{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2006
{{#Wiki_filter:Page 1 of 2                                                                                      Robinson 08/30/2006    15:40:16                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                      on Site       Start    End              Type 2515/169       - TI 2515/169 - MSPI VERIFICATION                                                                           1 2            IP 2515/169              Mitigating Systems Performance Index Verification                                                    08/01/2006 12/31/2006 Safety Issues DRP/BR4       - PI&R                                                                                                     3 2            IP 71152B                Identification and Resolution of Problems                                                            10/02/2006 10/20/2006 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                         5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     01/08/2007 01/12/2007 Not Applicable PSB1-RP        - RP PUBLIC INSPECTION                                                                                      3 2           IP 7112103               Radiation Monitoring Instrumentation and Protective Equipment                                       01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             01/08/2007 01/12/2007 Baseline Inspections 2           IP 7112203               Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             01/08/2007 01/12/2007 Baseline Inspections 2           IP 71151                 Performance Indicator Verification                                                                   01/08/2007 01/12/2007 Baseline Inspections OL EXAM        - INITIAL EXAM                                                                                              5 2               V23242               ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES                                                     02/05/2007 02/16/2007 Not Applicable OL RQ         - REQUAL INSPECTION                                                                                         3 2            IP 7111111B              Licensed Operator Requalification Program                                                            02/26/2007 03/02/2007 Baseline Inspections EB3-ISI       - U2 INSERVICE INSPECTION                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/16/2007 04/20/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                                             2 2           IP 7112101               Access Control to Radiologically Significant Areas                                                   04/16/2007 04/20/2007 Baseline Inspections 2           IP 7112102               ALARA Planning and Controls                                                                         04/16/2007 04/20/2007 Baseline Inspections 2           IP 71151                 Performance Indicator Verification                                                                   04/16/2007 04/20/2007 Baseline Inspections EB3SGISI       - U2 STEAM GENERATOR ISI                                                                                   1 2            IP 7111108P              Inservice Inspection Activities - PWR                                                                04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)                                                                         2 2           IP 71111                 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity                             04/29/2007 05/04/2007 Baseline Inspections PS2-EP         - EP INSP                                                                                                   1 2            IP 71151                Performance Indicator Verification                                                                  06/25/2007 06/29/2007 Baseline Inspections EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                         6 2            IP 7111121              Component Design Bases Inspection                                                                    06/25/2007 06/29/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   07/16/2007 07/20/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   07/30/2007 08/03/2007 Baseline Inspections 2           IP 7111121               Component Design Bases Inspection                                                                   08/13/2007 08/17/2007 Baseline Inspections 60855.1       - OPERATIONAL ISFSI INSPECTION BY RESIDENT                                                                 1 2           IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                     07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities.                                                                                                 Enclosure This report shows only on-site and announced inspection procedures.
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1 2515/169-TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2  2515/169 IP Mitigating Systems Performance Index Verification 3 DRP/BR4-PI&R Baseline Inspections 10/02/2006 10/20/2006 2  71152B IP Identification and Resolution of Problems 5 OL PREP-INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2   V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 PSB1-RP-RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2   7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2   7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2   7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2   71151 IP Performance Indicator Verification 5 OL EXAM-INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2   V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3 OL RQ-REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2  7111111B IP Licensed Operator Requalification Program 1 EB3-ISI-U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2  7111108P IP Inservice Inspection Activities - PWR 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2   7112102 IP A LARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2   71151 IP Performance Indicator Verification 1 EB3SGISI-U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2  7111108P IP Inservice Inspection Activities - PWR 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
 
Baseline Inspections 04/29/2007 05/04/2007 2   71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1 PS2-EP-EP INSP Baseline Inspections 06/25/2007 06/29/2007 2  71151 IP Performance Indicator Verification 6 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2   7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2  7111121 IP Component Design Bases Inspection 1 60855.1-OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2   60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                                Robinson 08/30/2006    15:40:16                                                          Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                      No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                              Title                        on Site       Start    End            Type TFP           - TRIENNIAL FP - INFO TRIP                                                             5 2            IP 7111105T              Fire Protection [Triennial]                                                      10/02/2007 10/04/2007 Baseline Inspections TFP            - TRIENNIAL FIRE PROTECTION INSP                                                        5 2           IP 7111105T             Fire Protection [Triennial]                                                     10/22/2007 10/26/2007 Baseline Inspections 2           IP 7111105T             Fire Protection [Triennial]                                                     11/05/2007 11/09/2007 Baseline Inspections PS2-EP         - EP EXERCISE                                                                           2 2           IP 7111401               Exercise Evaluation                                                             12/03/2007 12/07/2007 Baseline Inspections 2           IP 7111404               Emergency Action Level and Emergency Plan Changes                               12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP01           Drill/Exercise Performance                                                       12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP02           ERO Drill Participation                                                         12/03/2007 12/07/2007 Baseline Inspections 2           IP 71151-EP03           Alert & Notification System                                                     12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5 TFP-TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2   7111105T IP Fire Protection [Triennial]
5 TFP-TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2   7111105T IP Fire Protection [Triennial]
Baseline Inspections 11/05/2007 11/09/2007 2  7111105T IP Fire Protection [Triennial]
2 PS2-EP-EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2   7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2   7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2   71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:32, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430442
Person / Time
Site: Robinson, 07200003, 07200060  Duke Energy icon.png
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Walt T
Carolina Power & Light Co
Shared Package
ML062430434 List:
References
Download: ML062430442 (2)


Text

Page 1 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 2 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues DRP/BR4 - PI&R 3 2 IP 71152B Identification and Resolution of Problems 10/02/2006 10/20/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 01/08/2007 01/12/2007 Not Applicable PSB1-RP - RP PUBLIC INSPECTION 3 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/08/2007 01/12/2007 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/08/2007 01/12/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 01/08/2007 01/12/2007 Baseline Inspections OL EXAM - INITIAL EXAM 5 2 V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 02/05/2007 02/16/2007 Not Applicable OL RQ - REQUAL INSPECTION 3 2 IP 7111111B Licensed Operator Requalification Program 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 2 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 2 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 2 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/29/2007 05/04/2007 Baseline Inspections PS2-EP - EP INSP 1 2 IP 71151 Performance Indicator Verification 06/25/2007 06/29/2007 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 2 IP 7111121 Component Design Bases Inspection 06/25/2007 06/29/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/16/2007 07/20/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 07/30/2007 08/03/2007 Baseline Inspections 2 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 08/30/2006 15:40:16 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TFP - TRIENNIAL FP - INFO TRIP 5 2 IP 7111105T Fire Protection [Triennial] 10/02/2007 10/04/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION INSP 5 2 IP 7111105T Fire Protection [Triennial] 10/22/2007 10/26/2007 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 11/05/2007 11/09/2007 Baseline Inspections PS2-EP - EP EXERCISE 2 2 IP 7111401 Exercise Evaluation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP01 Drill/Exercise Performance 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP02 ERO Drill Participation 12/03/2007 12/07/2007 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 12/03/2007 12/07/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.