rch 4, 2019

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2018006)

Dear Mr. Nazar,

The NRC has completed its end-of-cycle performance assessment of Seabrook Station, Unit 1 (Seabrook), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Seabrook during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)

Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Seabrook.

The enclosed inspection plan lists the inspections scheduled through December 31, 2020. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections). Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. Furthermore, all the inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the baseline inspections, the NRC will conduct Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. As previously noted in the August 28, 2018, Updated Inspection Plan for Seabrook Station, Unit No. 1 (Report 05000443/2018005; ADAMS Accession No. ML18228A565) regarding the Alkali-Silica Reaction (ASR) concrete issues, in addition to baseline inspections, the NRC will continue to provide focused oversight of NextEras assessment of ASR progression in Seabrooks concrete structures using Problem Identification and Resolution (PI&R) annual samples. While tentative dates for these ongoing inspections are included in the attached inspection schedule, we understand that your schedule is subject to change. We will coordinate closely with your ASR project management staff to select the most appropriate opportunities to inspect your activities.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5312 with any questions you have regarding this letter.

Sincerely,

/RA/

Brice Bickett, Chief Project Branch 3 Division of Reactor Projects Docket No. 50-443 License No. NPF-86 Enclosure:

Seabrook Inspection Plan

ML19064B383 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME PCataldo/MH MHenrion BBickett DATE 2/25/19 2/25/19 2/27/19

IP 22 Inspection Activity Plan Report Seabrook 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RETS 1 1 01/28/2019 02/01/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Annual Sample - ASR 1 1 04/07/2019 04/13/2019 IP 71152 000748 Problem Identification and Resolution EP PROGRAM INSPECTION 2 1 04/08/2019 04/12/2019 IP 71114.02 000717 Alert and Notification System Testing 1 04/08/2019 04/12/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 04/08/2019 04/12/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 04/08/2019 04/12/2019 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSP - TEAMS 6 1 04/14/2019 04/20/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 04/28/2019 05/04/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 1 04/22/2019 04/26/2019 IP 71130.02 000734 Access Control 1 04/22/2019 04/26/2019 IP 71130.05 000737 Protective Strategy Evaluation 1 04/22/2019 04/26/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1 04/22/2019 04/26/2019 IP 71151 001338 Performance Indicator Verification HP 1 1 05/13/2019 05/17/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 05/13/2019 05/17/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 05/13/2019 05/17/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 05/13/2019 05/17/2019 IP 71124.04 000728 Occupational Dose Assessment 1 05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation HP 1 1 07/22/2019 07/26/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 07/22/2019 07/26/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 07/22/2019 07/26/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation REMP 1 1 09/09/2019 09/13/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

2/11/2019 5:45:39 AM

IP 22 Inspection Activity Plan Report Seabrook 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count CYBER FULL IMP 4 1 10/07/2019 10/11/2019 IP 71130.10P 000741 Cyber Security 1 10/28/2019 11/01/2019 IP 71130.10P 000741 Cyber Security Annual Sample - ASR 1 1 10/27/2019 11/02/2019 IP 71152 000748 Problem Identification and Resolution HP 1 1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/18/2019 11/22/2019 IP 71124.04 000728 Occupational Dose Assessment 1 11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification SEABROOK REQUAL INSP W/ P/F RESULTS 2 1 12/02/2019 12/06/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

1 12/02/2019 12/06/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

Access Authorization and Control, Fitness for Duty, and ISFSI 3 1 01/27/2020 01/31/2020 IP 71130.01 000733 Access Authorization 1 01/27/2020 01/31/2020 IP 71130.02 000734 Access Control 1 01/27/2020 01/31/2020 IP 71130.08 000740 Fitness For Duty Program 1 01/27/2020 01/31/2020 IP 71151 001338 Performance Indicator Verification 1 01/27/2020 01/31/2020 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Radwaste 1 1 02/03/2020 02/07/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 1 1 1 04/06/2020 04/17/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

2/11/2019 5:45:39 AM

IP 22 Inspection Activity Plan Report Seabrook 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count HP 1 1 05/11/2020 05/15/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 05/11/2020 05/15/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS 7 1 06/15/2020 06/19/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 07/06/2020 07/10/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing SEABROOK INITIAL OL EXAM 4 1 07/06/2020 07/10/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 08/03/2020 08/14/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

TRIENNIAL FIRE PROTECTION 4 1 07/27/2020 07/31/2020 IP 71111.05T 000696 Fire Protection (Triennial)

1 08/10/2020 08/14/2020 IP 71111.05T 000696 Fire Protection (Triennial)

HP 1 1 08/17/2020 08/21/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 08/17/2020 08/21/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 08/17/2020 08/21/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 08/17/2020 08/21/2020 IP 71124.04 000728 Occupational Dose Assessment 1 08/17/2020 08/21/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation SEABROOK EP EXERCISE INSPECTION 5 1 09/28/2020 10/02/2020 IP 71114.01 000716 Exercise Evaluation 1 09/28/2020 10/02/2020 IP 71151 001397 Performance Indicator Verification PI&R Biennial Team Inspection 4 1 10/19/2020 10/23/2020 IP 71152B 000747 Problem Identification and Resolution 1 11/02/2020 11/06/2020 IP 71152B 000747 Problem Identification and Resolution HP 1 1 11/02/2020 11/06/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/02/2020 11/06/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/02/2020 11/06/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/02/2020 11/06/2020 IP 71124.04 000728 Occupational Dose Assessment This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

2/11/2019 5:45:39 AM

IP 22 Inspection Activity Plan Report Seabrook 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count HP 1 1 11/02/2020 11/06/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.