IR 05000443/2022005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Seabrook Station (Report 05000443/2022005)
ML22242A021
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/31/2022
From: Matt Young
NRC/RGN-I/DORS
To: Coffey B
Florida Power & Light Co
Young M
References
IR 2022005
Download: ML22242A021 (5)


Text

August 31, 2022

SUBJECT:

UPDATED INSPECTION PLAN FOR SEABROOK STATION (REPORT 05000443/2022005)

Dear Bob Coffey:

The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Seabrook Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2.

In response to the COVID19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and

Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.

The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.3 For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely, Digitally signed by Matthew R.

Matthew R. Young Date: 2022.08.31 07:55:12 Young -04'00'

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety Docket No. 05000443 License No. NPF-86 Enclosure:

Seabrook Inspection Plan cc w/encl: Distribution via ListServ

This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.

ML22242A021 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME S. Elkhiamy M. Young DATE 8/26/22 8/29/22

Site Inspection Activity Plan Seabrook 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count Seabrook Siren Follow-up 5 1 8/15/2022 8/19/2022 IP 71114.02 000717 Alert and Notification System Testing Rad Environmental Monitoring Program (71124.07) 1 1 8/22/2022 8/26/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program ISFSI Operational Inspection (60855) - SB 1 1 9/12/2022 9/16/2022 IP 60855 001001 Operation Of An ISFSI RP Rad Gas and Liq Effluent Treatment / PIs (71124.06/71151) 1 1 10/17/2022 10/21/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification PI&R BIENNIAL TEAM INSPECTION - SB 4 1 10/31/2022 11/4/2022 IP 71152B 000747 Problem Identification and Resolution 1 11/14/2022 11/18/2022 IP 71152B 000747 Problem Identification and Resolution AA, FFD-SB 2 1 2/6/2023 2/10/2023 IP 71130.01 000733 Access Authorization 1 2/6/2023 2/10/2023 IP 71130.08 000740 Fitness For Duty Program FY23 Seabrook Initial License Exam 4 1 1/29/2023 2/4/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 3/6/2023 3/17/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - Seabrook 1 1 4/10/2023 4/21/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Rad Hazards (71124.01) 1 1 4/10/2023 4/14/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Respiratory Protection (71124.03) and Dosimetry (71124.04) 1 1 5/22/2023 5/26/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 5/22/2023 5/26/2023 IP 71124.04 000728 Occupational Dose Assessment FORCE-ON-FORCE PLANNING AND EXERCISE - SB 4 1 6/12/2023 6/16/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 7/10/2023 7/14/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Radwaste (71124.08) 1 1 7/17/2023 7/21/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Cyber Security - Seabrook 4 1 7/24/2023 7/28/2023 IP 71130.10 000741 Cybersecurity Prepared on 8/24/2022 8:13:29 AM 1 of 2 Enclosure

Site Inspection Activity Plan EP PROGRAM INSPECTION - SEABROOK 1 1 8/7/2023 8/11/2023 IP 71114.02 000717 Alert and Notification System Testing 1 8/7/2023 8/11/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 8/7/2023 8/11/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 8/7/2023 8/11/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 8/7/2023 8/11/2023 IP 71151 001397 Performance Indicator Verification Seabrook Requal Inspection with P/F results 2 1 8/20/2023 8/25/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 8/20/2023 8/25/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Fire Protection - Seabrook 3 1 9/18/2023 9/22/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 10/2/2023 10/6/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

HP Instrumentation (71124.05) and PI Verification (71151) 1 1 10/16/2023 10/20/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 10/16/2023 10/20/2023 IP 71151 000746 Performance Indicator Verification Access Control, Equipment, Sec Trng, Sec Plan Review, PI, ISFSI- SB 3 1 10/16/2023 10/20/2023 IP 71130.02 000734 Access Control 1 10/16/2023 10/20/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 10/16/2023 10/20/2023 IP 71130.07 000739 Security Training 1 10/16/2023 10/20/2023 IP 71130.09 001656 Security Plan Changes 1 10/16/2023 10/20/2023 IP 71151 001338 Performance Indicator Verification 1 10/16/2023 10/20/2023 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations PI&R Biennial Team Inspection - SB 4 1 3/4/2024 3/8/2024 IP 71152B 000747 Problem Identification and Resolution 1 3/18/2024 3/22/2024 IP 71152B 000747 Problem Identification and Resolution EP Exercise Inspection - Seabrook 5 1 4/1/2024 4/5/2024 IP 71114.01 000716 Exercise Evaluation 1 4/1/2024 4/5/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 4/1/2024 4/5/2024 IP 71151 001397 Performance Indicator Verification Focused Engineering Inspection - Aging Related 3 1 4/29/2024 5/3/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection 1 5/13/2024 5/17/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection 71124.07 (REMP) 1 1 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program Prepared on 8/24/2022 8:13:29 AM 2 of 2