ROP 8 - Seabrook - Change to Inspection Plan, 12/13/07
ML073470687
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/13/2007
From: Arthur Burritt
Reactor Projects Branch 3
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
BURRITT, AL
References
Download: ML073470687 (3)


Text

December 13, 2007 Mr. Gene St. Pierre Site Vice President FPL Energy Seabrook, LLC Seabrook Station c/o James M. Peschel P.O. Box 300 Seabrook, NH 03874

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE SEABROOK STATION

Dear Mr. St. Pierre:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

G. Pierre 2

Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor ProjectsI Docket No. 50-443 License No. NPF-86

Enclosures:

Seabrook Station Inspection/Activity Plans cc w/encl:

J. A. Stall, FPL Senior Vice President, Nuclear & CNO M. Warner, Vice President, Nuclear Operations R. S. Kundalkar, FPL Vice President, Nuclear Technical Svcs M. Mashhadi, Senior Attorney, Florida Power & Light Company M. S. Ross, Managing Attorney, Florida Power & Light Company J. M. Peschel, Manager, Regulatory Programs M. Kiley, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Dir, Radiation Control Program, Dept of Public Health, Commonwealth of MA C. Pope, Director, Homeland Security & Emergency Management, State of NH J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League

G. Pierre 2

Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Arthur Burritt, Chief Projects Branch 3 Division of Reactor ProjectsI Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP C. Khan, DRP L. Cline, DRP W. Raymond, DRP, SRI G. West, RI OEDO (Acting)

H. Chernoff, NRR J. Lubinski, NRR E. Miller, NRR, PM R. Ennis, NRR, Backup T. Valentine, NRR J. Thompson, NRR (JWT1@nrc.gov)

Region I Docket Room (with concurrences)

J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA SUNSI Review Complete: LC (Reviewer====s Initials)

DOCUMENT NAME: T:\\DRP\\BRANCH3\\ROP 8 Letters\\SEABROOKROPrealignment.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/LC ABurritt/

DATE 12/07/07 12/11/07 OFFICIAL RECORD COPY

Seabrook Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 12/11/2007 14:32:39 Report 22 1

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 01/14/2008 01/18/2008 1

7112101 IP Access Control to Radiologically Significant Areas 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 04/14/2008 04/18/2008 1

7112102 IP ALARA Planning and Controls 1

7111108P

- INSERVICE INSPECTION Baseline Inspections 04/14/2008 04/18/2008 1

7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 04/21/2008 04/25/2008 1

7111108P IP Inservice Inspection Activities - PWR 1

TI-166

- CONTAINMENT SUMP MODIFICATIONS Safety Issues 04/21/2008 04/25/2008 1

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

3 TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/14/2008 07/18/2008 1

7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/28/2008 08/01/2008 1

7111105T IP Fire Protection [Triennial]

1 7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 09/29/2008 10/03/2008 1

7112202 IP Radioactive Material Processing and Transportation 1

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 11/03/2008 11/07/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 4

EP

- EP EXERCISE EVALUATION EP Baseline Inspectio 11/03/2008 11/07/2008 1

7111401 IP Exercise Evaluation EP Baseline Inspectio 11/03/2008 11/07/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/03/2008 11/07/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/03/2008 11/07/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 11/03/2008 11/07/2008 1

71151-EP03 IP Alert & Notification System 6

71152B

- PI&R Baseline Inspections 11/17/2008 11/21/2008 1

71152B IP Identification and Resolution of Problems Baseline Inspections 12/01/2008 12/05/2008 1

71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.