March 3, 2004 Mr. Mark E. Warner Site Vice President c/o Mr. James M. Peschel FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874
SUBJECT:
ANNUAL ASSESSMENT LETTER - SEABROOK STATION (REPORT NO. 05000443/2004001)
Dear Mr. Warner:
On February 5, 2004, the NRC staff completed its end-of-cycle plant performance assessment of Seabrook Station. The end-of-cycle review involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2003. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Seabrook Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response Column of the NRCs Action Matrix, based on the White Reactor Coolant System Leakage PI in the Barrier Cornerstone. The PI exceeded the Green/White threshold as the result of a reactor coolant system flow instrument leak that occurred on November 11, 2003.
The leak was terminated early the next day when plant operators closed valves isolating the leak.
We are planning to conduct a Supplemental Inspection (Inspection Procedure 95001) starting on May 10, 2004, to review your corrective actions related to this PI. While plant performance for the most recent quarter is within the Regulatory Response Column of the Action Matrix, plant performance was in the Licensee Response Column of the NRCs Action Matrix during the first three quarters of this assessment period.
The enclosed inspection plan details the inspections scheduled through September 30, 2005.
The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last six months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.
2 Mr. Mark E. Warner As you are aware, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness since the terrorist attacks on September 11, 2001.
We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2004, we plan to continue inspections of order implementation combined with newly developed portions of the security baseline inspection program.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. James Trapp, Chief, Reactor Projects Branch 6, at (610) 337-5186 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
A. Randolph Blough, Director Division of Reactor Projects Docket No.
50-443 License No.
Enclosure:
Seabrook Station Inspection/Activity Plan
3 Mr. Mark E. Warner cc w/encl:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. M. Peschel, Manager - Licensing G. F. St. Pierre, Station Director - Seabrook Station R. S. Kundalkar, FPL Vice President - Nuclear Engineering D. G. Roy, Nuclear Training Manager - Seabrook Station J. Devine, Polestar Applied Technology B. Cheney, Director, Bureau of Emergency Management C. McCombs, Acting Director, MEMA R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire R. Walker, Director, Dept. of Public Health, Commonwealth of Massachusetts M. Metcalf, Seacoast Anti-Pollution League Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer, Massachusetts Municipal Wholesale Electric company R. Shadis, New England Coalition Staff P. Brann, Assistant Attorney General M. S. Ross, Attorney, Florida Power & Light Company Office of the Attorney General Town of Exeter Board of Selectmen Institute of Nuclear Power Operations (INPO)
4 Mr. Mark E. Warner Distribution w/encl: Via E-Mail Region I Docket Room (with concurrences)
H. Miller, RA J. Wiggins, DRA J. Trapp, DRP K. Jenison, DRP D. Screnci, PAO C. ODaniell, DRP G. Dentel, SRI - Seabrook W. Lanning, DRS R. Crlenjak, DRS J. Rogge, DRS L. Doerflein, DRS R. Conte, DRS R. Lorson, DRS J. White, DRS J. Jolicoeur, OEDO D. Roberts, NRR L. Licata, PM, NRR R. Ennis, NRR J. Boska, NRR RidsNrrDipmlipb DOCUMENT NAME: G:\\BRANCH6\\2003 EOC Letters\\Seabrook EOC Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME KJenison/KMJ JTrapp/JMT ABlough/ARB DATE 03/02/04 02/27/04 03/02/04 OFFICIAL RECORD COPY
Seabrook Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2004 12:53:48 Report 22 8
EFG ST
- EFG PILOT INSPECTION Baseline Inspections 01/01/2004 03/31/2004 Equipment Availability and Functional Capability IP 71111.EP 1
Baseline Inspections 01/01/2004 03/31/2004 Post-Maintenance and Surveillance Testing IP 71111.ST 1
4 7111117B
- MODS & 50.59 Baseline Inspections 01/12/2004 01/16/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 01/12/2004 01/16/2004 Permanent Plant Modifications IP 7111117B 1
1 95001
- WHITE PI - RCS LEAKAGE Supplemental Program 05/10/2004 05/14/2004 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 1
1 7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 05/17/2004 05/21/2004 Access Control to Radiologically Significant Areas IP 7112101 1
1 7112201
- PUB RAD SAFETY - RETS Baseline Inspections 07/12/2004 07/16/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
1 7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 08/02/2004 08/06/2004 Radioactive Material Processing and Transportation IP 7112202 1
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 09/13/2004 09/17/2004 ALARA Planning and Controls IP 7112102 1
2 71130
- SECURITY Baseline Inspections 10/11/2004 10/15/2004 Access Authorization IP 7113001 1
Baseline Inspections 10/11/2004 10/15/2004 Access Control IP 7113002 1
Baseline Inspections 10/11/2004 10/15/2004 Fitness For Duty Program IP 7113008 1
Baseline Inspections 10/11/2004 10/15/2004 Performance Indicator Verification IP 71151 1
6 7111401
- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 11/15/2004 11/19/2004 Exercise Evaluation IP 7111401 1
Baseline Inspections 11/15/2004 11/19/2004 Performance Indicator Verification IP 71151 1
1 7112103
- OCC RAD SAFETY Baseline Inspections 11/15/2004 11/19/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
4 71152B
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 11/29/2004 12/03/2004 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 12/13/2004 12/17/2004 Identification and Resolution of Problems IP 71152B 1
3 1/31 EXM
- OPERATOR LICENSING INITIAL EXAM Not Applicable 12/20/2004 12/24/2004 SEABROOK INITIAL EXAM (3/21-25/05)
U01539 1
Not Applicable 01/31/2005 02/04/2005 SEABROOK INITIAL EXAM (3/21-25/05)
U01539 1
6 7111121
- SSDI Baseline Inspections 01/10/2005 01/14/2005 Safety System Design and Performance Capability IP 7111121 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Seabrook Inspection / Activity Plan 01/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2004 12:53:48 Report 22 6
7111121
- SSDI Baseline Inspections 01/24/2005 01/28/2005 Safety System Design and Performance Capability IP 7111121 1
1 7111108P
- INSERVICE INSPECTION Safety Issues 04/04/2005 04/04/2005 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02)
Baseline Inspections 04/04/2005 04/04/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 04/04/2005 04/08/2005 ALARA Planning and Controls IP 7112102 1
1 7111107B
- HEAT SINK Baseline Inspections 05/16/2005 05/20/2005 Heat Sink Performance IP 7111107B 1
1 7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 06/06/2005 06/10/2005 Access Control to Radiologically Significant Areas IP 7112101 1
1 7111112B
- MAINTENANCE RULE Baseline Inspections 06/13/2005 06/17/2005 Maintenance Effectiveness IP 7111112B 1
1 71111.05
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/11/2005 07/15/2005 Fire Protection IP 7111105T 1
1 7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 07/18/2005 07/22/2005 ALARA Planning and Controls IP 7112102 1
1 71111.05
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/25/2005 07/29/2005 Fire Protection IP 7111105T 1
1 71114
- EP PROGRAM & EP PI INSPECTION Baseline Inspections 09/12/2005 09/16/2005 Alert and Notification System Testing IP 7111402 1
Baseline Inspections 09/12/2005 09/16/2005 Emergency Response Organization Augmentation Testing IP 7111403 1
Baseline Inspections 09/12/2005 09/16/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 09/12/2005 09/16/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1
Baseline Inspections 09/12/2005 09/16/2005 Performance Indicator Verification IP 71151 1
1 7112203
- PUB RAD SAFETY - REMP Baseline Inspections 09/26/2005 09/30/2005 Radiological Environmental Monitoring Program IP 7112203 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.