EOC Annual Assessment Letter and Report 22
ML100620858
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/03/2010
From: David Lew
Division Reactor Projects I
To: Freeman P
Florida Power & Light Energy Seabrook
BURRITT, AL
References
IR-10-001
Download: ML100620858 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 3, 2010 Mr. Paul Freeman Vice President, North Region FPL Energy Seabrook, LLC Seabrook Nuclear Power Plant cIa Mr. Michael O'Keefe P.O, Box 300 Seabrook, NH 03874

SUBJECT:

ANNUAL ASSESSMENT LETTER - SEABROOK STATION, UNIT 1 (05000443/2010001)

Dear Mr. Freeman:

On February 9, 2010, the NRC staff completed its performance review of Seabrook Station, Unit 1 (Seabrook). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only~-Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, Seabrook operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRC's Action Matrix, based on ail Green performance indicators and one inspection finding having low to moderate significance (White). The finding involved inadequate design control measures during a cooling water flange modification, which resulted in the failure of the B emergency diesel generator in February 2009 (ML092400410) 1.

This plant performance was reviewed as part of the quarterly assessment of Seabrook Station, and documented in an assessment follow-up letter (ML093160351)1.

In response to the White finding and in addition to baseline inspections, we plan to conduct a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when your staff notifies us of your readiness for the inspection. The supplemental inspection will be conducted to provide assurance that the root and contributing causes for the finding are understood, that extent of condition and extent of cause are identified, and to provide assurance that the corrective actions are sufficient to prevent recurrence.

I Designation in parenthesis refers to an ADAlvlS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS.

P. Freeman 2 The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan. we will contact you to discuss the change as soon as possible. Please contact Art Burritt at 610~337-5069 with any questions you may ~ave regarding this letter or the inspection plan.

David C. Lew, Director Division of Reactor Projects Docket Nos. 50-443 License Nos. NFP-86 cc w/encl: Distribution via ListServe Seabrook Station Inspection/ Activity Plan

P. Freeman 3 The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Art Burritt at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely, IRA!

David C. Lew, Director Division of Reactor Projects Distr w/encl: (via e-mail) A. Turilin. DRP John Thompson, NRR S. Collins, RA R Moore, DRP W. Raymond, DRP, SRI M. Dapas, ORA DRS Deputy Diredors J. Johnson, DRP, RI D. Lew, DRP DRS Branch Chiefs (6) E. Jacobs, OA, DRP J. Clifford, DRP D. Silk, DRS L. Trocine, RI OEDO A. Burritt, DRP D. Serenei, PAO RidsNrrPMSeabrook Resource L. Cline, DRP N. Sheehan, PAO RidsNrrDirslpabRes@nrc.gov A. Trocine, DRP R. Barkley, ORA ROPreportsRes@nrc.gov SUNSI Review Complete: ALB (Reviewer's Initials) ML100620858 DOCUMENT NAME: S:\ROP-10 EOC REVIEw\BRANCH 3\lETTERS\2009 EOC - SEABROOK ASSESSMENT LETTERREV4.DOC After declaring this document "An Official Agency Record" it will be released to the Public.

To receive acopy of this document, indicate in the box: 'C' =Copy without atlachmenflenciosure 'E' =Copy with attachmenfJenclosure 'N' =No copy OFFICE RI/DRP RI/DRP NAME WRa mond/ ALB for for ABurriWALB DATE 02/24/10 02124/10 OFFICIAL RECORD COpy

Page 1 of2 Seabrook 0212412010 11:19:25 Inspection I Activity Plan Report 22 01/0112010 - 06/30/2011 Planned Oates Start End Title TI-177 - MANAGING GAS ACCUMULATION IN ECCS 2 1 01111/2010 01/15/2010 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 7111121 - COMPONENT DESIGN BASES INSPECTION 7 0412612010 04130/2010 IP 7111121 Component Design Bases Inspection 05/10/2010 . 05/21/2010 IP 7111121 Component Design Bases Inspection EP EX - EP EXERCISE EVALUATION 5 05103/2010 05/07/2010 IP 7111401 Exercise Evaluation 05103/2010 05/07/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 05103/2010 05107/2010 IP 71151-EP01 Orin/Exercise Performance 05/0312010 05/07'2010 IP 71151-EP02 ERO Drill Participation OSt03/2010 05/07/2010 lP 71151-EP03 Alert & Notification System 11/29 EX -INITIAL OPERATOR LICENSING EXAM 5 10/25'2010 10/2912010 U01694 FY11 - SEABROOK INITIAL OPERATOR EXAM 11129/2010 1211012010 U01694 FY11 - SEABROOK INITIAL OPERATOR EXAM 71124 - OCC RAO SAFETY 08116/2010 08/20/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 08/16/2010 08/20/2010 IP 71124.02 Occupational ALARA Planning and Controls 08/16/2010 08/20/2010 IP 71124.04 Occupational Dose Assessment 711528 - PI&R 4 09/13/2010 09/17/2010 IP 711528 Identification and Resolution of Problems 09/27/2010 10101/2010 IP 711528 Identification and Resolution of Problems 71124 - PUB RAD SAFETY - RADWASTE 0912712010 10/0112010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 0912712010 10/01/2010 IP 71151 Performance Indicator Verification 71124 - OCC RAD SAFETY -INSTRUMENTS 11101/2010 11/05/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124

  • OCC RAe SAFETY - ALARA & ISFSI 1210612010 12110/2010 IP 60855 Operation Of An ISFSI 12/06/2010 12/1012010 IP 71124.04 Occupational Dose Assessment 1210612010 12/1012010 IP 71151 Performance Indicator Verification EP PROGR - EP PROGRAM INSPECTION 02128/2011 03/04/2011 IP 7111402 Radiological Environmental Monitoring Program 02/28/2011 03/0412011 IP 7111403 Emergency Response Organization Augmentation Testing 02/2812011 03/04/2011 IP 7111404 Emergency Action level and Emergency Plan Changes 0212812011 03/04/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and DeficienCies his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 20f 2 Seabrook 02124/2010 11:19:25,"-, Inspection / Activity Plan Report 22 01/01/2010

  • 06/30/2011 Planned Dates

[ Start End Title EP PROGR - EP PROGRAM INSPECTION 02/28/2011 03/0412011 IP 71151*EP01 DrililExercise Performance 02/28/2011 03/04/2011 IP 71151-EP02 ERO Orilt Participation 02/28/2011 03/04/2011 IP 71151*EP03 Alert & Notification System 7111108P -INSERVICE INSPECTION 1 04104/2011 04/15/2011 IP 7111108P Inservice Inspection Activities - PWR 7112402 -ALARA 1 04/25/2011 04/29/2011 IP 71124.02 Occupational ALARA Planning and Conlrqls h'his report does not include INPO and OUTAGE aCtivities.

This report shows only on-site and announced inspection procedures.