ML12188A518: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12188A518 | | number = ML12188A518 | ||
| issue date = 07/18/2012 | | issue date = 07/18/2012 | ||
| title = | | title = Summary of Pre-Application Conference Call with Carolina Power & Light on the Transition to NFPA 805 Requirements for Brunswick for Brunswick Steam Electric Plant, Units 1 and 2 | ||
| author name = Saba F | | author name = Saba F | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = | | addressee name = | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 | ||
==SUBJECT:== | ==SUBJECT:== | ||
SUMMARY OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292) On June 26,2012, a Category 1 public meeting via conference call was held between the U.S. Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power & Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. | |||
==SUMMARY== | |||
OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292) | |||
On June 26,2012, a Category 1 public meeting via conference call was held between the U.S. | |||
Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power & | |||
Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. ML12167A043. The purpose of this conference call was for the licensee to have additional discussions with the NRC staff prior to submitting a license amendment request (LAR) to transition to NFPA 805. The topic covered in the licensee's presentation included; the use of probabilistic risk assessment sensitivities, installation of incipient fire detection systems in main control room and cable spreading room, and the treatment of solid bottom cable trays. No decision of the technical adequacy of the licensee's efforts was made by the staff during this conference call. | |||
The conference call notice and agenda dated June 11, 2012, are available in the ADAMS at Accession No. ML12160A573. The licensee's presentation slides for this conference call are available at ADAMS Accession No. ML12192A103. A list of attendees is enclosed. No member of the public was in attendance or on the phone. No meeting feedback was received. | |||
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. | |||
Sincerely, | |||
;:~YI'ak i c~ ~4~ | |||
Farideh Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees cc w/encl: Distribution via ListServ JUNE LIST OF PRE-APPLICATION CONFERENCE CALL THE U.S NUCLEAR REGULATORY AND CAROLINA POWER & LIGHT REGARDING NFPA-805 FOR BRUNSWICK UNIT NOS. 1 AND Nuclear Regulatory Commission Progress Energy -Call in A Klein J. Ertman S. Dinsmore A Holder H. Barrett E. Weigert C. Moulton L. Van Eeden L. Fields J. DeJoseph F. Saba K. Lavin B. Bishel NRC -Call in G. Martin W. Murray R. Layton (NRC's consultant) Enclosure July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 | List of Attendees cc w/encl: Distribution via ListServ | ||
JUNE 26,2012 LIST OF ATTENDEES PRE-APPLICATION CONFERENCE CALL BETWEEN THE U.S NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT COMPANY REGARDING NFPA-805 FOR BRUNSWICK UNIT NOS. 1 AND 2 Nuclear Regulatory Commission Progress Energy - Call in A Klein J. Ertman S. Dinsmore A Holder H. Barrett E. Weigert C. Moulton L. Van Eeden L. Fields J. DeJoseph F. Saba K. Lavin B. Bishel NRC -Call in G. Martin W. Murray R. Layton (NRC's consultant) | |||
Enclosure | |||
July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 | |||
==SUBJECT:== | ==SUBJECT:== | ||
SUMMARY OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292) On June 26,2012, a Category 1 public meeting via conference call was held between the U.S. Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power & Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. | |||
==SUMMARY== | |||
OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292) | |||
On June 26,2012, a Category 1 public meeting via conference call was held between the U.S. | |||
Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power & | |||
Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. ML12167A043. The purpose of this conference call was for the licensee to have additional discussions with the NRC staff prior to submitting a license amendment request (LAR) to transition to NFPA 805. The topic covered in the licensee's presentation included; the use of probabilistic risk assessment sensitivities, installation of incipient fire detection systems in main control room and cable spreading room, and the treatment of solid bottom cable trays. No decision of the technical adequacy of the licensee's efforts was made by the staff during this conference call. | |||
The conference call notice and agenda dated June 11, 2012, are available in the ADAMS at Accession No. ML12160A573. The licensee's presentation slides for this conference call are available at ADAMS Accession No. ML12192A103. A list of attendees is enclosed. No member of the public was in attendance or on the phone. No meeting feedback was received. | |||
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. | |||
Sincerely, IRA! | |||
Farideh Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Attendees cc w/encl: Distribution via ListServ DISTRIBUTION: PUBLIC RidsNrrPMBrunswick TWertz, NRR PLain, NRR LPL2-2 Branch Reading RidsNrrLABTully SDinsmore, NRR RidsNrrDra RidsAcrsAcnw_MailCTR RidsOgcRp DPickett, NRR RidsNrrDraAfpb RidsNrrDorlLpl2-2 RidsRgn2MailCenter SKennedy, EDO R-II RidsNrrDraApla | List of Attendees cc w/encl: Distribution via ListServ DISTRIBUTION: | ||
}} | PUBLIC RidsNrrPMBrunswick TWertz, NRR PLain, NRR LPL2-2 Branch Reading RidsNrrLABTully SDinsmore, NRR RidsNrrDra RidsAcrsAcnw_MailCTR RidsOgcRp DPickett, NRR RidsNrrDraAfpb RidsNrrDorlLpl2-2 RidsRgn2MailCenter SKennedy, EDO R-II RidsNrrDraApla ADAMSAccesslon Nos. PKG M L12 188A51 9 . ML1216oA 573 S ummary ML12188A518 Notice Handouts ML12192A103 iOFFICE DORLlLPL2-2 /PM DORLlLPL2-2/LA DRAlAPLAlBC (A) DRAlAFPB/BC NAME FSaba BTully BBeasley (with comments) AKlein (with comments) | ||
DATE 07/10/12 0710/12 07/12/12 07/17/12 OFFICE DORLlLPL2-2/BC(A) DORLlLPL2-2 /PM NAME JQuichocho FSaba iDATE 07/18/12 07/18/12 OFFICIAL RECORD COpy}} |
Latest revision as of 19:39, 5 December 2019
ML12188A518 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 07/18/2012 |
From: | Farideh Saba Plant Licensing Branch II |
To: | |
Saba, Farideh | |
Shared Package | |
ML12188A519 | List: |
References | |
TAC ME8291, TAC ME8292 | |
Download: ML12188A518 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292)
On June 26,2012, a Category 1 public meeting via conference call was held between the U.S.
Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power &
Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. ML12167A043. The purpose of this conference call was for the licensee to have additional discussions with the NRC staff prior to submitting a license amendment request (LAR) to transition to NFPA 805. The topic covered in the licensee's presentation included; the use of probabilistic risk assessment sensitivities, installation of incipient fire detection systems in main control room and cable spreading room, and the treatment of solid bottom cable trays. No decision of the technical adequacy of the licensee's efforts was made by the staff during this conference call.
The conference call notice and agenda dated June 11, 2012, are available in the ADAMS at Accession No. ML12160A573. The licensee's presentation slides for this conference call are available at ADAMS Accession No. ML12192A103. A list of attendees is enclosed. No member of the public was in attendance or on the phone. No meeting feedback was received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely,
- ~YI'ak i c~ ~4~
Farideh Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
List of Attendees cc w/encl: Distribution via ListServ
JUNE 26,2012 LIST OF ATTENDEES PRE-APPLICATION CONFERENCE CALL BETWEEN THE U.S NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT COMPANY REGARDING NFPA-805 FOR BRUNSWICK UNIT NOS. 1 AND 2 Nuclear Regulatory Commission Progress Energy - Call in A Klein J. Ertman S. Dinsmore A Holder H. Barrett E. Weigert C. Moulton L. Van Eeden L. Fields J. DeJoseph F. Saba K. Lavin B. Bishel NRC -Call in G. Martin W. Murray R. Layton (NRC's consultant)
Enclosure
July 18, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF JUNE 26,2012, PREAPPLICATION CONFERENCE CALL WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME8291 AND ME8292)
On June 26,2012, a Category 1 public meeting via conference call was held between the U.S.
Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power &
Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. This conference call was a follow up to a meeting held on May 31, 2012, regarding transition to NFPA 805 for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The May 31, 2012, meeting summary is available in Agencywide Documents Access and Management System (ADAMS) Accession No. ML12167A043. The purpose of this conference call was for the licensee to have additional discussions with the NRC staff prior to submitting a license amendment request (LAR) to transition to NFPA 805. The topic covered in the licensee's presentation included; the use of probabilistic risk assessment sensitivities, installation of incipient fire detection systems in main control room and cable spreading room, and the treatment of solid bottom cable trays. No decision of the technical adequacy of the licensee's efforts was made by the staff during this conference call.
The conference call notice and agenda dated June 11, 2012, are available in the ADAMS at Accession No. ML12160A573. The licensee's presentation slides for this conference call are available at ADAMS Accession No. ML12192A103. A list of attendees is enclosed. No member of the public was in attendance or on the phone. No meeting feedback was received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, IRA!
Farideh Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
List of Attendees cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC RidsNrrPMBrunswick TWertz, NRR PLain, NRR LPL2-2 Branch Reading RidsNrrLABTully SDinsmore, NRR RidsNrrDra RidsAcrsAcnw_MailCTR RidsOgcRp DPickett, NRR RidsNrrDraAfpb RidsNrrDorlLpl2-2 RidsRgn2MailCenter SKennedy, EDO R-II RidsNrrDraApla ADAMSAccesslon Nos. PKG M L12 188A51 9 . ML1216oA 573 S ummary ML12188A518 Notice Handouts ML12192A103 iOFFICE DORLlLPL2-2 /PM DORLlLPL2-2/LA DRAlAPLAlBC (A) DRAlAFPB/BC NAME FSaba BTully BBeasley (with comments) AKlein (with comments)
DATE 07/10/12 0710/12 07/12/12 07/17/12 OFFICE DORLlLPL2-2/BC(A) DORLlLPL2-2 /PM NAME JQuichocho FSaba iDATE 07/18/12 07/18/12 OFFICIAL RECORD COpy