ML073470687

From kanterella
Jump to navigation Jump to search
ROP 8 - Seabrook - Change to Inspection Plan, 12/13/07
ML073470687
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/13/2007
From: Arthur Burritt
Reactor Projects Branch 3
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
BURRITT, AL
References
Download: ML073470687 (3)


Text

December 13, 2007 Mr. Gene St. Pierre Site Vice President FPL Energy Seabrook, LLC Seabrook Station c/o James M. Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE SEABROOK STATION

Dear Mr. St. Pierre:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

G. Pierre 2 Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor ProjectsI Docket No. 50-443 License No. NPF-86

Enclosures:

Seabrook Station Inspection/Activity Plans cc w/encl:

J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company J. M. Peschel, Manager, Regulatory Programs M. Kiley, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Dir, Radiation Control Program, Dept of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League

G. Pierre 2 Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor ProjectsI Distribution w/encl:

S. Collins, RA Region I Docket Room (with concurrences)

M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS A. Burritt, DRP J. White, DRS C. Khan, DRP L. Doerflein, DRS L. Cline, DRP R. Conte, DRS W. Raymond, DRP, SRI L. Scholl, DRS G. West, RI OEDO (Acting) P. Frechette, DRS H. Chernoff, NRR D. Silk, DRS J. Lubinski, NRR D. Screnci, PAO E. Miller, NRR, PM N. Sheehan, PAO R. Ennis, NRR, Backup R. Barkley, ORA T. Valentine, NRR D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)

SUNSI Review Complete: LC (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH3\ROP 8 Letters\SEABROOKROPrealignment.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/LC ABurritt/

DATE 12/07/07 12/11/07 OFFICIAL RECORD COPY

Page 1 of 1 Seabrook 12/11/2007 14:32:39 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112101 - OCC RAD SAFETY - ACCESS 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/14/2008 01/18/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1 IP 7112102 ALARA Planning and Controls 04/14/2008 04/18/2008 Baseline Inspections 7111108P - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/14/2008 04/18/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 04/21/2008 04/25/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/21/2008 04/25/2008 Safety Issues TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP 7111105T Fire Protection [Triennial] 07/14/2008 07/18/2008 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 07/28/2008 08/01/2008 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 09/29/2008 10/03/2008 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/03/2008 11/07/2008 Baseline Inspections EP - EP EXERCISE EVALUATION 4 1 IP 7111401 Exercise Evaluation 11/03/2008 11/07/2008 EP Baseline Inspectio 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/03/2008 11/07/2008 EP Baseline Inspectio 1 IP 71151-EP01 Drill/Exercise Performance 11/03/2008 11/07/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 11/03/2008 11/07/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 11/03/2008 11/07/2008 Baseline Inspections 71152B - PI&R 6 1 IP 71152B Identification and Resolution of Problems 11/17/2008 11/21/2008 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 12/01/2008 12/05/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.