Category:Inspection Report
MONTHYEARIR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 IR 05000443/20220062023-03-0101 March 2023 Annual Assessment Letter for Seabrook Station (Report 05000443/2022006) IR 05000443/20234022023-02-21021 February 2023 Security Baseline Inspection Report 05000443/2023402 (Cover Letter Only) IR 05000443/20220042023-01-30030 January 2023 Integrated Inspection Report 05000443/2022004 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2022001 ML22339A2312022-12-19019 December 2022 Review of the Fall 2021 Steam Generator Tube Inspections IR 05000443/20220102022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000443/2022010 IR 05000443/20220032022-11-22022 November 2022 Reissued Integrated Inspection Report 05000443/2022003 ML22304A1002022-11-0101 November 2022 Integrated Inspection Report 05000443/2022003 IR 05000443/20225022022-09-28028 September 2022 Emergency Preparedness Inspection Report 05000443/2022502 IR 05000443/20220052022-08-31031 August 2022 Updated Inspection Plan for Seabrook Station (Report 05000443/2022005) IR 05000443/20220022022-08-11011 August 2022 Integrated Inspection Report 05000443/2022002 IR 05000443/20224012022-07-0707 July 2022 Security Baseline Inspection Report 05000443/2022401 (Cover Letter Only) IR 05000443/20225012022-05-13013 May 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2022501 IR 05000443/20220012022-05-0202 May 2022 Integrated Inspection Report 05000443/2022001 IR 05000443/20220112022-03-22022 March 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000443/2022011 IR 05000443/20210062022-03-0202 March 2022 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2021006) IR 05000443/20210042022-02-10010 February 2022 Integrated Inspection Report 05000443/2021004 IR 05000443/20210032021-11-10010 November 2021 Integrated Inspection Report 05000443/2021003 IR 05000443/20210052021-09-0101 September 2021 Updated Inspection Plan for the Seabrook Station (Report 05000443/2021005) IR 05000443/20215012021-08-24024 August 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2021501 IR 05000443/20214022021-08-23023 August 2021 Material Control and Accounting Program Inspection Report 05000443/2021402 (Letter Only) IR 05000443/20210022021-08-11011 August 2021 Integrated Inspection Report 05000443/2021002 IR 05000443/20210012021-05-0404 May 2021 Integrated Inspection Report 05000443/2021001 IR 05000443/20210102021-04-20020 April 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000443/2021010 IR 05000443/20214012021-04-0606 April 2021 Security Baseline Inspection Report 05000443/2021401 (Letter Only) IR 05000443/20200062021-03-0303 March 2021 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2020006) IR 05000443/20200042021-02-0202 February 2021 Integrated Inspection Report 05000443/2020004 IR 05000443/20210132021-01-20020 January 2021 Information Request to Support Triennial Baseline Design-Basis Capabilities of Power-Operated Valves Inspection; Inspection Reportt 05000443/2021013 IR 05000443/20200102020-12-0101 December 2020 Biennial Problem Identification and Resolution Inspection Report 05000443/2020010 IR 05000443/20204202020-11-10010 November 2020 Security Inspection Report 05000443/2020420 FOF Report IR 05000443/20200032020-11-0505 November 2020 Integrated International Report 05000443/2020003 SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report IR 05000443/20203012020-09-17017 September 2020 Initial Operator Licensing Examination Report 05000443/2020301 IR 05000443/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000443/2020005) IR 05000443/20200012020-04-29029 April 2020 Integrated Inspection Report 05000443/2020001 and Independent Spent Fuel Storage Installation (ISFSI) Report No. 07200063/2020001 IR 05000443/20204012020-03-10010 March 2020 Security Baseline Inspection Report 05000443/2020401 and Independent Spent Fuel Storage Installation Security Inspection Report 07200063/2020401(Letter Only) IR 05000443/20190062020-03-0303 March 2020 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2019006) IR 05000443/20190042020-02-0505 February 2020 Integrated Inspection Report 05000443/2019004 IR 05000443/20194032019-11-25025 November 2019 Cyber Security Inspection Report 05000443/2019403 (Cover Letter Only) IR 05000443/20190032019-11-0505 November 2019 Integrated Inspection Report 05000443/2019003 IR 05000443/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000443/2019005) 2023-09-08
[Table view] Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Inspection Plan
MONTHYEARML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) IR 05000443/20220062023-03-0101 March 2023 Annual Assessment Letter for Seabrook Station (Report 05000443/2022006) IR 05000443/20220052022-08-31031 August 2022 Updated Inspection Plan for Seabrook Station (Report 05000443/2022005) IR 05000443/20210062022-03-0202 March 2022 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2021006) ML21322A2612021-11-18018 November 2021 Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Teams); Inspection Report 05000443/2022011 IR 05000443/20210052021-09-0101 September 2021 Updated Inspection Plan for the Seabrook Station (Report 05000443/2021005) IR 05000443/20200062021-03-0303 March 2021 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2020006) IR 05000443/20210132021-01-20020 January 2021 Information Request to Support Triennial Baseline Design-Basis Capabilities of Power-Operated Valves Inspection; Inspection Reportt 05000443/2021013 IR 05000443/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000443/2020005) IR 05000443/20190062020-03-0303 March 2020 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2019006) IR 05000443/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000443/2019005) ML19141A0552019-05-21021 May 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000443/2019403 IR 05000443/20180062019-03-0404 March 2019 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2018006) IR 05000443/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000443/2018005) IR 05000443/20170062018-02-28028 February 2018 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Reports 05000443/2017006, 05000443/2017402, And05000443/2017501) IR 05000443/20170052017-08-28028 August 2017 Updated Inspection Plan for Seabrook Station, Unit No. 1 (Report 05000443/2017005) IR 05000443/20160062017-03-0101 March 2017 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2016006) IR 05000443/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Seabrook Nuclear Power Plant, Unit No. 1 (Report 05000443/2016005) IR 05000443/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Seabrook Station, Unit 1 (Report 05000443/2015006) IR 05000443/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2014001) IR 05000443/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000443/2014006 IR 05000443/20130012014-03-0404 March 2014 ROP-14 2013 Seabrook Station Unit 1 Annual Assessment Letter, Report 05000443/2013001, and Inspection Plan ML13246A1072013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan Report 05000443/2013006 IR 05000443/20120012013-03-0404 March 2013 Annual Assessment Letter for Seabrook Station, Unit No. 1 (Report 05000443/2012001) IR 05000443/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Seabrook Station Unit 1 (Report 05000443/2012006) ML12174A0192012-06-0404 June 2012 Paper - Inspection Planned for Week of 9/26/11 with Modes, Chaudhary, Thomas, Sheikh, and Erickson, USNRC IR 05000443/20110012012-03-0505 March 2012 Annual Assessment Letter for Seabrook Station, Unit 1 (Report No. 05000443-11-001) ML1124113402011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Seabrook Station, Unit 1 IR 05000443/20100012011-03-0404 March 2011 Annual Assessment Letter for Seabrook Station, Unit 1, EOC-11 (Report 05000443-10-001) ML1024403952010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Seabrook Station, Unit 1 ML1006208582010-03-0303 March 2010 EOC Annual Assessment Letter and Report 22 ML0924403172009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Seabrook Station, Unit 1 IR 05000443/20090012009-03-0404 March 2009 Annual Assessment Letter - Seabrook Station Unit 1 (05000443/2009001) ML0824700702008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Seabrook, Unit 1 IR 05000443/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Seabrook Station 05000443-08-001) ML0734706872007-12-13013 December 2007 ROP 8 - Seabrook - Change to Inspection Plan, 12/13/07 ML0724309432007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan IR 05000443/20060012006-03-0202 March 2006 Annual Assessment Letter - Seabrook Nuclear Power Station (Report 05000443/2006001) ML0524207202005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Seabrook IR 05000443/20050012005-03-0202 March 2005 Annual Assessment Letter - Seabrook Nuclear Generating Station (Report 05000443/2005001) ML0424402002004-08-30030 August 2004 Seabrook ROP5 Mid-Cycle Performance Review and Inspection Plan ML0406301482004-03-0303 March 2004 Annual Assessment Letter - Seabrook IR 05000443/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Seabrook Station (Report No. 50-443/03-001) IR 05000443/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Seabrook Station (Report No. 50-443/02-001) 2023-08-31
[Table view] |
See also: IR 05000443/2013006
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BOULEVARD, SUITE 100
KING OF PRUSSIA, PENNSYLVANIA 19406-2713
September 3, 2013
Mr. Kevin Walsh, Site Vice President
Seabrook Nuclear Power Plant
NextEra Energy Seabrook, LLC
c/o Mr. Michael Ossing
P. O. Box 300
Seabrook, NH 03874
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2013006)
Dear Mr. Walsh:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most
recent quarterly performance indicators in addition to inspection results and enforcement
actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs
assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Seabrook during the most recent quarter was within
the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix
because all inspection findings had very low (i.e., green) safety significance, and all Pls
indicated that your performance was within the nominal, expected range (i.e., green). On
January 24, 2013, the NRC completed a supplemental inspection for a White finding that
involved the failure of Seabrook Station personnel to adequately critique the performance of an
evaluated emergency preparedness exercise and determined that Seabrook appropriately
addressed the root and contributing causes, extent of condition and corrective actions. The
White finding was removed from the assessment process resulting in Seabrook transitioning
from the Regulatory Response Column to the Licensee Response Column of the NRC's Action
Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC acknowledged your satisfactory completion of all of the commitments in Confirmatory
Action Letter (CAL) 1-12-002, regarding the Alkali-Silica Reaction (ASR) concrete issues in
NRC Inspection Report 05000443/2012009 (ML12338A283) dated December 3, 2012, and
NRC Inspection Report 05000443/2012010 (ML13221A172) dated August 9, 2013. Based on
completion of our review of your CAL commitments and the determination that NextEra's
methods for assessing operability of ASR-affected reinforced concrete structures were
reasonable and generally comprehensive, the NRC has determined that the exit criteria
contained in the September 5, 2012, Deviation Memorandum (ML12242A370) regarding
Seabrook ASR evaluation activities, have been met and our overall level of inspection oversight
will return to those described in the ROP baseline inspection program.
K. Walsh 2
While our review of the CAL items is complete, the NRC plans to continue to provide focused
oversight of NextEras testing being conducted at the Ferguson Structural Engineering
Laboratory at the University of Texas - Austin and your assessment of ASR progression in
Seabrook concrete structures. Our inspection activities will be conducted using our annual
follow-up of selected Problem Identification and Resolution samples. While tentative dates for
these inspections are included in the attached inspection schedule, we understand that your
testing schedule is subject to change and we will coordinate closely with your ASR project
management staff to select the most advantageous opportunities to observe your activities.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan. In
addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review
of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
and Tanks and Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel
Storage Installation at Operating Plants. The inspections listed during the last nine months of
the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and
personnel availability issues. The NRC will contact you as soon as possible to discuss changes
to the inspection plan should circumstances warrant any changes. This inspection plan does
not include security-related inspections, which will be sent via separate, non-publicly available
correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of
the NRCs Rules of Practice, a copy of this letter will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Please contact Glenn Dentel at 610-337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director
Division of Reactor Projects
Docket Nos.: 50-443
License Nos.: NPF-86
Enclosure: Inspection Plan
cc w/encl: Distribution via ListServ
ML13246A107
Non-Sensitive Publicly Available
SUNSI Review
Sensitive Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP RI/DRP
NAME PCataldo/PC via email MDraxton/MD GDentel/ GTD DRoberts/ DJR
DATE 08/28 /13 08/ 28 /13 08/28/13 09/02 /13
Page 1 of 2 Seabrook
08/05/2013 11:36:21 Inspection / Activity Plan
Report 22
07/01/2013 - 12/31/2014
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
EXM 7/16 - SEABROOK INITIAL EXAM 5
1 07/15/2013 07/20/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM
EP PROGR - EP PROGRAM INSPECTION 1
1 07/15/2013 07/19/2013 IP 7111402 Alert and Notification System Testing
1 07/15/2013 07/19/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1 07/15/2013 07/19/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
71124 - REMP 1
1 07/22/2013 07/26/2013 IP 71124.07 Radiological Environmental Monitoring Program
ISFSI - ISFSI LOADING INSPECTION 4
1 08/05/2013 08/09/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
7111111B - SEABROOK REQUAL INSP WITH P/F RESULTS 2
1 10/28/2013 11/01/2013 IP 7111111B Licensed Operator Requalification Program
ASR - PI&R SAMPLE - ASR MONITORING 2
1 09/23/2013 09/27/2013 IP 71152 Problem Identification and Resolution
71151 - HP PI VERIFICATION 1
1 12/02/2013 12/02/2013 IP 71151 Performance Indicator Verification
ASR - PI&R SAMPLE - ASR MONITORING 2
1 02/10/2014 02/14/2014 IP 71152 Problem Identification and Resolution
71124 - RAD HAZARD & ALARA 1
1 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls
TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1
1 03/17/2014 03/21/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
7111108P - INSERVICE INSPECTION 1
1 04/07/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR
71124 - HP INSPECTION IP 71124.01, 02, 03 & 04 1
1 04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls
1 04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
1 04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment
TRI FI - TRIENNIAL FIRE PROTECTION 7
1 06/23/2014 06/27/2014 IP 7111105T Fire Protection [Triennial]
1 07/07/2014 07/11/2014 IP 7111105T Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Seabrook
08/05/2013 11:36:21 Inspection / Activity Plan
Report 22
07/01/2013 - 12/31/2014
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
71152B - PI&R BIENNIAL 1
1 08/04/2014 08/09/2014 IP 71152B Problem Identification and Resolution
1 08/18/2014 08/23/2014 IP 71152B Problem Identification and Resolution
71124.05 - HP INSPECTION RAD INSTRUMENTATION 1
1 08/11/2014 08/15/2014 IP 71124.05 Radiation Monitoring Instrumentation
ASR - PI&R SAMPLE - ASR MONITORING 2
1 08/11/2014 08/15/2014 IP 71152 Problem Identification and Resolution
71124.08 - RADWASTE 1
1 08/18/2014 08/22/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EP EXER - EP EXERCISE INSPECTION 1
1 11/03/2014 11/07/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.