequately addressed; testing was adequate for the maintenance performed
* The effect of testing on the plant had been adequately addressed; testing was adequate for the maintenance performed
* Acceptance criteria were clear and demonstrated operational readiness; test instrumentation was appropriate The inspectors evaluated the activities against the technical specifications, the USAR, 10 CFR Part 50 requirements, licensee procedures, and various NRC generic communications to ensure that the test results adequately ensured that the equipment met the licensing basis and design requirements. In addition, the inspectors reviewed corrective action documents associated with post-maintenance tests to determine whether the licensee was identifying problems and entering them in the corrective action program and that the problems were being corrected commensurate with their importance to safety. Specific documents reviewed during this inspection are listed in  
* Acceptance criteria were clear and demonstrated operational readiness; test instrumentation was appropriate The inspectors evaluated the activities against the technical specifications, the USAR, 10 CFR Part 50 requirements, licensee procedures, and various NRC generic communications to ensure that the test results adequately ensured that the equipment met the licensing basis and design requirements. In addition, the inspectors reviewed corrective action documents associated with post-maintenance tests to determine whether the licensee was identifying problems and entering them in the corrective action program and that the problems were being corrected commensurate with their importance to safety. Specific documents reviewed during this inspection are listed in the attachment.
 
the attachment.


These activities constitute completion of three post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19-05.
These activities constitute completion of three post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R20}}
{{a|1R20}}
==1R20 Refueling and Other Outage Activities==
==1R20 Refueling and Other Outage Activities==
{{IP sample|IP=IP 71111.20}}
{{IP sample|IP=IP 71111.20}}
Line 272: Line 250:


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R22}}
{{a|1R22}}
==1R22 Surveillance Testing==
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22}}
{{IP sample|IP=IP 71111.22}}
Line 301: Line 278:
No findings were identified.
No findings were identified.


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness
{{a|1EP4}}
{{a|1EP4}}
==1EP4 Emergency Action Level and Emergency Plan Changes==
==1EP4 Emergency Action Level and Emergency Plan Changes==
Line 312: Line 288:
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.


These activities constitute completion of one sample as defined in Inspection  
These activities constitute completion of one sample as defined in Inspection Procedure 71114.04-05.
 
Procedure 71114.04-05.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1EP6}}
{{a|1EP6}}
==1EP6 Drill Evaluation==
==1EP6 Drill Evaluation==
{{IP sample|IP=IP 71114.06}}
{{IP sample|IP=IP 71114.06}}
Line 329: Line 302:


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
{{IP sample|IP=IP 71151}}
Line 336: Line 308:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed a review of the performance indicator data submitted by the licensee for the second quarter 2013 performance indicators for any obvious inconsistencies prior to its public release in accordance with Inspection Manual Chapter 0608, "Performance Indicator Program."
The inspectors performed a review of the performance indicator data submitted by the licensee for the second quarter 2013 performance indicators for any obvious inconsistencies prior to its public release in accordance with Inspection Manual Chapter 0608, Performance Indicator Program.


This review was performed as part of the inspectors' normal plant status activities and, as such, did not constitute a separate inspection sample.
This review was performed as part of the inspectors normal plant status activities and, as such, did not constitute a separate inspection sample.


====b. Findings====
====b. Findings====
Line 346: Line 318:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the mitigating systems performance index - emergency ac power system performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors reviewed the licensee's operator narrative logs, mitigating systems performanc e index derivation reports, issue reports, event reports, and NRC integrated inspection reports for the period of July 2012 through  
The inspectors sampled licensee submittals for the mitigating systems performance index - emergency ac power system performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, mitigating systems performance index derivation reports, issue reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.
 
June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.


These activities constitute completion of one mitigating systems performance index -
These activities constitute completion of one mitigating systems performance index -
Line 359: Line 329:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the mitigating systems performance index - high pressure injection systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors reviewed the licensee's operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection and, if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.
The inspectors sampled licensee submittals for the mitigating systems performance index - high pressure injection systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection and, if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.


These activities constitute completion of one mitigating systems performance index - high pressure injection system sample, as defined in Inspection Procedure 71151-05.
These activities constitute completion of one mitigating systems performance index -
high pressure injection system sample, as defined in Inspection Procedure 71151-05.


====b. Findings====
====b. Findings====
Line 369: Line 340:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the mitigating systems performance index - cooling water systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors reviewed the licensee's operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013 to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensee's issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.
The inspectors sampled licensee submittals for the mitigating systems performance index - cooling water systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013 to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.


These activities constitute completion of one mitigating systems performance index -
These activities constitute completion of one mitigating systems performance index -
Line 375: Line 346:


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|4OA2}}
{{a|4OA2}}
==4OA2 Problem Identification and Resolution==
==4OA2 Problem Identification and Resolution==
{{IP sample|IP=IP 71152}}
{{IP sample|IP=IP 71152}}
Line 382: Line 352:


====a. Inspection Scope====
====a. Inspection Scope====
As part of the various baseline inspection procedures discussed in previous sections of this report, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that they were being entered into the licensee's corrective action program at an appropriate threshold, that adequate attention was being given to timely corrective actions, and that adverse trends were identified and addressed. The inspectors reviewed attributes that included the complete and accurate identification of the problem; the timely correction, commensurate with the safety significance; the evaluation and disposition of performance issues, generic implications, common causes, contributing factors, root causes, extent of condition reviews, and previous occurrences reviews; and the classification, prioritization, focus, and timeliness of corrective actions. Minor issues entered into the licensee's corrective action program because of the inspectors' observations are included in the attached list of documents reviewed.
As part of the various baseline inspection procedures discussed in previous sections of this report, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that they were being entered into the licensees corrective action program at an appropriate threshold, that adequate attention was being given to timely corrective actions, and that adverse trends were identified and addressed. The inspectors reviewed attributes that included the complete and accurate identification of the problem; the timely correction, commensurate with the safety significance; the evaluation and disposition of performance issues, generic implications, common causes, contributing factors, root causes, extent of condition reviews, and previous occurrences reviews; and the classification, prioritization, focus, and timeliness of corrective actions. Minor issues entered into the licensees corrective action program because of the inspectors observations are included in the attached list of documents reviewed.


These routine reviews for the identification and resolution of problems did not constitute any additional inspection samples. Instead, by procedure, they were considered an integral part of the inspections performed during the quarter and documented in Section 1 of this report.
These routine reviews for the identification and resolution of problems did not constitute any additional inspection samples. Instead, by procedure, they were considered an integral part of the inspections performed during the quarter and documented in Section 1 of this report.
Line 392: Line 362:


====a. Inspection Scope====
====a. Inspection Scope====
In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensee's corrective action program. The inspectors accomplished this through review of the station's daily corrective action documents.
In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensees corrective action program. The inspectors accomplished this through review of the stations daily corrective action documents.


The inspectors performed these daily reviews as part of their daily plant status monitoring activities and, as such, did not constitute any separate inspection samples.
The inspectors performed these daily reviews as part of their daily plant status monitoring activities and, as such, did not constitute any separate inspection samples.
Line 402: Line 372:


====a. Inspection Scope====
====a. Inspection Scope====
Wolf Creek had two operator work-arounds affecting emergency operation of safety-related equipment and four operator burdens which detail work-around delays in normal day-to-day operations. The inspectors audited the operator work-arounds and operator burdens to verify that that no current plant equipment issues were impacting emergency operation of safety related equipment, that the licensee's quantification of the aggregate operator burden was accurate and that the total aggregate burden is not impacting safe operations of the facility. Furthermore, the inspectors performed a more detailed review of the operator work arounds and verified that the licensee has developed a plan to correct the deficiencies causing the operator work-arounds so that normal operation can be restored.
Wolf Creek had two operator work-arounds affecting emergency operation of safety-related equipment and four operator burdens which detail work-around delays in normal day-to-day operations. The inspectors audited the operator work-arounds and operator burdens to verify that that no current plant equipment issues were impacting emergency operation of safety related equipment, that the licensees quantification of the aggregate operator burden was accurate and that the total aggregate burden is not impacting safe operations of the facility. Furthermore, the inspectors performed a more detailed review of the operator work arounds and verified that the licensee has developed a plan to correct the deficiencies causing the operator work-arounds so that normal operation can be restored.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|4OA3}}
{{a|4OA3}}
==4OA3 Follow-up of Events and Notices of Enforcement Discretion==
==4OA3 Follow-up of Events and Notices of Enforcement Discretion==
{{IP sample|IP=IP 71153}}
{{IP sample|IP=IP 71153}}
===.1 (Closed) Licensee Event Report 05000482/2011-002-00 and -01===
===.1 (Closed) Licensee Event Report 05000482/2011-002-00 and -01: Noncompliance with===
: Noncompliance with TS 3.8.1, "AC Sources - Operating" On February 22, 2011, operators declared the "A" diesel generator inoperable due to a control pin on the fuel rack not being installed correctly. The licensee returned the equipment back to service after replacing the control pin, washer, and cotter pin correctly. The inspectors dispositioned this violation of technical specifications as a licensee-identified violation in Section
{{a|4OA7}}
==4OA7 of NRC Integrated Inspection Report==


05000482/2012005. No additional deficiencies were identified during the review of these Licensee Event Reports supplemental revisions.
TS 3.8.1, AC Sources - Operating On February 22, 2011, operators declared the A diesel generator inoperable due to a control pin on the fuel rack not being installed correctly. The licensee returned the equipment back to service after replacing the control pin, washer, and cotter pin correctly. The inspectors dispositioned this violation of technical specifications as a licensee-identified violation in Section 4OA7 of NRC Integrated Inspection Report 05000482/2012005. No additional deficiencies were identified during the review of these Licensee Event Reports supplemental revisions.


This Licensee Event Report is closed.
This Licensee Event Report is closed.


===.2 (Closed) Licensee Event Report 05000482/2013-004-00: Technical Specification Limiting Condition for Operation 3.0.3 Requiring Plant Shutdown===
===.2 (Closed) Licensee Event Report 05000482/2013-004-00: Technical Specification Limiting===


During Refueling Outage 19, the licensee was replacing the air conditioning unit SGK05A Class 1E electrical equipment air conditioning compressor. When the first mounting screw was being torqued to the 50 inch-pounds as required by the maintenance work instructions, it snapped off. The licensee determined that this torque value was too high. An extent of condition review revealed that over-torquing of fasteners on SGK04B and SGK05B had also occurred during their respective maintenance activities performed on August 12, 2011, and May 30, 2012. This is a violation of the following technical specifications because two trains of Class 1E electrical equipment for air conditioning were not functional in Modes one through four at the same time:
Condition for Operation 3.0.3 Requiring Plant Shutdown During Refueling Outage 19, the licensee was replacing the air conditioning unit SGK05A Class 1E electrical equipment air conditioning compressor. When the first mounting screw was being torqued to the 50 inch-pounds as required by the maintenance work instructions, it snapped off. The licensee determined that this torque value was too high. An extent of condition review revealed that over-torquing of fasteners on SGK04B and SGK05B had also occurred during their respective maintenance activities performed on August 12, 2011, and May 30, 2012. This is a violation of the following technical specifications because two trains of Class 1E electrical equipment for air conditioning were not functional in Modes one through four at the same time:
* Technical Specification 3.8.4, "DC Sources - Operating"
* Technical Specification 3.8.4, DC Sources - Operating
* Technical Specification 3.8.7, "Inverters - Operating"
* Technical Specification 3.8.7, Inverters - Operating
* Technical Specification 3.8.9, "Distribution Systems - Operating"
* Technical Specification 3.8.9, Distribution Systems - Operating
* Technical Specification 3.7.11, "Control Room Air Conditioning System"
* Technical Specification 3.7.11, Control Room Air Conditioning System
* Limiting Condition for Operation 3.0.3, The licensee determined that over torqued mounting screws could render the equipment inoperable, and unable to function during a seismic event.
* Limiting Condition for Operation 3.0.3, The licensee determined that over torqued mounting screws could render the equipment inoperable, and unable to function during a seismic event.


Corrective actions included properly replacing mounting screws, and revising Procedure AI 16C-007, "Work Order Planning," to require a copy of the reference source document for any work instruction that includes torquing data for an installed safety  
Corrective actions included properly replacing mounting screws, and revising Procedure AI 16C-007, Work Order Planning, to require a copy of the reference source document for any work instruction that includes torquing data for an installed safety system or component.
 
system or component.


Since the mounting screws on Train B had not failed and are only required to prevent failure in a seismic event, of which probability is low, safety significance of this condition is low. Additionally, the room temperatures, which are controlled by operating air conditioning equipment, remained below area limits for qualification of electrical equipment.
Since the mounting screws on Train B had not failed and are only required to prevent failure in a seismic event, of which probability is low, safety significance of this condition is low. Additionally, the room temperatures, which are controlled by operating air conditioning equipment, remained below area limits for qualification of electrical equipment.
Line 438: Line 402:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit Exit Meeting Summary==
==4OA6 Meetings, Including Exit==
 
===Exit Meeting Summary===


On October 8, 2013, the resident inspectors presented the inspection results to Mr. M. Sunseri, President and Chief Executive Officer, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
On October 8, 2013, the resident inspectors presented the inspection results to Mr. M. Sunseri, President and Chief Executive Officer, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.


{{a|4OA7}}
{{a|4OA7}}
==4OA7 Licensee-Identified Violations The following violations of very low safety signi==
==4OA7 Licensee-Identified Violations==


ficance (Green) were identified by the licensee and are violations of NRC requirements which meet the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violations.
The following violations of very low safety significance (Green) were identified by the licensee and are violations of NRC requirements which meet the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violations.


===.1 Technical Specification (TS) 3.8.4, "DC Sources - Operating," requires two operable trains of DC sources while in Modes 1 through 4.===
===.1 Technical Specification (TS) 3.8.4, DC Sources - Operating, requires two operable===
TS 3.8.7, "Inverters - Operating,"
requires two operable trains of inverters while in Modes 1 through 4. Technical Specification 3.8.9, "Distribution Systems
- Operating," requires the Train A and Train B subsystems of the DC and AC vital bus systems be operable in Modes 1 through 4. Technical Specifications 3.7.11, "Control Room Air Conditioning System," requires two trains of Control Room Air Conditioning be operable in Modes 1 through 6. Technical Specification Limiting Condition for Operation (LCO) 3.0.3 requires, in part, that when an LCO is not met and the associated actions are not met or an action is not provided, the unit shall be placed in a Mode in which the LCO is not applicable, or take action within one hour to place the plant in Mode 3 within the next 7 hours, Mode 4 within the next 13 hours, and Mode 5 within 37 hours.


Contrary to the above, two trains of Class 1E electrical equipment air conditioning were not functional in Modes 1 through 4, but the licensee did not take action within one hour to place the plant in Mode 3 within the next 7 hours, Mode 4 within the next 13 hours, and Mode 5 within 37 hours. Specifically , the licensee over-torqued mounting screws on air conditioning units SGK04B and SGK05B during their respective maintenance activities performed on August 12, 2011, and May 30, 2012, rendering these air conditioning units and their supported systems inoperable. The licensee failed to restore air conditioning units SGK04B and SGK05B to operable status until March 22 and March 23, 2013; and thus exceeded the allowed action times of the respective Technical Specifications. Using Inspection Manual Chapter 0609, Appendix A, Exhibit 2, the inspectors performed a significance determination screening and determined that a more detailed risk evaluation was required because the finding potentially represented an actual loss of safety function for a single train for greater than the technical specification allowed outage time. The Senior Reactor Analyst determined that since the mounting screws did not actually fail, and their function is to prevent failure during a seismic event, and because of the low probability of a seismic event leading to core
trains of DC sources while in Modes 1 through 4. TS 3.8.7, Inverters - Operating, requires two operable trains of inverters while in Modes 1 through 4. Technical Specification 3.8.9, Distribution Systems - Operating, requires the Train A and Train B subsystems of the DC and AC vital bus systems be operable in Modes 1 through 4.


damage or early release, this violation is of very low safety significance (Green). This violation was entered into the licensee's corrective action program as Condition
Technical Specifications 3.7.11, Control Room Air Conditioning System, requires two trains of Control Room Air Conditioning be operable in Modes 1 through 6. Technical Specification Limiting Condition for Operation (LCO) 3.0.3 requires, in part, that when an LCO is not met and the associated actions are not met or an action is not provided, the unit shall be placed in a Mode in which the LCO is not applicable, or take action within one hour to place the plant in Mode 3 within the next 7 hours, Mode 4 within the next 13 hours, and Mode 5 within 37 hours.


Report 65421.
Contrary to the above, two trains of Class 1E electrical equipment air conditioning were not functional in Modes 1 through 4, but the licensee did not take action within one hour to place the plant in Mode 3 within the next 7 hours, Mode 4 within the next 13 hours, and Mode 5 within 37 hours. Specifically, the licensee over-torqued mounting screws on air conditioning units SGK04B and SGK05B during their respective maintenance activities performed on August 12, 2011, and May 30, 2012, rendering these air conditioning units and their supported systems inoperable. The licensee failed to restore air conditioning units SGK04B and SGK05B to operable status until March 22 and March 23, 2013; and thus exceeded the allowed action times of the respective Technical Specifications. Using Inspection Manual Chapter 0609, Appendix A, Exhibit 2, the inspectors performed a significance determination screening and determined that a more detailed risk evaluation was required because the finding potentially represented an actual loss of safety function for a single train for greater than the technical specification allowed outage time. The Senior Reactor Analyst determined that since the mounting screws did not actually fail, and their function is to prevent failure during a seismic event, and because of the low probability of a seismic event leading to core damage or early release, this violation is of very low safety significance (Green). This violation was entered into the licensees corrective action program as Condition Report 65421.


===.2 Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," states, in part, that activities affecting quality===
===.2 Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion V,===


shall be prescribed by procedures appropriate to the circumstances. Contrary to the above, a procedure for an activity affecting quality was not appropriate to the circumstances. Specifically, as of May 6, 2013, Procedure MPE GK-004 "GK Unit Preparation for Work," Revision 4, was inadequate to prevent over-tightening of the wing screws on the filter dryer assembly, in that the procedure did not specify how tight to leave the wing screws. This led to failure of the filter drier, pieces of which blocked the thermostatic expansion valves and overheated the Class 1E electrical equipment air conditioning chiller. Using Inspection Manual Chapter 609, Appendix A, Exhibit 2, Mitigating Systems Cornerstone screening questions, Section A, the finding was determined to be of very low safety significance (Green) because only one train of Class 1E electrical equipment was affected and room temperatures remained below maximum limits. This violation was entered into the licensee's corrective action program as Condition Report 68818.
Instructions, Procedures, and Drawings, states, in part, that activities affecting quality shall be prescribed by procedures appropriate to the circumstances. Contrary to the above, a procedure for an activity affecting quality was not appropriate to the circumstances. Specifically, as of May 6, 2013, Procedure MPE GK-004 GK Unit Preparation for Work, Revision 4, was inadequate to prevent over-tightening of the wing screws on the filter dryer assembly, in that the procedure did not specify how tight to leave the wing screws. This led to failure of the filter drier, pieces of which blocked the thermostatic expansion valves and overheated the Class 1E electrical equipment air conditioning chiller. Using Inspection Manual Chapter 609, Appendix A, Exhibit 2, Mitigating Systems Cornerstone screening questions, Section A, the finding was determined to be of very low safety significance (Green) because only one train of Class 1E electrical equipment was affected and room temperatures remained below maximum limits. This violation was entered into the licensees corrective action program as Condition Report 68818.
 
A-1 Attachment


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=
Line 469: Line 430:


===Licensee Personnel===
===Licensee Personnel===
: [[contact::T. Baban]], Manager Systems Engineering  
: [[contact::T. Baban]], Manager Systems Engineering
: [[contact::P. Bedgood]], Manager, Radiation Protection  
: [[contact::P. Bedgood]], Manager, Radiation Protection
: [[contact::M. Brinkmeyer]], Fire Protection Technician  
: [[contact::M. Brinkmeyer]], Fire Protection Technician
: [[contact::J. Broschak]], Engineering VP  
: [[contact::J. Broschak]], Engineering VP
: [[contact::A. Camp]], Plant Manager  
: [[contact::A. Camp]], Plant Manager
: [[contact::R. Clemens]], Strategic Projects VP  
: [[contact::R. Clemens]], Strategic Projects VP
: [[contact::D. Erbe]], Manager Security  
: [[contact::D. Erbe]], Manager Security
: [[contact::S. Henry]], Manager Operations  
: [[contact::S. Henry]], Manager Operations
: [[contact::R. Hobby]], Licensing Engineer  
: [[contact::R. Hobby]], Licensing Engineer
: [[contact::M. McMullen]], Design Engineer  
: [[contact::M. McMullen]], Design Engineer
: [[contact::W. Muilenburg]], Supervisor Licensing  
: [[contact::W. Muilenburg]], Supervisor Licensing
: [[contact::L. Ratzlaff]], Manager Maintenance  
: [[contact::L. Ratzlaff]], Manager Maintenance
: [[contact::T. Slenker]], Operations CAPCO  
: [[contact::T. Slenker]], Operations CAPCO
: [[contact::R. Smith]], Site Vice President  
: [[contact::R. Smith]], Site Vice President
: [[contact::M. Sunseri]], President and CEO  
: [[contact::M. Sunseri]], President and CEO
: [[contact::M. Westman]], Manager Regulatory Affairs  
: [[contact::M. Westman]], Manager Regulatory Affairs
: [[contact::S. Wideman]], Licensing Engineer  
: [[contact::S. Wideman]], Licensing Engineer
: [[contact::J. Yunk]], Manager Corrective Actions
: [[contact::J. Yunk]], Manager Corrective Actions


Line 491: Line 452:


===Opened and Closed===
===Opened and Closed===
: 05000482/2013004-
: 05000482/2013004- NCV         Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading. (Section 1R05.1)
NCV "Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading." (Section 1R05.1)  


===Closed===
===Closed===
: 05000482/2011-
: 05000482/2011-       LER     Noncompliance with TS 3.8.1, AC Sources - Operating 2-00 and -01                (Section 4OA3.1)
: 2-00 and -01
: 05000482/2013-       LER     Technical Specification Limiting Condition for Operation 3.0.3 004-00                        Requiring Plant Shutdown (Section 4OA3.2)
: LER Noncompliance with TS 3.8.1, "AC Sources - Operating" (Section 4OA3.1)  
Attachment
: 05000482/2013-
: 004-00 LER Technical Specification Limiting Condition for Operation 3.0.3 Requiring Plant Shutdown (Section 4OA3.2)  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1R04: Equipment Alignment==
: PROCEDURES
: NUMBER TITLE REVISION
: CKL
: EM-120 Safety Injection System Lineup Checklist 26
: AI 03A-001 Fuse Verification and Control 1
: E-11NK02 Class
: IE 125V DC System Meter & Relay Diagram 8
: WCRE-08 WCGS Fuse List 14 DRAWINGS
: NUMBER TITLE REVISION M-12EM01
: Piping and Instrumentation Diagram High Pressure Coolant Injection System
: E-13NN01 Class IE Instrument AC Schematic 4 WORK ORDERS
: 10-325053-000 10-325050-000 
: MISCELLANEOUS
: NUMBER TITLE DATE 92-054
: Quality Control Surveillance Report, Verification of Installed Fuses June 2, 1992
: NUREG-1760 Aging Assessment of Safety-Related Fuses Used in Low and Medium Voltage Applications in Nuclear Power
: Plants May 2002
==Section 1R05: Fire Protection==
: PROCEDURE NUMBER TITLE REVISION
: AP 10-100 Fire Protection Program 17
: AP 10-106 Fire Preplans 13
: AP 10-103 Fire Protection Impairment Control 27
: E-1F9905 Fire Hazard Analysis 4
==Section 1R06: Flood Protection Measures==
: PROCEDURES
: NUMBER TITLE REVISION
: AI 14-001 Confined Space Entry 15 OFN
: SG-003 Natural Events 26
: ALR 00-097A Condensate Pit Lev Hi 5
: CALCULATIONS
: KC-M-007 Maximum Fire Protection Water Flow For Postulated Pipe Breaks 0 CONDITION REPORTS
: 27904 58756
==Section 1R13: Maintenance Risk Assessment and Emergent Work Controls==
: PROCEDURES
: NUMBER TITLE REVISION
: AP 22C-003 Online Nuclear Safety and Generation Risk Assessment 20
: MISCELLANEOUS
: NUMBER TITLE DATE
: Operations Control Room Logs Work Week Manager Logs 
: NUMARC 93-01 Section 11 Assessment of Risk Resulting from Performance of Maintenance Activities February 11, 2000
: PLANT RISK ASSESSMENT
: NUMBER TITLE REVISION 13-305 Weekly Plant Risk Assessment 0 13-309 Weekly Plant Risk Assessment 0 13-309 Weekly Plant Risk Assessment 1
: 13-309 Weekly Plant Risk Assessment 2
: 13-310 Weekly Plant Risk Assessment 1
: 13-311 Weekly Plant Risk Assessment 0
: 13-311 Weekly Plant Risk Assessment 1
==Section 1R13: Maintenance Risk Assessment and Emergent Work Controls==
: CONDITION REPORTS
: 73624
: WORK ORDERS
: 13-375796-000 13-375796-002
==Section 1R15: Operability Evaluations==
: OPERABILITY EVALUATIONS (PROMPT)
: NUMBER TITLE REVISION OE
: HB 13-005 Reactor Coolant Drain Tank Containment Isolation Valves 0 OE
: GN-13-006 Containment Temperature Indications 0 DRAWINGS NUMBER TITLE REVISION M-12HB01 Piping and Instrumentation Diagram Liquid Radwaste System 14 8001933-1 Turbine Control Shaft E M-12FC02 Piping & Instrumentation Diagram Auxiliary Turbines Auxiliary Feedwater Pump Turbine
: CONDITION REPORTS
: 2347 72745 73118 73624
: WORK ORDERS
: 13-375796-000 13-375796-002   
: MISCELLANIOUS
: NUMBER TITLE REVISION
: DCP 012958 Turbine Driven Auxiliary Feedwater Pump Control Modification 11 Engineering Disposition PAL02/KFC02 Alarm 00-129C September 5, 2013 0
==Section 1R19: Post-Maintenance Testing==
: PROCEDURES
: NUMBER TITLE REVISION INC
: C-1006 Calibration of Converters 4A INC
: C-1003 Calibration of Transmitters 8B
: STS
: IC-708 Steam Line Pressure Transmitter Response Time Test -
: Protection Set
: II 11 CONDITION REPORT
: 2966
: WORK ORDERS
: 12-355815-000 12-355815-001
: 12-355823-000 12-355815-002 12-355823-001
: 2-355815-003 12-355823-002 12-355815-004 12-355823-003 13-375373-002
: 13-375373-001 13-375359-002   
: MISCELLANEOUS
: NUMBER TITLE REVISION Engineering Disposition PEG01A Casing and Impeller Work 0
==Section 1R22: Surveillance Testing==
: PROCEDURES
: NUMBER TITLE REVISION
: STS
: PE-015 Containment Purge Valve Leakage Test 20
: STS
: SF-001 Control and Shutdown Rod Operability Verification 26 CONDITION REPORT
: 71515
==Section 1EP4: Emergency Action Level and Emergency Plan Changes==
: PROCEDURE NUMBER TITLE REVISION
: Radiological Emergency Response Plan 14


==Section 1EP6: Drill Evaluation==
: MISCELLANEOUS
: NUMBER TITLE DATE 13-SA-01 Wolf Creek Emergency Planning Drill July 11, 2013 13-PRE-01 Wolf Creek Emergency Planning Drill August 20, 2013
}}
}}

Latest revision as of 13:59, 20 December 2019

IR 05000482-13-004; 07/01/2013 - 09/28/2013; Wolf Creek Generating Station, Integrated Resident and Regional Report; Fire Protection
ML13318B072
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/14/2013
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Matthew Sunseri
Wolf Creek
References
IR-13-004
Download: ML13318B072 (32)


Text

UNITED STATE S NUC LEAR REGULATOR Y C OMMI SSI ON ber 14, 2013

SUBJECT:

WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2013004

Dear Mr. Sunseri:

On September 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. On October 8, 2013, the NRC inspectors discussed the results of this inspection with Mr. M. Sunseri, President and Chief Executive Officer, and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. Further, inspectors documented licensee-identified violations which were determined `to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the non-cited violations or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Wolf Creek Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Wolf Creek Generating Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ David L. Proulx for Neil O'Keefe, Chief Project Branch B Division of Reactor Projects Docket Nos.: 50-482 License Nos: NPF-42

Enclosure:

Inspection Report 05000482/2013004 w/ Attachment: Supplemental Information

REGION IV==

Docket: 05000482 License: NPF 42 Report: 05000482/2013004 Licensee: Wolf Creek Nuclear Operating Corporation Facility: Wolf Creek Generating Station Location: 1550 Oxen Lane NE, Burlington, Kansas Dates: July 1 through September 28, 2013 Inspectors: C. Peabody, Senior Resident Inspector C. Hunt, Acting Resident Inspector R. Stroble, Resident Inspector J. Laughlin, Emergency Preparedness Inspector, NSIR M. Williams, Reactor Inspector Approved By: Neil O'Keefe, Chief, Project Branch B Division of Reactor Projects-1- Enclosure

SUMMARY OF FINDINGS

IR 05000482/2013004; 07/01 - 09/28/2013; WOLF CREEK GENERATING STATION,

Integrated Resident and Regional Report; Fire Protection.

The report covered a 3-month period of inspection by resident inspectors and a region-based inspector. One Green non-cited violation of very low safety significance was identified. The significance of most findings is indicated by their color (Green, White, Yellow, or Red) using Inspection Manual Chapter 0609, Significance Determination Process. The cross-cutting aspect is determined using Inspection Manual Chapter 0310, Components Within the Cross-Cutting Areas. Findings for which the significance determination process does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

NRC-Identified Findings and Self-Revealing Findings

Cornerstone: Initiating Events

Green.

The inspectors identified a non-cited violation of Technical Specification 5.4.1.d, Fire Protection Program Procedures, for the failure to analyze scaffolding for fire protection impairments and transient combustible loading. The cause of the finding was a procedure change that allowed for a grace period of one working day to complete a fire protection review of newly erected scaffolding. As a result, there was no longer a direct interface with the scaffold builders and fire protection engineers, which complicated scoping and tracking the required inspections. This violation was entered into the corrective action program as Condition Report 71910.

Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, Significance Determination for Findings at Power, which required screening using MC 0609, Appendix F, Fire Protection Significance Determination Process. Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not affect the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established. H.3(a)(Section 1R05.1.b)

Licensee-Identified Violations

Violations of very low safety significance or Severity Level IV that were identified by the licensee have been reviewed by the inspectors. Corrective actions taken or planned by the licensee have been entered into the licensees corrective action program. These violations and associated corrective action tracking numbers are listed in Section 4OA7 of this report.

PLANT STATUS

Wolf Creek began the inspection period at 100 percent power. On September 11, 2013, Wolf Creek performed a technical specification-required shutdown due to a non-functional Class 1E air conditioning unit. Wolf Creek remained offline for the remainder of the inspection period.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection

.1 Readiness for Impending Adverse Weather Conditions

a. Inspection Scope

Since thunderstorms with potential tornados and high winds were forecast in the vicinity of the facility for September 19, 2013, the inspectors reviewed the plant personnels overall preparations and protection for the expected weather conditions. On September 19, 2013, the inspectors walked down the offsite power transformers, diesel generators, and Class 1E distribution systems because their safety-related functions could be affected or required as a result of high winds, tornado-generated missiles, or the loss of offsite power. The inspectors evaluated the plant staffs preparations against the sites procedures and determined that the staffs actions were adequate. During the inspection, the inspectors focused on plant design features and the licensees procedures to respond to tornados and high winds. The inspectors also toured the plant grounds to look for any loose debris that could become missiles during a tornado. The inspectors evaluated operator staffing and accessibility of controls and indications for those systems required to control the plant. Additionally, the inspectors reviewed the Updated Safety Analysis Report (USAR) and performance requirements for the systems selected for inspection and verified that operator actions were appropriate as specified by plant-specific procedures. The inspectors also reviewed a sample of corrective action program items to verify that the licensee had identified adverse weather issues at an appropriate threshold and entered them into the corrective action program for resolution.

These activities constitute completion of one sample of readiness for impending adverse weather conditions, as defined in Inspection Procedure 71111.01-05.

b. Findings

No findings were identified.

1R04 Equipment Alignment

.1 Partial Walkdown

a. Inspection Scope

The inspectors performed partial system walkdowns of the following risk-significant systems:

  • August 9, 2013, train A 120Vac Class 1E instrument power distribution
  • August 14, 2013, train B 125Vdc Class 1E power distribution The inspectors selected these systems based on their risk significance relative to the reactor safety cornerstones at the time they were inspected, while considering out of service time, inoperable or degraded conditions, recent system outages, and maintenance, modification, and testing. The inspectors attempted to identify any discrepancies that could affect the function of the system, and, therefore, potentially increase risk. The inspectors reviewed applicable operating procedures, system diagrams, USAR, technical specification requirements, administrative technical specifications, outstanding work orders, condition reports, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have rendered the systems incapable of performing their intended functions. The inspectors also inspected accessible portions of the systems to verify system components and support equipment were aligned correctly and operable. The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no obvious deficiencies. The inspectors also verified that the licensee had properly identified and resolved equipment alignment problems that could cause initiating events or impact the capability of mitigating systems or barriers and entered them into the corrective action program with the appropriate significance characterization. Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of three partial system walkdown samples as defined in Inspection Procedure 71111.04-05.

b. Findings

No findings were identified.

1R05 Fire Protection

.1 Quarterly Fire Inspection Tours

a. Inspection Scope

The inspectors conducted fire protection walkdowns that were focused on availability, accessibility, and the condition of firefighting equipment in the following risk-significant plant areas:

  • July 2, 2013, essential service water pipe chase, southeast stairway to auxiliary building, and duct chase, fire areas C-1, C-2, and C-3.
  • September 24, 2013, fire zone 16C, battery and switchgear room (2016 floor)

The inspectors reviewed areas to assess if licensee personnel had implemented a fire protection program that adequately controlled combustibles and ignition sources within the plant; effectively maintained fire detection and suppression capability; maintained passive fire protection features in good material condition; and had implemented adequate compensatory measures for out of service, degraded or inoperable fire protection equipment, systems, or features, in accordance with the licensees fire plan.

The inspectors selected fire areas based on their overall contribution to internal fire risk as documented in the plants Individual Plant Examination of External Events with later additional insights, their potential to affect equipment that could initiate or mitigate a plant transient, or their impact on the plants ability to respond to a security event. Using the documents listed in the attachment, the inspectors verified that fire hoses and extinguishers were in their designated locations and available for immediate use; that fire detectors and sprinklers were unobstructed; that transient material loading was within the analyzed limits; and fire doors, dampers, and penetration seals appeared to be in satisfactory condition and verified that adequate compensatory measures were put in place by the licensee for out of service, degraded, or inoperable fire protection equipment systems or features. The inspectors also verified that minor issues identified during the inspection were entered into the licensees corrective action program.

Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of four quarterly fire-protection inspection samples, as defined in Inspection Procedure 71111.05-05.

b. Findings

Introduction.

The inspectors identified a Green non-cited violation (NCV) of Technical Specification 5.4.1.d, Fire Protection Program Procedures, for the failure to analyze erected scaffolding for fire protection equipment impairments and transient combustible loading.

Description.

On July 24, 2013, the inspectors performed a fire protection quarterly inspection in both the east and west diesel generator rooms using the Wolf Creek Fire Hazard Analysis procedure E-1F9905, Rev 4. According to the Fire Hazard Analysis, both of the diesel generator rooms were equipped with an automatic pre-action sprinkler system. Wolf Creek procedure AP-10-106, Fire Preplans, Attachment B, also indicated that the sprinkler system provides suppression coverage for the entire diesel generator room in which it is located. While performing the inspection, the inspectors identified two scaffolds, scaffold 13-S134 in the west diesel generator room and 13-S100 in the east diesel generator room, that were directly beneath two sprinkler heads toward the north end of each respective room. The inspectors observed that no fire impairment permits were completed for the two scaffolds in question and then conferred with the work control senior reactor operator (SRO) to determine the applicable guidance for scaffolding built in the vicinity of fire protection systems. The work control SRO directed the inspector to AP-14A-003, Scaffold Construction and Use.

Section 6.4.33.5 of AP-14A-003 specifies that, scaffolding located in a fire protection sprinkler protected area is required to have a fire protection review if the scaffold deck length or width is 48 inches or greater, or the scaffold deck is within 36 inches of a fire protection sprinkler head. This review is required to determine the impact on the fire protection system itself as well as any administrative fire protection controls that may also be affected. The inspectors noted that the fire protection impact review tag described in attachment D of AP-14A-003 was attached to each scaffold and both tags indicated that a fire protection review was required based on a Yes response to question five, Scaffold >48 wide and constructed in a sprinkler area, or within 36 of a sprinkler head. In addition to question five indicating the need for a fire protection review, the fire protection impact review tag for scaffold 13-S134 also required a fire protection review based on a Yes response for question four, In safety-related areas, do cumulative scaffold combustibles within a 20 feet horizontal radius exceed 200 pounds?.

Both fire protection impact review tags indicated that fire protection was notified based on a Yes response to question seven, Fire protection notified?. Although the constructor or evaluator signature block was signed on both tags and dated May 10, 2013, and July 18, 2013, for 13-S100 and 13-S134, respectively, the inspectors noted that the signature block for the fire protection review on both tags was blank.

The inspectors immediately discussed these observations with the work control SRO and a fire protection representative. When the inspectors informed the fire protection representative of the dates on the tags and the absence of a fire protection signature, the fire protection representative immediately proceeded to both scaffolds to perform the required assessment.

Upon completing his review, the fire protection representative concluded that one hour compensatory fire watches were required in accordance with AP-10-103, Fire Protection Impairment Control, Appendix D, Section D.1.3, for both scaffolds.

Additionally, scaffold 13-S134 required a one hour compensatory watch for cumulative combustible material exceeding 200 pounds in accordance with AP-10-102, Control of Combustible Material, Section 6.2.2.2 and 6.4.2.1. Condition Report 71910 was written in response to this issue.

The inspectors discussed the apparent cause evaluation associated with Condition Report 71910 with the evaluators. The licensee indicated that the cause of the event was due to an administrative procedure change in 2008 which allowed for a grace period of one working day to conduct a fire protection review. Specifically, this no longer required a direct interface with the scaffold builders which complicated scoping and tracking the required inspections. The procedure was corrected to require the fire protection inspection immediately upon erection of scaffolding as corrective action.

Analysis.

Failure to analyze scaffolding for fire impairment and transient combustible loading is a performance deficiency. The performance deficiency is more than minor because it affects the protection against external factors attribute of the Initiating Events Cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using Inspection Manual Chapter 0609, Appendix A, Significance Determination for Findings at Power, which required screening using MC 0609, Appendix F, Fire Protection Significance Determination Process. Using screening question 1.3.1 of this Appendix, the inspectors determined that the finding was of very low safety significance (Green) because the finding did not impact the ability to achieve and maintain safe shutdown. The inspectors determined that this finding had a cross-cutting aspect in the human performance area of work control because the licensee failed to appropriately coordinate work activities by incorporating the need for planned compensatory actions. Specifically, Wolf Creek did not ensure that a fire protection assessment of scaffold 13-S100 and 13-S134 was performed in a timely manner which resulted in compensatory measures for the impaired sprinkler heads and transient combustible material not being established H.3(a).

Enforcement.

Wolf Creek Technical Specification 5.4.1.d requires that written procedures be established, implemented, and maintained covering fire protection program implementation. These procedures include AP-10-102, Control of Combustible Material, AP-10-103, Fire Protection Impairment Control, and AP-14A-003, Scaffold Construction and Use.

Procedure AP-14A-003, Scaffold Construction and Use, Revision 20, required that scaffolding located in a fire protection sprinkler protected area having a scaffold deck length or width greater than 48, or having a scaffold deck within 36 of a fire protection sprinkler head, be reviewed by fire protection to assess its impact on fire protection systems and/or fire protection administrative control. Contrary to the above, from May 10, 2013, to July 24, 2013, not parallel scaffold 13-S100 in the east diesel generator room and from July 18, 2013, to July 24, 2013, scaffold 13-S134 in the west diesel generator room, did not receive a fire protection assessment.

Procedure AP-10-103, Fire Protection Impairment Control, Revision 27, required that any spray and/or sprinkler system that is non-functional, other than in the reactor containment, not in an area containing redundant equipment, shall have an established hourly fire watch to patrol the affected area. Contrary to the above, from May 10, 2013, to July 24, 2013, scaffold 13-S100 in the east diesel generator room, and from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the west diesel generator room, did not receive hourly fire watches.

Procedure AP-10-102, Control of Combustible Material, Revision 17, required a transient combustible materials permit for transient combustible scaffold materials if the scaffold is constructed in a safety-related area, and the cumulative amount of combustible scaffold material within a 20 foot horizontal radius of the scaffold location exceeds two hundred pounds. Contrary to the above, from July 18, 2013, to July 24, 2013, not parallel scaffold 13-S134 in the safety-relate west diesel generator room was within 20 feet of more than 200 cumulative pounds of combustible scaffolding material, but did not have an associated transient combustible material permit completed and hourly compensatory watches were not established for the affected area.

This violation is being treated as an NCV, consistent with Section 2.3.2.a of the Enforcement Policy. The violation was entered into the licensees corrective action program as Condition Report 71910. (NCV 05000482/2013004-01, Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading.)

1R06 Flood Protection Measures

a. Inspection Scope

The inspectors reviewed the USAR, the flooding analysis, and plant procedures to assess susceptibilities involving internal flooding; reviewed the corrective action program to determine if licensee personnel identified and corrected flooding problems; inspected underground bunkers/manholes to verify the adequacy of sump pumps, level alarm circuits, cable splices subject to submergence, and drainage for bunkers/manholes; and verified that operator actions for coping with flooding can reasonably achieve the desired outcomes. The inspectors also inspected the areas listed below to verify the adequacy of equipment seals located below the flood line, floor and wall penetration seals, watertight door seals, common drain lines and sumps, sump pumps, level alarms, and control circuits, and temporary or removable flood barriers. Specific documents reviewed during this inspection are listed in the attachment.

  • August 1, 2013, essential service water cable vault 5A (bunker/manhole)
  • August 5, 2013, essential service water cable vault 1B (bunker/manhole)
  • September 25, 2013, turbine building condensate pit, and pathways from the overflow of the pit during a postulated circulating water system pipe rupture to outside building and protection of overflow into safety-related spaces (flood protection walkdown)
  • September 25, 2013, control room alarm panels for hi level alarms in condensate pit, and operator procedures for compensatory actions for securing circulating water pumps during postulated internal flooding from circulating water system pipe rupture (flood protection walkdown)

These activities constitute completion of two flood protection measures inspection sample and two bunker/manhole samples, as defined in Inspection Procedure 71111.06-05

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program and Licensed Operator Performance

.1 Quarterly Review of Licensed Operator Requalification Program

a. Inspection Scope

On September 11, 2013, the inspectors observed a crew of licensed operators in the plants simulator during requalification testing. The inspectors assessed the following areas:

  • Licensed operator performance
  • The ability of the licensee to administer the evaluations
  • The modeling and performance of the control room simulator
  • The quality of post-scenario critiques
  • Follow-up actions taken by the licensee for identified discrepancies These activities constitute completion of one quarterly licensed operator requalification program samples, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

.2 Quarterly Observation of Licensed Operator Performance

a. Inspection Scope

On August 7, 2013, the inspectors observed the performance of on-shift licensed operators in the plants main control room. At the time of the observations, the plant was in a period of heightened activity due to restoring non-safety electrical power following a lightning strike. This activity also occurred during essential service water and emergency diesel generator planned maintenance outages. The inspectors observed the operators performance of the following activities:

  • Shift Turnover and Reactivity Briefs
  • 13kV and 4kV Non-Class 1E Power Distribution Switching
  • Chemical and Volume Control System routine boron dilutions to maintain power In addition, the inspectors assessed the operators adherence to plant procedures, including AP 21-001, Conduct of Operations, and other operations department policies.

These activities constitute completion of one quarterly licensed-operator performance samples, as defined in Inspection Procedure 71111.11.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed licensee personnel's evaluation and management of plant risk for the maintenance and emergent work activities affecting risk-significant and safety-related equipment listed below to verify that the appropriate risk assessments were performed prior to removing equipment for work:

  • July 29, 2013 - August 5, 2013, weekly risk assessment
  • August 26, 2013, emergent work - voids found in train A component cooling water system following pump maintenance
  • September 5, 2013, emergent work - turbine driven auxiliary feedwater pump positioner fault during trip throttle valve testing
  • September 11, 2013, emergent work - Class 1E air conditioning unit failure The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that licensee personnel performed risk assessments as required by 10 CFR 50.65(a)(4)and that the assessments were accurate and complete. When licensee personnel performed emergent work, the inspectors verified that the licensee personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work, discussed the results of the assessment with the licensee's probabilistic risk analyst or shift technical advisor, and verified plant conditions were consistent with the risk assessment. The inspectors also reviewed the technical specification requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met. Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of four maintenance risk assessments and emergent work control inspection samples, as defined in Inspection Procedure 71111.13-05.

b. Findings

No findings were identified.

1R15 Operability Evaluations and Functionality Assessments

a. Inspection Scope

The inspectors reviewed the following assessments:

  • August 22, 2013, containment temperature indications instrument uncertainty
  • September 7, 2013, restoration of turbine-driven auxiliary feedwater pump following configuration change package to jumper out of governor valve motor thermal overload signal
  • September 11, 2013, power block buildings seismic qualification The inspectors selected these operability and functionality assessments based on the risk significance of the associated components and systems along with other factors, such as engineering analysis and judgment, operating experience, and performance history. The inspectors evaluated the technical adequacy of the evaluations to ensure technical specification operability was properly justified and to verify the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the technical specifications and USAR to the licensees evaluations to determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sampling of corrective action documents to verify that the licensee was identifying and correcting any deficiencies associated with operability evaluations. Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of five operability evaluations inspection samples, as defined in Inspection Procedure 71111.15-05.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed the following post-maintenance activities to verify that procedures and test activities were adequate to ensure system operability and functional capability:

  • August 22, 2013, component cooling water pump A casing ultrasonic tests
  • August 29, 2013, steam generator feedwater bypass flow control valve I/P converter replacements The inspectors selected these activities based upon the structure, system, or component's ability to affect risk. The inspectors evaluated these activities for the following (as applicable):
  • The effect of testing on the plant had been adequately addressed; testing was adequate for the maintenance performed
  • Acceptance criteria were clear and demonstrated operational readiness; test instrumentation was appropriate The inspectors evaluated the activities against the technical specifications, the USAR, 10 CFR Part 50 requirements, licensee procedures, and various NRC generic communications to ensure that the test results adequately ensured that the equipment met the licensing basis and design requirements. In addition, the inspectors reviewed corrective action documents associated with post-maintenance tests to determine whether the licensee was identifying problems and entering them in the corrective action program and that the problems were being corrected commensurate with their importance to safety. Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of three post-maintenance testing inspection samples, as defined in Inspection Procedure 71111.19-05.

b. Findings

No findings were identified.

1R20 Refueling and Other Outage Activities

a. Inspection Scope

During the unplanned outage that started on September 11, 2013, the inspectors observed portions of the shutdown and cooldown processes and monitored licensee controls over the outage activities listed below.

  • Configuration management, including maintenance of defense in depth, is commensurate with the outage safety plan for key safety functions and compliance with the applicable technical specifications when taking equipment out of service.
  • Clearance activities, including confirmation that tags were properly hung and equipment appropriately configured to safely support the work or testing.
  • Reactor water inventory controls, including flow paths, configurations, and alternative means for inventory addition, and controls to prevent inventory loss.
  • Controls over activities that could affect reactivity.
  • Startup and ascension to full power operation, tracking of startup prerequisites, walkdown of the drywell (primary containment) to verify that debris had not been left which could block emergency core cooling system suction strainers, and reactor physics testing.
  • Licensee identification and resolution of problems related to forced outage activities.

These activities constitute completion of one other outage inspection samples, as defined in Inspection Procedure 71111.20-05.

b. Findings

No findings were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors selected risk-significant surveillance activities based on risk information and reviewed the USAR, procedure requirements, and technical specifications to ensure that the surveillance activities listed below demonstrated that the systems, structures, and/or components tested were capable of performing their intended safety functions.

The inspectors either witnessed or reviewed test data to verify that the significant surveillance test attributes were adequate to address the following:

  • Preconditioning
  • Evaluation of testing impact on the plant
  • Acceptance criteria
  • Test equipment
  • Procedures
  • Jumper/lifted lead controls
  • Test data
  • Testing frequency and method demonstrated technical specification operability
  • Test equipment removal
  • Restoration of plant systems
  • Reference setting data
  • Annunciators and alarms setpoints The inspectors also verified that licensee personnel identified and implemented any needed corrective actions associated with the surveillance testing.
  • July 15, 2013, containment purge valve leakage test for valves (HZ 8,9,11,12, and HZ 4,5,6,7)
  • August 15, 2013, control and shutdown rod operability verification Specific documents reviewed during this inspection are listed in the attachment.

These activities constitute completion of two surveillance testing inspection samples, as defined in Inspection Procedure 71111.22-05.

b. Findings

No findings were identified.

Cornerstone: Emergency Preparedness

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures and the Emergency Plan located under ADAMS accession number ML13156A380 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

These activities constitute completion of one sample as defined in Inspection Procedure 71114.04-05.

b. Findings

No findings were identified.

1EP6 Drill Evaluation

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors evaluated the conduct of routine licensee emergency drills on July 8, 2013, July 10, 2013, and August 20, 2013, to identify any weaknesses and deficiencies in classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the Control Room Simulator, Technical Support Center, and Emergency Operations Facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the licensee drill critique to compare any inspector-observed weakness with those identified by the licensee staff in order to evaluate the critique and to verify whether the licensee staff was properly identifying weaknesses and entering them into the corrective action program. As part of the inspection, the inspectors reviewed the drill package and other documents listed in the attachment.

These activities constitute completion of three emergency preparedness drill observation samples, as defined in Inspection Procedure 71114.06-05.

b. Findings

No findings were identified.

4OA1 Performance Indicator Verification

.1 Data Submission Issue

a. Inspection Scope

The inspectors performed a review of the performance indicator data submitted by the licensee for the second quarter 2013 performance indicators for any obvious inconsistencies prior to its public release in accordance with Inspection Manual Chapter 0608, Performance Indicator Program.

This review was performed as part of the inspectors normal plant status activities and, as such, did not constitute a separate inspection sample.

b. Findings

No findings were identified.

.2 Mitigating Systems Performance Index - Emergency ac Power System (MS06)

a. Inspection Scope

The inspectors sampled licensee submittals for the mitigating systems performance index - emergency ac power system performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, mitigating systems performance index derivation reports, issue reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.

These activities constitute completion of one mitigating systems performance index -

emergency ac power system sample, as defined in Inspection Procedure 71151-05.

b. Findings

No findings were identified.

.3 Mitigating Systems Performance Index - High Pressure Injection Systems (MS07)

a. Inspection Scope

The inspectors sampled licensee submittals for the mitigating systems performance index - high pressure injection systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013, to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection and, if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.

These activities constitute completion of one mitigating systems performance index -

high pressure injection system sample, as defined in Inspection Procedure 71151-05.

b. Findings

No findings were identified.

.4 Mitigating Systems Performance Index - Cooling Water Systems (MS10)

a. Inspection Scope

The inspectors sampled licensee submittals for the mitigating systems performance index - cooling water systems performance indicator for the period from the third quarter 2012 through the second quarter 2013. To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6. The inspectors reviewed the licensees operator narrative logs, issue reports, mitigating systems performance index derivation reports, event reports, and NRC integrated inspection reports for the period of July 2012 through June 2013 to validate the accuracy of the submittals. The inspectors reviewed the mitigating systems performance index component risk coefficient to determine if it had changed by more than 25 percent in value since the previous inspection, and if so, that the change was in accordance with applicable NEI guidance. The inspectors also reviewed the licensees issue report database to determine if any problems had been identified with the performance indicator data collected or transmitted for this indicator and none were identified.

These activities constitute completion of one mitigating systems performance index -

cooling water system sample, as defined in Inspection Procedure 71151-05.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1 Routine Review of Identification and Resolution of Problems

a. Inspection Scope

As part of the various baseline inspection procedures discussed in previous sections of this report, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that they were being entered into the licensees corrective action program at an appropriate threshold, that adequate attention was being given to timely corrective actions, and that adverse trends were identified and addressed. The inspectors reviewed attributes that included the complete and accurate identification of the problem; the timely correction, commensurate with the safety significance; the evaluation and disposition of performance issues, generic implications, common causes, contributing factors, root causes, extent of condition reviews, and previous occurrences reviews; and the classification, prioritization, focus, and timeliness of corrective actions. Minor issues entered into the licensees corrective action program because of the inspectors observations are included in the attached list of documents reviewed.

These routine reviews for the identification and resolution of problems did not constitute any additional inspection samples. Instead, by procedure, they were considered an integral part of the inspections performed during the quarter and documented in Section 1 of this report.

b. Findings

No findings were identified.

.2 Daily Corrective Action Program Reviews

a. Inspection Scope

In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the licensees corrective action program. The inspectors accomplished this through review of the stations daily corrective action documents.

The inspectors performed these daily reviews as part of their daily plant status monitoring activities and, as such, did not constitute any separate inspection samples.

b. Findings

No findings were identified.

.3 In-depth Review of Operator Workarounds

a. Inspection Scope

Wolf Creek had two operator work-arounds affecting emergency operation of safety-related equipment and four operator burdens which detail work-around delays in normal day-to-day operations. The inspectors audited the operator work-arounds and operator burdens to verify that that no current plant equipment issues were impacting emergency operation of safety related equipment, that the licensees quantification of the aggregate operator burden was accurate and that the total aggregate burden is not impacting safe operations of the facility. Furthermore, the inspectors performed a more detailed review of the operator work arounds and verified that the licensee has developed a plan to correct the deficiencies causing the operator work-arounds so that normal operation can be restored.

b. Findings

No findings were identified.

4OA3 Follow-up of Events and Notices of Enforcement Discretion

.1 (Closed) Licensee Event Report 05000482/2011-002-00 and -01: Noncompliance with

TS 3.8.1, AC Sources - Operating On February 22, 2011, operators declared the A diesel generator inoperable due to a control pin on the fuel rack not being installed correctly. The licensee returned the equipment back to service after replacing the control pin, washer, and cotter pin correctly. The inspectors dispositioned this violation of technical specifications as a licensee-identified violation in Section 4OA7 of NRC Integrated Inspection Report 05000482/2012005. No additional deficiencies were identified during the review of these Licensee Event Reports supplemental revisions.

This Licensee Event Report is closed.

.2 (Closed) Licensee Event Report 05000482/2013-004-00: Technical Specification Limiting

Condition for Operation 3.0.3 Requiring Plant Shutdown During Refueling Outage 19, the licensee was replacing the air conditioning unit SGK05A Class 1E electrical equipment air conditioning compressor. When the first mounting screw was being torqued to the 50 inch-pounds as required by the maintenance work instructions, it snapped off. The licensee determined that this torque value was too high. An extent of condition review revealed that over-torquing of fasteners on SGK04B and SGK05B had also occurred during their respective maintenance activities performed on August 12, 2011, and May 30, 2012. This is a violation of the following technical specifications because two trains of Class 1E electrical equipment for air conditioning were not functional in Modes one through four at the same time:

  • Limiting Condition for Operation 3.0.3, The licensee determined that over torqued mounting screws could render the equipment inoperable, and unable to function during a seismic event.

Corrective actions included properly replacing mounting screws, and revising Procedure AI 16C-007, Work Order Planning, to require a copy of the reference source document for any work instruction that includes torquing data for an installed safety system or component.

Since the mounting screws on Train B had not failed and are only required to prevent failure in a seismic event, of which probability is low, safety significance of this condition is low. Additionally, the room temperatures, which are controlled by operating air conditioning equipment, remained below area limits for qualification of electrical equipment.

The licensee determined the event was reportable in accordance with 10 CFR 50.73, requiring reporting for plant shutdown required by technical specifications. The inspectors reviewed the Licensee Event Report and the corrective actions taken by plant personnel. The inspectors dispositioned this issue as a licensee-identified violation in Section 4OA7. No additional findings were identified during this review.

This Licensee Event Report is closed.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On October 8, 2013, the resident inspectors presented the inspection results to Mr. M. Sunseri, President and Chief Executive Officer, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

4OA7 Licensee-Identified Violations

The following violations of very low safety significance (Green) were identified by the licensee and are violations of NRC requirements which meet the criteria of the NRC Enforcement Policy for being dispositioned as non-cited violations.

.1 Technical Specification (TS) 3.8.4, DC Sources - Operating, requires two operable

trains of DC sources while in Modes 1 through 4. TS 3.8.7, Inverters - Operating, requires two operable trains of inverters while in Modes 1 through 4. Technical Specification 3.8.9, Distribution Systems - Operating, requires the Train A and Train B subsystems of the DC and AC vital bus systems be operable in Modes 1 through 4.

Technical Specifications 3.7.11, Control Room Air Conditioning System, requires two trains of Control Room Air Conditioning be operable in Modes 1 through 6. Technical Specification Limiting Condition for Operation (LCO) 3.0.3 requires, in part, that when an LCO is not met and the associated actions are not met or an action is not provided, the unit shall be placed in a Mode in which the LCO is not applicable, or take action within one hour to place the plant in Mode 3 within the next 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, Mode 4 within the next 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and Mode 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Contrary to the above, two trains of Class 1E electrical equipment air conditioning were not functional in Modes 1 through 4, but the licensee did not take action within one hour to place the plant in Mode 3 within the next 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, Mode 4 within the next 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and Mode 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. Specifically, the licensee over-torqued mounting screws on air conditioning units SGK04B and SGK05B during their respective maintenance activities performed on August 12, 2011, and May 30, 2012, rendering these air conditioning units and their supported systems inoperable. The licensee failed to restore air conditioning units SGK04B and SGK05B to operable status until March 22 and March 23, 2013; and thus exceeded the allowed action times of the respective Technical Specifications. Using Inspection Manual Chapter 0609, Appendix A, Exhibit 2, the inspectors performed a significance determination screening and determined that a more detailed risk evaluation was required because the finding potentially represented an actual loss of safety function for a single train for greater than the technical specification allowed outage time. The Senior Reactor Analyst determined that since the mounting screws did not actually fail, and their function is to prevent failure during a seismic event, and because of the low probability of a seismic event leading to core damage or early release, this violation is of very low safety significance (Green). This violation was entered into the licensees corrective action program as Condition Report 65421.

.2 Title 10 of the Code of Federal Regulations, Part 50, Appendix B, Criterion V,

Instructions, Procedures, and Drawings, states, in part, that activities affecting quality shall be prescribed by procedures appropriate to the circumstances. Contrary to the above, a procedure for an activity affecting quality was not appropriate to the circumstances. Specifically, as of May 6, 2013, Procedure MPE GK-004 GK Unit Preparation for Work, Revision 4, was inadequate to prevent over-tightening of the wing screws on the filter dryer assembly, in that the procedure did not specify how tight to leave the wing screws. This led to failure of the filter drier, pieces of which blocked the thermostatic expansion valves and overheated the Class 1E electrical equipment air conditioning chiller. Using Inspection Manual Chapter 609, Appendix A, Exhibit 2, Mitigating Systems Cornerstone screening questions, Section A, the finding was determined to be of very low safety significance (Green) because only one train of Class 1E electrical equipment was affected and room temperatures remained below maximum limits. This violation was entered into the licensees corrective action program as Condition Report 68818.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

T. Baban, Manager Systems Engineering
P. Bedgood, Manager, Radiation Protection
M. Brinkmeyer, Fire Protection Technician
J. Broschak, Engineering VP
A. Camp, Plant Manager
R. Clemens, Strategic Projects VP
D. Erbe, Manager Security
S. Henry, Manager Operations
R. Hobby, Licensing Engineer
M. McMullen, Design Engineer
W. Muilenburg, Supervisor Licensing
L. Ratzlaff, Manager Maintenance
T. Slenker, Operations CAPCO
R. Smith, Site Vice President
M. Sunseri, President and CEO
M. Westman, Manager Regulatory Affairs
S. Wideman, Licensing Engineer
J. Yunk, Manager Corrective Actions

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened and Closed

05000482/2013004- NCV Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading. (Section 1R05.1)

Closed

05000482/2011- LER Noncompliance with TS 3.8.1, AC Sources - Operating 2-00 and -01 (Section 4OA3.1)
05000482/2013- LER Technical Specification Limiting Condition for Operation 3.0.3 004-00 Requiring Plant Shutdown (Section 4OA3.2)

Attachment

LIST OF DOCUMENTS REVIEWED