Other: BSEP 13-0097, Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, Aug, BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805, ML13277A041, ML14079A234, ML14079A235, ML14079A236, ML14079A237, ML14079A238
|
MONTHYEARML12152A1452012-05-31031 May 2012 20120531 Bnp NRC Pre-LAR Application Meeting Final Project stage: Meeting BSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2012-09-25025 September 2012 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request BSEP 12-0126, Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Request BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident Project stage: Request ML13004A3382013-01-0808 January 2013 Acceptance for Review of License Amendment Request for NFPA Standard 805 (TAC Nos. ME9623 and Me9624) Project stage: Acceptance Review ML13123A2312013-05-15015 May 2013 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML13141A6222013-05-23023 May 2013 RAI Re. Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) Project stage: RAI BSEP 13-0066, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-06-28028 June 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 13-0070, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-15015 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2382013-07-16016 July 2013 Fourth Quarter 2012 Fire Protection Program Health Report, Enclosure 6 Project stage: Other ML14079A2372013-07-16016 July 2013 Fourth Quarter 2011 Fire Protection Program Health Report, Enclosure 5 Project stage: Other BSEP 13-0083, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-31031 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report2013-07-31031 July 2013 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report Project stage: Request BSEP 13-0097, Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, Aug2013-08-28028 August 2013 Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, August Project stage: Other ML13246A2762013-08-29029 August 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 Project stage: Response to RAI ML13277A0412013-09-19019 September 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Other BSEP 13-0107, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624)2013-09-30030 September 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14079A2352014-01-0909 January 2014 FIR-NGGC-0009, NFPA 805 Transient Combustibles and Ignition Source Controls Program, Enclosure 3 Project stage: Other ML13365A3202014-01-14014 January 2014 Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML14079A2362014-01-24024 January 2014 Fourth Quarter 2013 Fire Protection Program Health Report, Enclosure 4 Project stage: Other ML14028A1782014-02-12012 February 2014 Second Set of Probabilistic Risk Assessment Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0023, Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-02-28028 February 2014 Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request BSEP 14-0029, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-03-14014 March 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 14-0035, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-04-10010 April 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2342014-04-30030 April 2014 BNP-PSA-086, Bnp Fire PRA - Fire Scenario Data, Enclosure 2, Attachment 25 Project stage: Other 05000324/LER-2014-004, Regarding Fire Related Unanalyzed Condition That Could Impact Equipment Credited in Safe Shutdown Analysis2014-05-16016 May 2014 Regarding Fire Related Unanalyzed Condition That Could Impact Equipment Credited in Safe Shutdown Analysis Project stage: Request ML14155A2092014-06-0404 June 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0076, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-06-26026 June 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14205A5922014-07-24024 July 2014 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML14220A2132014-08-0808 August 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0092, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624)2014-08-15015 August 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624) Project stage: Response to RAI BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-08-29029 August 2014 Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Other ML14297A2662014-10-24024 October 2014 Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 Project stage: Approval BSEP 14-0122, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 8052014-11-20020 November 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Request BSEP 14-0134, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-12-18018 December 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request ML14310A8082015-01-28028 January 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(C) Project stage: Approval 2014-01-09
[Table View] |
Text
Brunswick Nuclear Plant Units 1 and 2 NFPA 805 Pre-LAR Application Meeting May 31, 2012 Jeff Ertman - NFPA 805 Project Manager
Agenda Transition Project Overview License Amendment Request Overview Fire PRA Overview 2
Acronyms O FPRA - Fire Probabilistic Risk Assessment O FP - Fire Protection O FSA - Fire Safety Analysis O DID - Defense in Depth O NSCA - Nuclear Capability Safety Assessment O SSA - Safe Shutdown Analysis O FRE Fire Risk Evaluation O FRE - Fire Risk Evaluation O RA - Recovery Action O HRA - Human Reliability Analysis O CPT - Control Power Transformer O VFDR - Variance From Deterministic Requirements O NPO - Non-Power Operations O EPU - Extended Power Uprate O F&O - Findings and Observations O MSO - Multiple Spurious Operations 3
Presenters Z Jeff Ertman - NGG, Fleet FP Supervisor, 805 PM Z Alan Holder - NGG, Fleet Fire Protection Lead Z Ed Wiegert - NGG, Fleet Fire PRA Lead Z Kelly Lavin - NGG, NFPA 805, LAR Development Z Lee Grzeck - BNP, Supervisor of Licensing Z John Becker - BNP, Supervisor Engineering Programs On the Phone for PE:
Z Leunis van Eeten - BNP, Project Tech Lead Z Robert Smith - NGG, Project Team Z Chris Browne - NGG, Project Team 4
Transition Project Overview Project Milestones Project Status 5
NFPA 805 Project Milestones Milestone Plant HNP BNP RNP CR3 SSA Validation Calculation Complete Complete June 2012 Complete FPRA Inputs Ready Complete Complete Aug 2012 Complete FPRA Peer Review Complete Complete Dec 2012 Complete EPU d O h I
N/A N/A N/A 4Q 2013 6
EPU and Other Impacts N/A N/A N/A 4Q 2013 NFPA 805 LAR Submittal Complete Sept 2012 Sept 2013 July 2014 Forecast LAR RAIs Complete 3Q 2013 3Q 2014 1Q 2015 Forecast SE from NRC Complete 1Q 2014 1Q 2015 4Q 2015 FP Program Implementation Complete 3Q 2014 3Q 2015 2Q 2016 Target Project Closeout 2Q 2013 3Q 2015 4Q 2015 4Q 2016
Brunswick Project Status Final Stage of PRA Development 3/4 Revision of Quantification Calculation in Progress 3/4 Application Calculation in Progress (VFDR Evaluations)
FSAs In Progress 3/4 FREs 3/4 FREs 3/4 RA Decisions 3/4 DID Decisions 3/4 Required Fire Protection Systems LAR Development 3/4 Early Stages 3/4 Site Review Scheduled to Start in July 7
License Amendment Request Overview Classical Fire Protection NFPA 805 Monitoring NSCA Modifications Treatment of Generic Issues LAR Document 8
Classical Fire Protection NFPA 805 Chapter 3 (B-1 Table) 3/4 Revision of NFPA Code Compliance Calculations in Progress 3/4 Three Potential Modifications Radiation Release During Fire Brigade
Response
3/4 Preliminary Review at BNP in Late 2007 3/4 Updating to Current LAR Template 3/4 Incorporating Non-Pilot LAR Feedback 9
NFPA 805 Monitoring Same Base Program as Harris Makes Use of existing NGG Fleet Procedure BNP Submittal Updated With NEI 04-02, FAQ 10-0059 10
NSCA - at Power SSA Fire Area Analysis Complete VFDRs Identified 3/4 Additions Due to Exemption Elimination Recovery Action Strategy 11 3/4 Minimize III.G.3 RA Transition 3/4 DID Review In Process 3/4 Minimize Pre-Emptive Actions MSO Expert Panel 3/4 Used NEI 00-01 Rev 3 MSO List
NSCA - Non Power Operations (NPO)
Same Process as Harris BNP Area Analysis Prepared S
f S 12 Site Review of Strategies in Progress
Modifications Potential Modifications Identified Final Scope After Fire PRA and FSAs Completed 3/4 Plant Review 13
Treatment of Generic Issues (RAIs)
Monitoring Program Defense-in-Depth Safety Margin Treatment of FPRA Un-Reviewed Analysis Methods 14 Analysis Methods Use of EPRI Process for Surveillance Optimization FPRA Sensitivity Study on CPT Factor 2
LAR Document Submittal Using Current Industry LAR Template 3/4 NEI Incorporating Generic RAIs Incorporating Known Lessons Learned 3/4 2011 NFPA 805 S b itt l 3/4 2011 NFPA 805 Submittals 3/4 Current Generic RAIs 15
Fire PRA Overview BNP Overview Important Fire Areas and Scenarios Peer Review Current Status 16
Fire PRA Overview Methods Similar to Harris Application 3/4 NUREG-6850 3/4 Used Accepted Alternatives (eg. FAQ 08-0046) 3/4 RG 1.200 Peer Review Process Other Methods 3/4 The BNP FPRA Uses:
9 A Severity Factor of 0.1, Where 90% of the Fires are Contained Within the MCC 9
HRR Severity Factors are Treated Independently, Similar to Other Cabinets 3/4 Method was Used to Address RAI 5-32 for the HNP NFPA-805 Application 17
Fire PRA Overview Significant Efforts 3/4 Bus Ducts and Below-Ground Cable Ducts 3/4 Electrical Coordination PRA Components 3/4 Walkdowns and Related Documentation No Credit Taken for Flame Retardant 3/4 Installed on Thermoset Cable 3/4 Cable Spread Room (CSR) 3/4 Diesel Generator Building Basement 18
Fire PRA Overview Incipient Detection 3/4 Main Control Boards - Credit per FAQ 08-0046 3/4 CSR Area Wide - Normal Detection Credit Crediting Existing Solid Bottom Trays to Delay Damage 3/4 Per NUREG/CR-6850 19
Important Areas and Scenarios Cable Spread Room Control Room Abandonment 3/4 Detailed HRA Control Room Turbine Building Battery Rooms Switchgear Rooms 20
Fire PRA Peer Review Peer Review Overview 3/4 Peer Review Performed December 2011 9
53 Findings 9
50 Suggestions 3/4 Performed by Boiling Water Reactor 3/4 Performed by Boiling Water Reactor Owners Group per NEI 07-12 Process 3/4 Revised to Incorporate Findings, Resulted in Decrease in Core Damage Frequency 21
Fire PRA Peer Review Resolved 40 Findings Revised Calculations for F&O Resolution R
Q tifi d f C
D F
Re-Quantified for Core Damage Frequency (CDF) and Large Early Release Frequency (LERF) 22
Fire PRA Status Fire CDF Decreased Over 50%
One Modification Credited 3/4 Crediting Incipient Detection in Main Control Room Cabinets (Per FAQ Guidance)
Guidance)
Additional Fire Modeling 3/4 Diesel Generator Building Basement 3/4 Main Control Room 3/4 Cable Spread Room 23
Closing NFPA 805 Fire PRA Application Calculation in Progress FSAs In Progress LAR Submittal by Sept 30, 2012 24
Questions
?