| issue date = 09/03/2013 | |||
| title = Mid-Cycle Performance Review and Inspection Plan Report 05000443/2013006 | |||
| author name = Roberts D | |||
| author affiliation = NRC/RGN-I/DRP/PB3 | |||
| addressee name = Walsh K | |||
| addressee affiliation = NextEra Energy Seabrook, LLC | |||
| docket = 05000443 | |||
| license number = NPF-086 | |||
| contact person = dentel, gt | |||
| document report number = IR-13-006 | |||
| document type = Inspection Report, Letter, Inspection Plan | |||
| page count = 5 | |||
}} | |||
See also: [[see also::IR 05000443/2013006]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION I | |||
2100 RENAISSANCE BOULEVARD, SUITE 100 | |||
KING OF PRUSSIA, PENNSYLVANIA 19406-2713 | |||
September 3, 2013 | |||
Mr. Kevin Walsh, Site Vice President | |||
Seabrook Nuclear Power Plant | |||
NextEra Energy Seabrook, LLC | |||
c/o Mr. Michael Ossing | |||
P. O. Box 300 | |||
Seabrook, NH 03874 | |||
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | |||
SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2013006) | |||
Dear Mr. Walsh: | |||
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle | |||
performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most | |||
recent quarterly performance indicators in addition to inspection results and enforcement | |||
actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs | |||
assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined the performance at Seabrook during the most recent quarter was within | |||
the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix | |||
because all inspection findings had very low (i.e., green) safety significance, and all Pls | |||
indicated that your performance was within the nominal, expected range (i.e., green). On | |||
January 24, 2013, the NRC completed a supplemental inspection for a White finding that | |||
involved the failure of Seabrook Station personnel to adequately critique the performance of an | |||
evaluated emergency preparedness exercise and determined that Seabrook appropriately | |||
addressed the root and contributing causes, extent of condition and corrective actions. The | |||
White finding was removed from the assessment process resulting in Seabrook transitioning | |||
from the Regulatory Response Column to the Licensee Response Column of the NRC's Action | |||
Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
The NRC acknowledged your satisfactory completion of all of the commitments in Confirmatory | |||
Action Letter (CAL) 1-12-002, regarding the Alkali-Silica Reaction (ASR) concrete issues in | |||
NRC Inspection Report 05000443/2012009 (ML12338A283) dated December 3, 2012, and | |||
NRC Inspection Report 05000443/2012010 (ML13221A172) dated August 9, 2013. Based on | |||
completion of our review of your CAL commitments and the determination that NextEra's | |||
methods for assessing operability of ASR-affected reinforced concrete structures were | |||
reasonable and generally comprehensive, the NRC has determined that the exit criteria | |||
contained in the September 5, 2012, Deviation Memorandum (ML12242A370) regarding | |||
Seabrook ASR evaluation activities, have been met and our overall level of inspection oversight | |||
will return to those described in the ROP baseline inspection program. | |||
K. Walsh 2 | |||
While our review of the CAL items is complete, the NRC plans to continue to provide focused | |||
oversight of NextEras testing being conducted at the Ferguson Structural Engineering | |||
Laboratory at the University of Texas - Austin and your assessment of ASR progression in | |||
Seabrook concrete structures. Our inspection activities will be conducted using our annual | |||
follow-up of selected Problem Identification and Resolution samples. While tentative dates for | |||
these inspections are included in the attached inspection schedule, we understand that your | |||
testing schedule is subject to change and we will coordinate closely with your ASR project | |||
management staff to select the most advantageous opportunities to observe your activities. | |||
The enclosed inspection plan lists the inspections scheduled through December 31, 2014. | |||
Routine inspections performed by resident inspectors are not included in the inspection plan. In | |||
addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review | |||
of the Implementation of the Industry Initiative to Control Degradation of Underground Piping | |||
and Tanks and Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel | |||
Storage Installation at Operating Plants. The inspections listed during the last nine months of | |||
the inspection plan are tentative and may be revised at the end-of-cycle performance review. | |||
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and | |||
personnel availability issues. The NRC will contact you as soon as possible to discuss changes | |||
to the inspection plan should circumstances warrant any changes. This inspection plan does | |||
not include security-related inspections, which will be sent via separate, non-publicly available | |||
correspondence. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of | |||
the NRCs Rules of Practice, a copy of this letter will be available electronically for public | |||
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) | |||
component of the NRC's Agencywide Documents Access and Management system (ADAMS). | |||
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html | |||
(the Public Electronic Reading Room). | |||
Please contact Glenn Dentel at 610-337-5233 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Darrell J. Roberts, Director | |||
Division of Reactor Projects | |||
Docket Nos.: 50-443 | |||
License Nos.: NPF-86 | |||
Enclosure: Inspection Plan | |||
cc w/encl: Distribution via ListServ | |||
ML13246A107 | |||
Non-Sensitive Publicly Available | |||
SUNSI Review | |||
Sensitive Non-Publicly Available | |||
OFFICE RI/DRP RI/DRP RI/DRP RI/DRP | |||
NAME PCataldo/PC via email MDraxton/MD GDentel/ GTD DRoberts/ DJR | |||
DATE 08/28 /13 08/ 28 /13 08/28/13 09/02 /13 | |||
Page 1 of 2 Seabrook | |||
08/05/2013 11:36:21 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2013 - 12/31/2014 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
EXM 7/16 - SEABROOK INITIAL EXAM 5 | |||
1 07/15/2013 07/20/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM | |||
EP PROGR - EP PROGRAM INSPECTION 1 | |||
1 07/15/2013 07/19/2013 IP 7111402 Alert and Notification System Testing | |||
1 07/15/2013 07/19/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System | |||
1 07/15/2013 07/19/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
71124 - REMP 1 | |||
1 07/22/2013 07/26/2013 IP 71124.07 Radiological Environmental Monitoring Program | |||
ISFSI - ISFSI LOADING INSPECTION 4 | |||
1 08/05/2013 08/09/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants | |||
7111111B - SEABROOK REQUAL INSP WITH P/F RESULTS 2 | |||
1 10/28/2013 11/01/2013 IP 7111111B Licensed Operator Requalification Program | |||
ASR - PI&R SAMPLE - ASR MONITORING 2 | |||
1 09/23/2013 09/27/2013 IP 71152 Problem Identification and Resolution | |||
71151 - HP PI VERIFICATION 1 | |||
1 12/02/2013 12/02/2013 IP 71151 Performance Indicator Verification | |||
ASR - PI&R SAMPLE - ASR MONITORING 2 | |||
1 02/10/2014 02/14/2014 IP 71152 Problem Identification and Resolution | |||
71124 - RAD HAZARD & ALARA 1 | |||
1 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls | |||
TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 | |||
1 03/17/2014 03/21/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping | |||
7111108P - INSERVICE INSPECTION 1 | |||
1 04/07/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR | |||
71124 - HP INSPECTION IP 71124.01, 02, 03 & 04 1 | |||
1 04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1 04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls | |||
1 04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation | |||
1 04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment | |||
TRI FI - TRIENNIAL FIRE PROTECTION 7 | |||
1 06/23/2014 06/27/2014 IP 7111105T Fire Protection [Triennial] | |||
1 07/07/2014 07/11/2014 IP 7111105T Fire Protection [Triennial] | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 of 2 Seabrook | |||
08/05/2013 11:36:21 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2013 - 12/31/2014 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
71152B - PI&R BIENNIAL 1 | |||
1 08/04/2014 08/09/2014 IP 71152B Problem Identification and Resolution | |||
1 08/18/2014 08/23/2014 IP 71152B Problem Identification and Resolution | |||
71124.05 - HP INSPECTION RAD INSTRUMENTATION 1 | |||
1 08/11/2014 08/15/2014 IP 71124.05 Radiation Monitoring Instrumentation | |||
ASR - PI&R SAMPLE - ASR MONITORING 2 | |||
1 08/11/2014 08/15/2014 IP 71152 Problem Identification and Resolution | |||
71124.08 - RADWASTE 1 | |||
1 08/18/2014 08/22/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation | |||
EP EXER - EP EXERCISE INSPECTION 1 | |||
1 11/03/2014 11/07/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} |
Latest revision as of 11:50, 5 December 2019
ML13246A107 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 09/03/2013 |
From: | Darrell Roberts Reactor Projects Branch 3 |
To: | Walsh K NextEra Energy Seabrook |
dentel, gt | |
References | |
IR-13-006 | |
Download: ML13246A107 (5) | |
See also: IR 05000443/2013006
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BOULEVARD, SUITE 100
KING OF PRUSSIA, PENNSYLVANIA 19406-2713
September 3, 2013
Mr. Kevin Walsh, Site Vice President
Seabrook Nuclear Power Plant
NextEra Energy Seabrook, LLC
c/o Mr. Michael Ossing
P. O. Box 300
Seabrook, NH 03874
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2013006)
Dear Mr. Walsh:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most
recent quarterly performance indicators in addition to inspection results and enforcement
actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs
assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Seabrook during the most recent quarter was within
the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., green) safety significance, and all Pls
indicated that your performance was within the nominal, expected range (i.e., green). On
January 24, 2013, the NRC completed a supplemental inspection for a White finding that
involved the failure of Seabrook Station personnel to adequately critique the performance of an
evaluated emergency preparedness exercise and determined that Seabrook appropriately
addressed the root and contributing causes, extent of condition and corrective actions. The
White finding was removed from the assessment process resulting in Seabrook transitioning
from the Regulatory Response Column to the Licensee Response Column of the NRC's Action
Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC acknowledged your satisfactory completion of all of the commitments in Confirmatory
Action Letter (CAL) 1-12-002, regarding the Alkali-Silica Reaction (ASR) concrete issues in
NRC Inspection Report 05000443/2012009 (ML12338A283) dated December 3, 2012, and
NRC Inspection Report 05000443/2012010 (ML13221A172) dated August 9, 2013. Based on
completion of our review of your CAL commitments and the determination that NextEra's
methods for assessing operability of ASR-affected reinforced concrete structures were
reasonable and generally comprehensive, the NRC has determined that the exit criteria
contained in the September 5, 2012, Deviation Memorandum (ML12242A370) regarding
Seabrook ASR evaluation activities, have been met and our overall level of inspection oversight
will return to those described in the ROP baseline inspection program.
K. Walsh 2
While our review of the CAL items is complete, the NRC plans to continue to provide focused
oversight of NextEras testing being conducted at the Ferguson Structural Engineering
Laboratory at the University of Texas - Austin and your assessment of ASR progression in
Seabrook concrete structures. Our inspection activities will be conducted using our annual
follow-up of selected Problem Identification and Resolution samples. While tentative dates for
these inspections are included in the attached inspection schedule, we understand that your
testing schedule is subject to change and we will coordinate closely with your ASR project
management staff to select the most advantageous opportunities to observe your activities.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan. In
addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review
of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
and Tanks and Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel
Storage Installation at Operating Plants. The inspections listed during the last nine months of
the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and
personnel availability issues. The NRC will contact you as soon as possible to discuss changes
to the inspection plan should circumstances warrant any changes. This inspection plan does
not include security-related inspections, which will be sent via separate, non-publicly available
correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of
the NRCs Rules of Practice, a copy of this letter will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Please contact Glenn Dentel at 610-337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director
Division of Reactor Projects
Docket Nos.: 50-443
License Nos.: NPF-86
Enclosure: Inspection Plan
cc w/encl: Distribution via ListServ
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP RI/DRP
NAME PCataldo/PC via email MDraxton/MD GDentel/ GTD DRoberts/ DJR
DATE 08/28 /13 08/ 28 /13 08/28/13 09/02 /13
Page 1 of 2 Seabrook
08/05/2013 11:36:21 Inspection / Activity Plan
Report 22
07/01/2013 - 12/31/2014
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
EXM 7/16 - SEABROOK INITIAL EXAM 5
1 07/15/2013 07/20/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM
EP PROGR - EP PROGRAM INSPECTION 1
1 07/15/2013 07/19/2013 IP 7111402 Alert and Notification System Testing
1 07/15/2013 07/19/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1 07/15/2013 07/19/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
71124 - REMP 1
1 07/22/2013 07/26/2013 IP 71124.07 Radiological Environmental Monitoring Program
ISFSI - ISFSI LOADING INSPECTION 4
1 08/05/2013 08/09/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
7111111B - SEABROOK REQUAL INSP WITH P/F RESULTS 2
1 10/28/2013 11/01/2013 IP 7111111B Licensed Operator Requalification Program
ASR - PI&R SAMPLE - ASR MONITORING 2
1 09/23/2013 09/27/2013 IP 71152 Problem Identification and Resolution
1 12/02/2013 12/02/2013 IP 71151 Performance Indicator Verification
ASR - PI&R SAMPLE - ASR MONITORING 2
1 02/10/2014 02/14/2014 IP 71152 Problem Identification and Resolution
71124 - RAD HAZARD & ALARA 1
1 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls
TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1
1 03/17/2014 03/21/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
7111108P - INSERVICE INSPECTION 1
1 04/07/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR
71124 - HP INSPECTION IP 71124.01, 02, 03 & 04 1
1 04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls
1 04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
1 04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment
TRI FI - TRIENNIAL FIRE PROTECTION 7
1 06/23/2014 06/27/2014 IP 7111105T Fire Protection [Triennial]
1 07/07/2014 07/11/2014 IP 7111105T Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Seabrook
08/05/2013 11:36:21 Inspection / Activity Plan
Report 22
07/01/2013 - 12/31/2014
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
71152B - PI&R BIENNIAL 1
1 08/04/2014 08/09/2014 IP 71152B Problem Identification and Resolution
1 08/18/2014 08/23/2014 IP 71152B Problem Identification and Resolution
71124.05 - HP INSPECTION RAD INSTRUMENTATION 1
1 08/11/2014 08/15/2014 IP 71124.05 Radiation Monitoring Instrumentation
ASR - PI&R SAMPLE - ASR MONITORING 2
1 08/11/2014 08/15/2014 IP 71152 Problem Identification and Resolution
71124.08 - RADWASTE 1
1 08/18/2014 08/22/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EP EXER - EP EXERCISE INSPECTION 1
1 11/03/2014 11/07/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event
This report does not include INPO and OUTAGE activities.