Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/08
ML062430442
Person / Time
Site: Robinson, 07200003, 07200060  Duke Energy icon.png
Issue date: 08/31/2006
From: Binoy Desai
NRC/RGN-II/DRP/RPB4
To: Walt T
Carolina Power & Light Co
Shared Package
ML062430434 List:
References
Download: ML062430442 (2)


Text

Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:40:16 Report 22 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 2

2515/169 IP Mitigating Systems Performance Index Verification 3

DRP/BR4

- PI&R Baseline Inspections 10/02/2006 10/20/2006 2

71152B IP Identification and Resolution of Problems 5

OL PREP

- INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 2

V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3

PSB1-RP

- RP PUBLIC INSPECTION Baseline Inspections 01/08/2007 01/12/2007 2

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/08/2007 01/12/2007 2

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 2

7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/08/2007 01/12/2007 2

71151 IP Performance Indicator Verification 5

OL EXAM

- INITIAL EXAM Not Applicable 02/05/2007 02/16/2007 2

V23242 ROBINSON/FEBRUARY 2007 EXAM AT POWER FACILITIES 3

OL RQ

- REQUAL INSPECTION Baseline Inspections 02/26/2007 03/02/2007 2

7111111B IP Licensed Operator Requalification Program 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP Baseline Inspections 04/16/2007 04/20/2007 2

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/16/2007 04/20/2007 2

7112102 IP ALARA Planning and Controls Baseline Inspections 04/16/2007 04/20/2007 2

71151 IP Performance Indicator Verification 1

EB3SGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Baseline Inspections 04/29/2007 05/04/2007 2

71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 1

PS2-EP

- EP INSP Baseline Inspections 06/25/2007 06/29/2007 2

71151 IP Performance Indicator Verification 6

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 06/25/2007 06/29/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 07/16/2007 07/20/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 07/30/2007 08/03/2007 2

7111121 IP Component Design Bases Inspection Baseline Inspections 08/13/2007 08/17/2007 2

7111121 IP Component Design Bases Inspection 1

60855.1

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 2

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Robinson Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:40:16 Report 22 5

TFP

- TRIENNIAL FP - INFO TRIP Baseline Inspections 10/02/2007 10/04/2007 2

7111105T IP Fire Protection [Triennial]

5 TFP

- TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 10/22/2007 10/26/2007 2

7111105T IP Fire Protection [Triennial]

Baseline Inspections 11/05/2007 11/09/2007 2

7111105T IP Fire Protection [Triennial]

2 PS2-EP

- EP EXERCISE Baseline Inspections 12/03/2007 12/07/2007 2

7111401 IP Exercise Evaluation Baseline Inspections 12/03/2007 12/07/2007 2

7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP02 IP ERO Drill Participation Baseline Inspections 12/03/2007 12/07/2007 2

71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.